Property:Measures values
Jump to navigation
Jump to search
This is a property of type String.
U
Creation of pools and riffles,,Creation of fish passes,Channel widening, ,,Community Events, River open days, School Tours,, +
R
Creation of pools, Creation of berms,,Creation of two stage channel,,Creation of meanders, Channel narrowing, Riparian planting, ,,, +
B
Creation of pools, Fish habitat restoration, Introducing large woody debris, Habitat restoration,,Habitat creation, Tree management,,Channel narrowing, Re-meandering, ,,Community involvement,, +
A
Aesthetic vs. functional restoration of urban and peri-urban rivers: the Manzanares River in Madrid +
Creation of ramp,,Reforestation and restoration of watercourses, Develop riparian forest, Riparian planting,, ,,Awareness raising by a sign,, +
S
Creation of revetments, Fenced off riverbank, Bank stabilisation, Cut back of trees, Tree management,,Removal of sediments,,Change in bed profile, ,,, +
N
Creation of shoulders, Embankment creation, Creation of pools,,Ensure floodplains left unmodified,Channel narrowing, Maintain water vole habitat,,, +
S
Creation of stone steps, planting of vegetation on terraces, Weir construction,, ,,, +
A
Austria cross-border section - River widening measure Gosdorf I (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007) +
Creation of undercut banks, Restoration of the connection of side arms, Creation of Slips, Creation of fords, Creation of potholes, Creation of gravel banks,, ,,, +
H
Creation of wooden deflectors, Cleaning of spawning gravels,,Fencing, Tree planting,, ,,, +
B
Creation of wooden deflectors, Habitat diversification, Cleaning of spawning gravels,Riparian planting,,Channel narrowing, Adding sinuosity, Removal of sluice gates, Creation of fish passes, Channel naturalisation, ,,, +
R
Creation of wooden deflectors, Introducing large woody debris,,, ,,, +
M
Creation of wooden deflectors,,Floodplain reconnection,,Introducing large woody debris, silt depositon on the flood plain ,,, +
D
Culvert replacement/repair, Bank reprofiling,,Riparian planting, Sustainable urban drainage ponds (SUDs),,Deculverting, ,,Improved public access, Information panels for people, Riverside walkway,, +
L
Culvert replacement/repair, silt-trapping weir installation, habitat improvements, Rock ramp construction, Creation of fish passes,,Construction of flood wall,,Removal of pond to restore natural course and sediment transport. Diversion of water main and supporting beam - obstruction to flow.,,, +
S
Culvert replacement/repair,,, ,,, +
R
Cut back of plants, Introduction of spawning gravels, Creation of mini-treshold, Creation of pools, sediment, Sediment trap building,,Erosion protection,, ,Reduced pollution, Flow management,,, +
Cut back of plants,Riffle creation,Placement of log steps to prevent erosion from deer,Bed raising,Placement of faggots,Protect/restore riparian zone,,Channel narrowing, Adding sinuosity, ,Easier management,, +
B
Dam removal, Creation of fish passes,,,Dam removal, Creation of fish passes ,,, +
R
Dam removal, Dredging of channel, Removal of island, Riverbed dug out,,Replanting of banks, removal of bunds, Reinforcing of banks, ,extension of water treatment outlet,, +
Dam removal, Dredging of sediment (mud), Removal of sediment,,, ,,, +