Property:Image gallery image description

From RESTORE
Jump to navigation Jump to search

This is a property of type String.

Showing 20 pages using this property.
A
The Adour at Izotges (Gers).  +, Restoration of the three hectares of floodplain by moving back embankments, representing an additional storage area for 50,000 m³ of floodwater.  +, The Adour at Jû-Belloc (Gers): watercourse with a mobile bed.  +
R
Restored Island - Nov 2012  +, Restored section - Nov 2012  +
B
Reusel Baarschot-Diessen  +
R
Rinya river_1  +, Rinya river_2  +
Rio Mareta in 2005, before restoration works.  +, Rio Mareta in 2010, after restoration works.  +, Rio Mareta in 2012.  +,
L
Roggia Tergola Poster  +, Risorgiva Tergola  +
P
River Borgie area of conservation action  +
T
Sharpsbridge rock ramp fish easement post construction © Royal HaskoningDHV  +, Sharpsbridge rock ramp under construction © Royal HaskoningDHV  +, River Ouse at Sheffield Park/Spring Meadow post restoration © Royal HaskoningDHV  +,
S
River Rawthey: new fencing of the riparian zone  +, River Rawthey: fencing of the riparian zone  +
R
River Rea Restoration Project Area  +
River Roding prior to the project  +, The created backwater  +, The backwater after the establishment of vegetation, September 2009  +
O
River Test - Bossington Estate (before 1) ©Cain Bio-Engineering Ltd.  +, River Test - Bossington Estate (after 1) ©Cain Bio-Engineering Ltd.  +, River Test - Bossington Estate (before 2) ©Cain Bio-Engineering Ltd.  +,
A
River Widening Weyern - Aerial view 2006 (LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-2007) ©Styrian Government  +
F
River before hatches opened  +, River after hatches opened  +
A
River widening Sicheldorf - Aerial view 2012 (ETZ-Project “DraMurCi” 2009-2013) ©Styrian Government  +, River widening Sicheldorf - Widening 2013 (ETZ-Project “DraMurCi” 2009-2013) ©freiland  +
River widening St. Peter Au - Aerial view 2006 (LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015) ©freiland  +, River widening St. Peter Au - Distributary 2013 (LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015) ©freiland  +
River widening measure Gosdorf I - Aerial View 2008 (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007) © freiland  +, River widening measure Gosdorf I - Entrance distributary 2008 (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007) © freiland  +
River widening measure Gosdorf II - distributary outflow 2013 (ETZ-Project “DraMurCi” 2009-2013) © freiland  +, River widening measure Gosdorf II - distributary 2013 (ETZ-Project “DraMurCi” 2009-2013) © freiland  +
R
The coupeau impoundment.  +, The Coupeau weir  +, The retention area during the 2005 winter. A new river channel is created and vegetation developped.  +,
U
Ullswater CIC hedgerow creation  +, Ullswater CIC riparian restoration before & after  +, Ullswater CIC river restoration post completion & 1yr later  +,