Property:Measures values

From RESTORE
Jump to navigation Jump to search

This is a property of type String.

Showing 20 pages using this property.
P
Bank improvement, Removal of croys and embankments, Bed load addition,Riparian planting, Water margin fencing, ,Diffuse pollution mitigation,Raise awareness of the problems pearl mussels face among land managers and river users, Engagement with schools,,  +
R
Bank improvement, Weir removal, Bed reprofiling, Riverbank revegetation,,, ,,,  +
G
Bank improvement, creation of intertidal terraces,, ,,,  +
R
Bank improvement, island restoration,reconnection of oxbow, ,,,  +
Bank improvement,,Barrier removal,, ,Riparian Management to increase the amount of light getting through the canopy, promote natural re-growth of bankside plants and increase levels of bank stability and stabilise the spread of Phytophthora amongst the Alders, reducing bank side collapse (another main source of sediment),,Integrated catchment management approach, Community engagement, Local support  +
Bank improvement,,Displacement of flood defenses,, SUDS, green roofs,,,Riverside walkway,,  +
Bank improvement,,Riparian planting, ,Management of paths,Public green area,Participation in monitoring  +
C
Bank improvement,,removal of jetty roosting posts, Brownfield land regeneration, green roofs, SUDS, nesting boxes,,Riverside walkway,,  +
K
Bank modification, Re-profiling, Creation of low flow channel, Habitat restoration, Creation of low flow channel, Barrier removal, Creation of backwaters, Introducing large woody debris, Riverbed restoration,,Floodplain reconnection, Scrapes, Increase water retention area, Wetland habitat,,Channel realignment, Re-meandering, Enhancing flow diversity, Habitat restoration, Meandering channel, Selective removal of organic muds and sludge contaminated with toxic, Create more natural flow regime, Improvement of natural flows, Improving fish migration,,Flow management,,,  +
R
Bank modification,Buffer strips, Tree planting,,Introducing large woody debris, ,,Engagement with a wide range of stakeholders - more planned.,,Survey work  +
Bank reprofiling, Bank stabilisation, Bed reprofiling,,Tree management,,Brushwood berms to increase scour on the gravels, Introducing large woody debris, ,,,  +
U
Bank reprofiling, Bed reprofiling,,Riparian planting,,Introducing large woody debris, Cleaning of spawning gravels,,,,  +
V
Bank reprofiling, Deculverting,, ,,,  +
L
Bank reprofiling, Deculverting,,Creation of backwater ,,,  +
G
Bank reprofiling, Deculverting,Creation of wetland, ,,,  +
H
Bank reprofiling, Deflectors, Installation of coir rolls,, ,,,  +
C
Bank reprofiling, Deflectors,, ,,,  +
E
Bank reprofiling, Diversification of in-channel features,,, Farm infrastructure interventions,,Community involvement,Presentations to instutions, Monitoring and survey projects  +
R
Bank reprofiling, Installation of coir rolls, Deflectors,Tree management,Creation of backwater ,,,  +
S
Bank reprofiling, Installation of coir rolls, Removing of sheet piling,, ,,,  +