Meandering of the new stream (photo. Maria Arola) +, Constructed new stream (stones and gravel added) (photo. Maria Arola) +, Confluence of old stream and new strem (photo. Maria Arola) +
Old Girardon dike along the Rhône where flood debris accumulated, before the dike was opened. September 2011 (Compagnie nationale du Rhône). +, Connection of flood storage zones in Cornas, during flooding. December 2012 (Juan Robert). +, Opening of the Girardon dike at Cornas. October 2011 (Juan Robert). +, …
Dredge sediment recharging in November 2005 +, Dredge sediment recharging in November May 2006 +, Construction of Breach 4 (8,000m3 of m was moved during a 7h tidal window)(Taken for Defra, July 2006) +
Damming device on the channel constructed in the 1920s Source: Waldemar Mioduszewski and Tomasz Okruszko. GWP Poland. +, Water reservoir with small power plant Source: Waldemar Mioduszewski and Tomasz Okruszko. GWP Poland. +, Stone threshold – small retention in forests Source: Waldemar Mioduszewski and Tomasz Okruszko. GWP Poland. +, …
River of Life pre-works (River Restoration Centre) +, River of Life plan view map (the Earth Trust) +, Phase 1 works taking place (the Environment Agency) +, …
Vue aval du seuil de Carayon, avant effacement, ponctué par plusieurs brèches sur le déversoir. Juillet 2011 (Source: Yannick Ramadier – Onema). +, Vue aval du seuil de Carayon au tout début des travaux de restauration. Juillet 2011 (Source: Yannick Ramadier – Onema). +, Les piles du pont en aval du seuil ont été dégagées afin de faciliter le passage des crues. Septembre 2011 (Source: Yannick Ramadier – Onema). +, …
Eden Catchment - ecological status +, River Eden white-clawed crayfish Copyright LindaPitkin/2020Vision +, River Lyvennet fencing and tree plantinig +, …
The restored river, complete with berms. April 2012 +, Use of willow to create berm. April 2012 +, Group of Thames21 volunteers in action. April 2012 +, …
Example of an existing weir upstream of works, August 2011 +, One of the sites of weir removal, August 2011 +, Introduced woody debris and establishment of vegetation within 12 months, August 2011 +, …