File list
Jump to navigation
Jump to search
This special page shows all uploaded files.
| Date | Name | Thumbnail | Size | User | Description | Versions |
|---|---|---|---|---|---|---|
| 13:15, 8 February 2024 | Easton 2.png (file) | 666 KB | Dhutchinson | 1 | ||
| 13:13, 8 February 2024 | Easton.png (file) | 731 KB | Dhutchinson | Post Restoration | 1 | |
| 12:39, 8 February 2024 | Stainby Road Colsterworth - Restoration Project - Case Study.pdf (file) | 392 KB | Dhutchinson | Project case study. | 1 | |
| 11:33, 8 February 2024 | Pic1.jpg (file) | 1.75 MB | Dhutchinson | Pre project habitat photo. | 1 | |
| 11:24, 8 February 2024 | Col 4.jpg (file) | 1.48 MB | Dhutchinson | New Ground Water Fed Wetland. | 2 | |
| 11:23, 8 February 2024 | Col 3.jpg (file) | 379 KB | Dhutchinson | New channel for post construction | 1 | |
| 11:23, 8 February 2024 | Col 2.jpg (file) | 328 KB | Dhutchinson | Site post construction October 23 | 1 | |
| 11:22, 8 February 2024 | Col 1.jpg (file) | 756 KB | Dhutchinson | New installed Lincs Limestone Gravel Feature | 1 | |
| 11:14, 8 February 2024 | Colsterworth October 2023.JPG (file) | 6.08 MB | Dhutchinson | Project Site just after construction October 2023 | 2 | |
| 14:23, 6 February 2024 | Before and after collage.png (file) | 8.9 MB | TylerThames21 | 1 | ||
| 14:22, 6 February 2024 | River Rom Wetlands As-built 11.10 (13).jpeg (file) | 355 KB | TylerThames21 | Wetlands during construction | 1 | |
| 14:19, 6 February 2024 | Rom wetland1 sep2023.png (file) | 20.84 MB | TylerThames21 | View of Wetland number 1 | 1 | |
| 11:27, 5 February 2024 | RRC main.pdf (file) | 9.82 MB | Eardles | 1 | ||
| 16:48, 2 February 2024 | Photo from Ben Eardley(2).jpg (file) | 144 KB | Eardles | 1 | ||
| 16:47, 2 February 2024 | PW UAV Change2020 2023a.jpg (file) | 1.85 MB | Eardles | 1 | ||
| 16:44, 2 February 2024 | P7292322 Web.jpg (file) | 3.06 MB | Eardles | 1 | ||
| 16:42, 2 February 2024 | DJI 0285.JPG (file) | 23.83 MB | Eardles | 1 | ||
| 16:11, 2 February 2024 | DJI 0294.JPG (file) | 17.79 MB | Eardles | River Aller - Selworty Farm Stage 0 scheme | 1 | |
| 11:48, 2 February 2024 | Greatham.png (file) | 185 KB | Ascarr | 1 | ||
| 14:26, 17 January 2024 | 20210805140055 IMG 0596.JPG (file) | 915 KB | AliceJames | Kirkstone Beck pre-restoration, a snarrow, single thread channel with revetments, embankments and little diversity | 1 | |
| 16:48, 16 January 2024 | DJI 0548 reduced.jpg (file) | 894 KB | AliceJames | Goldrill Beck post-restoration, meandering across the floodplain | 1 | |
| 16:45, 16 January 2024 | DJI 0360.jpg (file) | 1.45 MB | AliceJames | Goldrill Beck pre-restoration, seen here running alongside the A592. | 1 | |
| 09:51, 15 January 2024 | Failing flood bank.jpg (file) | 9.61 MB | Ullswater CIC | 2 | ||
| 09:13, 15 January 2024 | Pre works failing upstream.jpg (file) | 5.81 MB | Ullswater CIC | 1 | ||
| 14:30, 4 December 2023 | Valley-Brook-case-study.png (file) | 290 KB | Ascarr | 1 | ||
| 14:17, 4 December 2023 | 192d5c39-31ed-4f68-9438-f13041e7a651.png (file) | 2.57 MB | Ascarr | 1 | ||
| 12:13, 26 June 2023 | Grange-farm-stage-zero-620x465.jpg (file) | 65 KB | Ascarr | 1 | ||
| 11:50, 25 May 2023 | Strenghtening the channel barrier.jpg (file) | 1.67 MB | AnaStržen | In total, we had to build three new barriers between the channel and the double meander to ensure the integrity of the new riverbed. | 1 | |
| 11:29, 25 May 2023 | Finishing touches.jpg (file) | 2.31 MB | AnaStržen | The final part of the lower part of the channel is being filled in - this was the trickiest part, since it was very muddy. | 1 | |
| 08:06, 25 May 2023 | First layer of soil is in.jpg (file) | 1.57 MB | AnaStržen | Soil was being brought to the channel by a tractor with a dump trailer. | 1 | |
| 07:54, 25 May 2023 | Channel-filling2.jpg (file) | 2.44 MB | AnaStržen | Progress in filling in the now-dry straight channel. | 1 | |
| 12:37, 24 May 2023 | Process of filling in the straight channel.jpg (file) | 804 KB | AnaStržen | The straight channel was being filled in from both sides with excavators. | 1 | |
| 12:25, 24 May 2023 | Water draining.jpg (file) | 2.24 MB | AnaStržen | Before we could start filling in the straight channel, we had to rescue any fish and crustaceans and pump out as much water as possible, so the soil wouldn't turn to mud. | 1 | |
| 12:08, 24 May 2023 | Filled-in-channel.jpg (file) | 889 KB | AnaStržen | Part of the channel is finally filled up with soil. | 1 | |
| 11:17, 24 May 2023 | Channel filling.jpg (file) | 1.97 MB | AnaStržen | After rescuing as much fish and crustaceans as possible, the construction crew started filling in the channel with soil they had dug out two years back. | 1 | |
| 11:11, 24 May 2023 | Filling-in of the-channel.jpg (file) | 1.97 MB | AnaStržen | After rescuing as much fish and crustaceans as possible, the construction crew started filling in the channel with soil they had dug out two years back. | 1 | |
| 13:25, 17 May 2023 | Channel crossing.jpg (file) | 8.14 MB | AnaStržen | Making a new access road over the straight channel. | 1 | |
| 07:54, 17 May 2023 | 2020 Flooded road.jpg (file) | 3.17 MB | AnaStržen | In 2020, unfortunately the works could not continue due to high water levels. | 1 | |
| 07:49, 17 May 2023 | Flooded road in 2020.jpg (file) | 3.17 MB | AnaStržen | In 2020, works could not continue, due to high water levels - the lake did not fully disappear over summer. | 1 | |
| 06:41, 17 May 2023 | Finished road.jpg (file) | 719 KB | AnaStržen | Due to the wet terrain we had to strenghten the access road with gravel. | 1 | |
| 12:22, 15 May 2023 | Access road preparation.jpg (file) | 3.35 MB | AnaStržen | Preparation of access road to the construction area. | 1 | |
| 13:02, 18 April 2023 | Digging mechanisation.jpg (file) | 2.38 MB | AnaStržen | 1 | ||
| 13:00, 18 April 2023 | Truck arrival.jpg (file) | 2.35 MB | AnaStržen | Arrival of mechanisation at the entry to the lake area | 1 | |
| 08:47, 3 April 2023 | University DJI 0230.JPG (file) | 4.87 MB | Nick Mott | 1 | ||
| 21:11, 2 April 2023 | Victoria Ground EDR-21 completed naturalised channel EDR-21.jpg (file) | 6.2 MB | Nick Mott | 1 | ||
| 20:52, 2 April 2023 | University DJI 0231.JPG (file) | 4.89 MB | Nick Mott | Completed scheme September 2020 | 1 | |
| 20:38, 2 April 2023 | University DJI 0212.JPG (file) | 5.03 MB | Nick Mott | Completed riparian zone restoration, Sept'20 | 1 | |
| 09:39, 23 March 2023 | 20230314 155013.jpg (file) | 6.18 MB | TristanHe | Afon Merin, March 2023 after restoration. High flow conditions. | 1 | |
| 09:38, 23 March 2023 | 20230314 155011.jpg (file) | 5.85 MB | TristanHe | Afon Merin after restoration, March 2023 during high flows | 1 | |
| 09:23, 23 March 2023 | 20230314 155006.jpg (file) | 5.72 MB | TristanHe | Afon Merin after restoration, March 2023 during high flows | 1 |