Property:Measures values

From RESTORE
Jump to navigation Jump to search

This is a property of type String.

Showing 20 pages using this property.
E
Conditioning of the banks of the stream and lagoons.,Elimination of allochthonous plant species, General cleaning of the area, removal of rubble and rubbish; Reforestation of the Park with local plant species (and equipped with an irrigation network); improve existing roads and paths (3.65 km) and new pedestrian paths were planned (3.65 km); Urban furniture; Construction of a small building located in a point of maximum elevation that allows the observation of the environment,,Metropolitan park (social engagement); Bird observatory and recovery, organization of workshops and events for schools and other groups, exhibitions on the fauna and flora of the area,  +
K
Connection between river channel and former side branches, Riverbed dug out,,, ,Grazing,Creation of visitors centre, Exposition about the past of Keent,  +
A
Construction gravel bays, Creation of islands, Removal of bank reinforcements,,, ,,,  +
Construction of a bypass channel, Dam removal, Creation of fish passes, Creation of lateral dike to regulate flows, Application of plant-engineering, Riparian planting,,Remeandering, Creation of wetland,, ,The banks are maintained if necessary by vegetal engineering,,  +
R
Construction of a bypass channel, Installation of metal sheet piles, Structures were improved for fish continuity,, ,Plots adjacent to streams are managed extensively. Farmers have contracted agri-environmental measures prohibiting the amendments.,,  +
C
Construction of a defensive wall to prevent river pollution,After decontamination, removal of the defensive wall,, ,,,  +
S
Construction of dams, construction of small retention facilities, Planting forest, Creation of ponds, Creation of stone tresholds,, ,,,  +
C
Construction of flood channels, Removal of material, Pond creation, Side channel creation, setting up of check valves & pumping stations,Tree planting, Planting of helophytes at the foot of banks,,Channel widening, ,,,  +
R
Construction of weak and identical slopes on straight sections, Construction of steep slopes to promote erosion and natural deposits in meandering sections, Restoring riparian vegetation, Creation of pools,,,Creation of meanders, Fences, troughs and pontoons are placed.,Before the works, a selective management of riparian forest and the removal of fences are necessary to facilitate access to the machines, An electric rescue fishing is carried out, The stream is temporarily diverted to a reach at proximity in order to work "out of water" and cross the old meanders with the current course,,  +
Create breaches in the bank,,Creation of backwaters, Creation of wet woodland, Creation of wetland, Creation of pond,, ,,Boards-Interpretation areas will be installed to disseminate information and engage and educate local users, Decreased flood risk, Improved public access,,  +
B
Create breaches in the bank,,Floodplain reconnection, Riparian planting,,Channel naturalisation, ,,,  +
T
Create breaches in the bank,,Reconnecting polder, ,,,  +
Create breaches in the bank,Creation of wetland, ,,,  +
Create breaches in the bank,Creation of wetland,Reconnecting polder ,,,  +
Create breaches in the bank,Creation of wetland,Reconnecting polder, ,,,  +
S
Created canoe access points,, ,,,  +
C
Creation of a bypass, Creation of banks, Installation of a mobile threshold, Installation of a valve rack,,, ,,,  +
T
S
Creation of backwaters, Creation of fish refuge areas, Embankment lowering,,Creation of wetland, Floodplain reconnection, Habitat enhancement, Tree planting,, Recovering natural landscapes,,Removal of invasive species, Land management,Engagement with schools, Engagement with a wide range of stakeholders, Community consultation, Community involvement,,Sediment fingerprinting study to identify inputs into the River Soar catchment  +
B
Creation of backwaters,,,Channel realignment, ,,,  +