Property:Measures values

From RESTORE
Jump to navigation Jump to search

This is a property of type String.

Showing 20 pages using this property.
L
,Within the construction process the river was extended by 7.6 kilometres and the estuary of the Traisen River was relocated, ,,,  +
,conservation and restoration of ponds, ,CTM management guidelines,conservation and restoration of ponds for public awareness,  +
I
,ensuring the hydraulic protection of the area from the risk of flooding and sediment from the canals, as well as from the upstream inputs, ,defining and recognizing a "representative institutional model" of single reference for the coordination of the various actors, by stimulating and activating actions for the management, protection, in the Caorle lagoon system; establishing an operational programme that takes account of all components of the system, through an integrated approach capable of restoring lagoon dynamics, ensuring and consolidating the protection, promotion and development of the wetland area,,creating a network of meters to monitor all the data needed to define and know the current lagoon dynamics, in order to plan and plan the interventions on an extended and integrated knowledge base; consolidating and/or promoting instruments and actions for the protection and enhancement of the territory, as well as for the protection of habitats  +
S
,establishment of woodland,, ,,,  +
I
,establishment of woodland,, ,,,  +
B
,establishment of woodland,, Runoff pathway management,,,  +
3
,floodplain woodland planting,, ,Land management,,Volunteer engagement,,Survey work,  +
R
,herbicide spraying, Removal of invasive plants,, ,aerial sureys,,  +
I
,mowing, adapted to the conservation of species and habitat types; adequate maintenance of borders and green belts (selective logging, preservation of trees, maintaining adequate width of green belts along ditches and watercourses), building of tourist infrastructure, which will provide a targeted visit;,control of drainage of water from secondary arrester to main dams (river) with locks; control of drainage of water from tertiary arrester; coordinated maintenance of ditches; control of the use of fertilizers and preservatives on agricultural land; respect of the prohibition of the meadows plowing from the KPLB Regulation (also for organic farmers); establishing a zoning of individual subregions where priorities are defined in cooperation with land owners and managers of the protected area and NATURA 2000 (KPLB and ZRSVN); payment for the implementation of the adjusted use on agricultural land,awareness of stakeholders on the importance of adequate maintenance of the arrester;,establishment of monitoring of qualifying species and habitat types; prepare an analysis of the development possibilities and the restructuring plan for individual agricultural holdings in cooperation with agricultural institutions and with the financial support of agricultural policy; designing common tourism products; joint marketing of products;  +
,protecting and increasing biodiversity, improving the landscape and the quality of water resources, ,Custody agreements,,Development of environmentally sustainable rice farming, to the increase of soft tourism and to the increase of citizens' awareness of environmental issues.  +
A
15 leaky dams and scrapes.,, ,,,  +
G
1:3 and 1:6 banks, Introduction of spawning gravels, Creation of pools and riffles, creation of buffer zones, Creation of low flow channel, gravel river access point, preservation of historic mill leat,Creation of multi stage channel, Improving fish migration, Lowland meadow, Maintenance of riparian vegetation, Introduction of spring flow, New ultrasonic gauging station,Improvement of channel morphology, Improving fish migration, restoring more sinuous planform Introduction of 2 foot bridges,,Engagement with a wide range of stakeholders, 2 events in the park, Junior river wardens programme, school visits, tours and presentations for local interest groups, social media video, Information boards, mailing list, project website, project mailbox, community satisfaction survey,Ecological survey, Monitoring via Fixed Point Photography, Climate change adaptation, Definition of environmental objectives and indicators and monitoring program., Removal of Stevenson Stones for display  +
E
Abundant sand was being put on the banks, Barrier removal, Blocks were used to diversify the flow,, ,Cutting trees that could be a potential danger, Setting up of a diversion channel,,,  +
P
Acidic water amelioration, Creation of fish passes,,, Fish stocking,,,  +
E
Actions to improve the natural environment: Cleaning of the riverbed and the riverbank; Removal of dead vegetation and cleaning of rubbish.,Actions to improve the natural environment: Restoration of the autochthonous riverside vegetation in the sections in which the reedbed is present. It is responsible for the degradation of the autochthonous vegetation, in an area which should be a riverside forest with species closer to the ecological climax; Removal of ailanthus and other invasive exotic species., ,,Actions of integration in a river area: Construction of a pedestrian path 2 meters wide and 3,080 meters long along the riverside forest of the Bembézar River; Construction of a footbridge over the river and improvement of difficult passageways along the path. Improvement of infrastructures for public use: Cleaning of vegetation of the existing Medieval Bridge in the Bembézar riverbed.,  +
W
Adding Gravel, Berm Creation, tree management,, Public access to river,,,  +