Property:Image gallery image description

From RESTORE
Jump to navigation Jump to search

This is a property of type String.

Showing 20 pages using this property.
S
Creation of new meanders  +, Riparian and aquatic vegetation in a restored reach  +
C
L’un des étangs de Contes (Source: FDAAPPMA 62).  +, Création du nouveau lit mineur du Fliez en juin 2014 (Source: FDAAPPMA 62).  +, Le nouveau lit du Fliez quatre mois après les travaux en septembre 2014 (Source: FDAAPPMA 62).  +,
L
Culvert outlet pre-works was causing a major obstruction to fish passage (Rivers Agency)  +, Culvert apron pre-works (Rivers Agency)  +, construction of new cascade pool sequence (Rivers Agency)  +,
S
Old river crossing - with fish passes that do not work!  +, Digging out old culverts  +, Culverts arrive  +,
R
Installation of flexible structure  +, Faggot bundles  +, D structure  +,
P
Map of instream restoration sites - Aboyne & Banchory  +, Map of conservation action - upper catchment  +, PiP project officer checking out tree enclosures at River Dee  +,
R
Shipley weir in Winter  +, Dam removal  +, Digger work  +,
D
Day Brook before  +, Day Brook construction  +
Day Brook rain garden  +, Summer 2013  +, Sign: Your brook starts here  +,
H
De beek bij Staverden  +, De monding van de Hierdense Beek ter plaatse van het randmeer  +, Hierdense Beek vanaf de brug bij de monding  +,
R
Glen's Weir (EA report, 2011)  +, Deflector (EA report, 2011)  +, Weir (EA report, 2011)  +
D
Djupsund stream after deculvering. Picture: Miguel A. Segarra Valls  +, New pipe under way that crosses Djupsund stream. Picture by Miguel A. Segarra Valls  +, Sea tout at the opening of the old culvert in Djupsund stream (before restauration).Picture by Miguel A. Segarra Valls  +,
R
E
Mise en place d’un chenal de dérivation pendant les travaux (Source: Alain Bonnet - Onema).  +, Le seuil de Chelles Basse avant les travaux d’effacement (Source: Alain Bonnet - Onema).  +, Début de végétalisation dans l’ancienne retenue, trois mois après les travaux (Source: Alain Bonnet - Onema).  +,
B
Eroded sections appeared in the banks following the collapse of metal sheet piles along the Moselle River. August 2008. (Patrick Adolph – VNF).  +, Installation of geotextiles and planting of helophytes on the banks of the Moselle River. Fall 2011. Patrick Adolph – VNF).  +, Signs of beaver activity and passage on the banks. Fall 2012. (Patrick Adolph – VNF).  +,
L
Map of the restoration area  +, Reeds on the bank of the Llobregat River  +, Disposal of dead wooden logs and bird sanctuaries  +,
S
New deep flow gutters needed on traditional buildings to take water to new clean water drain  +, New gutters to take roof water out to water course  +, New cross drain to be installed to prevent rainwater running into dirty yard.  +,
P
Ditch blocking on the River Oykel (A2168792)  +, Ditch blocking on the River Oykel (A2206481)  +
R
River Alt prior to works  +, Vegetated channel threads  +, Diverse vegetation structure  +,