Property:Image gallery image description

From RESTORE
Jump to navigation Jump to search

This is a property of type String.

Showing 9 pages using this property.
C
prior to works  +, facing upstream  +, downstream  +
G
during construction  +, planned development  +
Č
excavation of the new channel  +, excavation site  +, filling up the small "dams" in the deepened channel  +,
B
for comparison with post works  +, fishery and flow measures  +
M
just downstream of the park  +
mill weir on the March Burn before fish pass installation (picture courtesy of P.Atkinson from the Tyne Rivers Trust)  +
B
W
terrace just after constuction  +
A
„ETZ-Skupaj“ - Joint urban and natural development at the Mur banks in Gornja Radgona (SI) and Bad Radkersburg (AT) 2010-2014 - New connection bridge between the border ©Stadtgemeinde Bad Radkersburg  +, „ETZ-Skupaj“ - Joint urban and natural development at the Mur banks in Gornja Radgona (SI) and Bad Radkersburg (AT) 2010-2014 - Urban access to the River Mur, Austria ©freiland  +, „ETZ-Skupaj“ - Joint urban and natural development at the Mur banks in Gornja Radgona (SI) and Bad Radkersburg (AT) 2010-2014 - Urban access to the River Mur, Slovenia ©freiland  +