Property:Image gallery image description

From RESTORE
Jump to navigation Jump to search

This is a property of type String.

Showing 20 pages using this property.
B
View downstream before work started  +, View upstream before work started  +, Tree work in progress, January 2016  +,
S
K
Completed works  +, Pre-works – canelised river with former meanders visible in floodplain  +, Completed works with LWD  +,
W
Works being undertaken.  +, Completed works in low and high flow events.  +
S
Meandering of the new stream (photo. Maria Arola)  +, Constructed new stream (stones and gravel added) (photo. Maria Arola)  +, Confluence of old stream and new strem (photo. Maria Arola)  +
R
Old Girardon dike along the Rhône where flood debris accumulated, before the dike was opened. September 2011 (Compagnie nationale du Rhône).  +, Connection of flood storage zones in Cornas, during flooding. December 2012 (Juan Robert).  +, Opening of the Girardon dike at Cornas. October 2011 (Juan Robert).  +,
S
Upstream part of the project where Himalayan Balsam will need to be managed - © Nick Elbourne (RRC), October 2013  +, Re-instated meander, looking downstream - © Nick Elbourne (RRC), October 2013  +, Constructed river crossing (Ford) - © Nick Elbourne (RRC), October 2013  +,
W
Dredge sediment recharging in November 2005  +, Dredge sediment recharging in November May 2006  +, Construction of Breach 4 (8,000m3 of m was moved during a 7h tidal window)(Taken for Defra, July 2006)  +
E
Pansport Bridge aerial photograph - September 2014 © Royal HaskoningDHV  +, Construction of Pansport Bridge © Royal HaskoningDHV  +, Necessary bank protection works © Royal HaskoningDHV  +,
R
Construction of the fishway  +
S
Damming device on the channel constructed in the 1920s Source: Waldemar Mioduszewski and Tomasz Okruszko. GWP Poland.  +, Water reservoir with small power plant Source: Waldemar Mioduszewski and Tomasz Okruszko. GWP Poland.  +, Stone threshold – small retention in forests Source: Waldemar Mioduszewski and Tomasz Okruszko. GWP Poland.  +,
R
River of Life pre-works (River Restoration Centre)  +, River of Life plan view map (the Earth Trust)  +, Phase 1 works taking place (the Environment Agency)  +,
E
Vue aval du seuil de Carayon, avant effacement, ponctué par plusieurs brèches sur le déversoir. Juillet 2011 (Source: Yannick Ramadier – Onema).  +, Vue aval du seuil de Carayon au tout début des travaux de restauration. Juillet 2011 (Source: Yannick Ramadier – Onema).  +, Les piles du pont en aval du seuil ont été dégagées afin de faciliter le passage des crues. Septembre 2011 (Source: Yannick Ramadier – Onema).  +,
M
Copyright Ian Watson Coal Authority  +
Q
Cornmill Gardens, facing upstream  +, Ladywell Fields, created backwater, August 2008  +
E
Eden Catchment - ecological status  +, River Eden white-clawed crayfish Copyright LindaPitkin/2020Vision  +, River Lyvennet fencing and tree plantinig  +,
L
Ladywell Fields fully restored, August 2008  +, Created backwater, August 2008  +, Created pond, August 2008  +
R
The restored river, complete with berms. April 2012  +, Use of willow to create berm. April 2012  +, Group of Thames21 volunteers in action. April 2012  +,
D
Example of an existing weir upstream of works, August 2011  +, One of the sites of weir removal, August 2011  +, Introduced woody debris and establishment of vegetation within 12 months, August 2011  +,
H
Volunteers planting the swale  +, Creating the swales  +, Misconnection into stream  +,