Property:Measures values
Jump to navigation
Jump to search
This is a property of type String.
B
Bank reprofiling,Reedbed creation, UK BAP habitat creation/restoration,,,Improved public access, Community Education,, +
W
Bank reprofiling,Reedbed creation,,Creation of meanders, Creation of pond ,,, +
R
Bank reprofiling,Tree management, ,,, +
Bank reprofiling,Tree management, ,,Improved public access, Community Education,, +
Bank reprofiling,Tree management,Creation of backwater ,,, +
Bank stabilisation using engineered wood structures; sediment management,, Set-back fencing & riparian planting,,, +
Bank stabilisation, Bank protection,,, ,,, +
Bank stabilisation, Partial weir removal, Cobble placement,, ,,'Trout in the Town' project raising the awareness of the river's value in schools, +
S
Bank stabilisation, Restoration of natural vegetation, Removal of invasive plants, Removal of invasive species, Bank improvement,,, ,Reducing bank side collapse (source of sediment),,Awareness raising, Community involvement, Citizen participation in the restoration project, the site is used by several schools and Thames Explorer Trust, +
I
Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage. +
Bank stabilisation, Restoration of natural vegetation,,Improve longitudinal connectivity, Fish habitat restoration,,,Improved network of trails,Information panels for people, +
H
Bank stabilisation, habitat creation,Floodplain reconnection, floodplain scrapes, floodplain woodland planting,Opening long sections of culverts, leaky woody dams Run-off interception, diversion, attenuation,Soil managment and land use to improve infiltration and water quality,Working with Parish Councils and Flood Action Groups, +
W
Bank stabilisation,,, ,,, +
H
Bank stabilisation,,,Channelling ,,, +
A
Bank stabilisation,,,Increase in-channel hydromorphological diversity, ,,, +
R
Bank stabilisation,,Creation of wetland, Vegetation management,,Channel narrowing, ,Fencing,,, +
T
The Manzanares River Restoration: Demolition of an obsolete dam and riverine ecosystem rehabilitation +
Bank stabilisation,Dam removal,Riparian planting, ,,, +
E
Bank stabilisation,New bioengineering elements in order to stabilize slope banks,Revetmens with local species,,Protection and correction of incision problems ,,, +
Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba) +
Bank stabilisation,Prevent and reduce bank erosion with live stakes,Silvicultural treatments,Protection and correction of incision problems,Improvement of channel morphology ,,, +
R
Bank stabilisation,Riparian habitat restoration, Control of invasive species,, ,,, +
Banks were sloped, Returning of water to the river, Tree planting, Planting, Weir removal, Riverbed restoration, Helophytes planted,,, Fences and animal feeders were installed, Bridges built,Fish were caught before the work began,, +