Property:Image gallery image description

From RESTORE
Jump to navigation Jump to search

This is a property of type String.

Showing 20 pages using this property.
K
Meandering new stream (photo. Maria Arola)  +, New stream (photo. Maria Arola)  +, Pool-riffle variation (photo. Outi Laamanen)  +,
R
The map of Rheinfelden bypass. New power plant designed as run-of-river type. Near-nature water course installed in the old headrace channel. (photo: Walter Binder)  +, Fish counter at the end of Rheinfelden bypass (photo: Pinja Kasvio)  +, Hydropowerplant (photo Pinja Kasvio)  +,
L
Scope of action  +, Removal of the Moratalla weir  +, Riparian vegetation plantation in "Los Charcos"  +,
C
Vistula River Natural Stretch. (Katarzyna Suska SSIFI).  +, Stabilizing stone ramp below the dam on the Vistula River. (Katarzyna Suska SSIFI).  +, Reconstructed fishpass chamber. (Pawel Prus SSIFI).  +,
R
Gravel cover applied in the river (Check link below in "additional links and references" for source).  +, Fishpass that was created in the river (Check link below in "additional links and references" for source).  +, Side channels that were connected to the river (Check link below in "additional links and references" for source).  +
C
Flamants roses sur l etang du Fangassier  +, Le rassemblement par equipe a l aube  +, Vue Aérienne Du Site 2009  +
The Vezouze at Lunéville before restoration work. The levee on the left bank prevents flood storage in the flood plain (Rhin-Meuse Water Agency)  +, Flood plain of the Vezouze. Creation of a flood channel on the left bank - work phase – July 2007 (Philippe Russo - Rhin-Meuse Water Agency)  +, Flood plain of the Vezouze. Flood channel on the left bank - 6 months after the work - December 2007 (Philippe Russo - Rhin-Meuse Water Agency)  +,
A
Flooding over BCC and ACPC land  +, freshly created bund and scrapes  +, View downstream to new culvert and watercourse  +,
L
Fontane Marzare  +, Risorgiva  +, Section  +,
F
L
W
From hatches facing upstream, prior to project delivery.  +, From hatches facing upstream, post project delivery.  +
E
Glinščica tributary (on the left) and treatment ditch (on the right) with a new river bed with meanders (Vzdrževanje …, 2009).  +, Meandered stream (Photo: S. Blumauer)  +, Ortophoto of ecoremediation system location (in red) (Photo: Geopedia).  +,
G
Goldrill Beck pre-restoration, seen here running alongside the A592  +, Goldrill Beck post-restoration, meandering across the floodplain  +
R
Goshan after weir removal  +, Prestolee weir removal  +
Gravel bar installed to block old straightened channel, pushing main flow around re-connected meander  +
G
Gravel being added to channel.  +, Newly installed brushwood berm in foreground (Queen Elizabeth Park)  +, Newly dug wetland feature in Queen Elizabeth Park prior to volunteer planting.  +
W
Gravelled access ramp  +, One of the brushwood berm structures  +
V
Guadiana river  +, Project area  +, Restoration of 1500 m of a tributary of the Guadiana river to protect saramugo (Anaecypris hispanica)  +
R
Le ruisseau de Trémeret avant les travaux, en septembre 2011 (Source: N.Hamel, Onema).  +, Rehaussement du lit du cours d’eau : positionnement de l’armature avec des blocs de granit à l’aide d’une mini-pelle, en septembre 2011 (Source: N.Hamel, Onema).  +, Habillage des pierres par du granulat fin, chargé depuis un camion benne équipé d’un bras articulé, en septembre 2011 (Source: N.Hamel, Onema).  +,