All public logs
Jump to navigation
Jump to search
Combined display of all available logs of RESTORE. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
- 09:52, 16 July 2013 NickRRC talk contribs uploaded File:Before dualis.jpg (Dulais before restoration (2003))
- 09:46, 16 July 2013 NickRRC talk contribs uploaded File:Rootward excavator.jpg (Root wad being installed in the bank)
- 17:03, 15 July 2013 NickRRC talk contribs uploaded File:P5130064.JPG (Chapelton Dam flood storage area (2013))
- 17:02, 15 July 2013 NickRRC talk contribs uploaded File:P5130062.JPG (Chapelton Dam (2013))
- 16:59, 15 July 2013 NickRRC talk contribs uploaded File:P5130109.JPG (Woody debris and sediment is effectively being stored in the new floodplain area (2013))
- 16:57, 15 July 2013 NickRRC talk contribs uploaded File:P5130108.JPG (The Burn management works )
- 16:56, 15 July 2013 NickRRC talk contribs uploaded File:P5130077.JPG (Chapelton Dam control structure )
- 16:41, 15 July 2013 NickRRC talk contribs uploaded File:P5130092.JPG (Burn of Mosset- sustainable sediment and flood management by reconnecting the river with its floodplain and working with natural processes)
- 16:25, 8 July 2013 NickRRC talk contribs uploaded File:Restored bed levels and bank profile.JPG (Restored bed levels and bank profile - November 2012 © Natural Resources Wales)
- 16:22, 8 July 2013 NickRRC talk contribs uploaded File:Restored Island 1.JPG (Restored Island - November 2012 © Natural Resources Wales)
- 15:45, 8 July 2013 NickRRC talk contribs uploaded File:Restored bed levels and bank profile 2.JPG (Restored bed levels and bank profile - November 2012 ©Natural Resources Wales)
- 14:24, 8 July 2013 NickRRC talk contribs uploaded File:Upstream reference reach.JPG (Natural cascade and pool on the Valency, upstream of Boscastle. © Halcrow)
- 14:23, 8 July 2013 NickRRC talk contribs deleted page File:Valency ReferenceReach.jpeg (Deleted old revision 20130708142237!Valency_ReferenceReach.jpeg: Duplicated file)
- 14:22, 8 July 2013 NickRRC talk contribs uploaded a new version of File:Valency ReferenceReach.jpeg (Natural cascade and pool on the Valency, upstream of Boscastle. © Halcrow)
- 14:19, 8 July 2013 NickRRC talk contribs uploaded File:Photo with beaches.jpg (Gravel beaches have subsequently formed within the bedrock channel - 2008 ©RRC)
- 14:17, 8 July 2013 NickRRC talk contribs uploaded File:2005-01-01 00.00.00-1.jpg (Breaking out bedrock. © Halcrow)
- 14:14, 8 July 2013 NickRRC talk contribs uploaded File:2006-02-21 11.15.10.jpg (Valency through Boscastle prior to works being carried out. © Halcrow)
- 14:11, 8 July 2013 NickRRC talk contribs uploaded File:P1010016.JPG (The natural fracture lines within the bedrock were used when deepening the channel to ensure its stability. The retaining flood walls have become vegetated. © Halcrow)
- 14:07, 8 July 2013 NickRRC talk contribs uploaded File:P1010022.JPG (The low flow course had to be entirely excavated to best mimic millennia of erosion of a hard bed rock. © Halcrow)
- 14:06, 8 July 2013 NickRRC talk contribs uploaded File:Valency ReferenceReach.jpeg (Natural cascade and pool on Valency, upstream of Boscastle. © Halcrow)
- 12:11, 8 July 2013 NickRRC talk contribs uploaded File:Babingley Sept2007post.JPG (Seven months post restoration works.The channel is narrower and shallower with diverse marginal vegetation and good spawning habitat - September 2007 ©Environment Agency)
- 12:09, 8 July 2013 NickRRC talk contribs uploaded File:Babingley Feb2007trout.JPG (Brown trout (Salmo trutta) present in the river one year after works were completed - February 2007 ©Environment Agency)
- 12:08, 8 July 2013 NickRRC talk contribs uploaded File:Babingley Aug2007Deflectors.JPG (One pair of deflector boards, installed at an offset angle, after six months. Marginal vegetation has rapidly colonised the silt helping to stabilise it further – August 2007 ©Environment Agency)
- 12:08, 8 July 2013 NickRRC talk contribs uploaded File:Babingley Feb2007Deflectors.JPG (The newly installed deflectors face upstream and concentrate flow. Deposited silt has formed new banks and has since been colonised by vegetation - February 2007 ©Environment Agency)
- 12:07, 8 July 2013 NickRRC talk contribs uploaded File:Babingley Aug2007Rockrolls.JPG (Pool and traverse fish pass at existing weir after completion. Vegetation has already begun to establish on the rock rolls - August 2007 ©Environment Agency)
- 12:06, 8 July 2013 NickRRC talk contribs uploaded File:Babingley August2007culvert.JPG (Downstream extent of the reach where the river enters a 0.6m wide culvert. The sluice boards have been completely removed lowering the water levels upstream– August 2007 ©Environment Agency)
- 12:04, 8 July 2013 NickRRC talk contribs uploaded File:Babingley Aug2006pre.JPG (Babingley River and impounded Broadwater prior to restoration. ©Environment Agency)
- 11:15, 8 July 2013 NickRRC talk contribs uploaded File:P9040007.JPG (Babingley River at Hillington following restoration works - September 2007 ©Environment Agency)
- 10:36, 8 July 2013 NickRRC talk contribs uploaded File:100 1042.jpg (Wetland area at high flows. The height of the floodwall (to the left) demonstrates the flood storage capacity within the park - March 2010. ©AECOM)
- 10:34, 8 July 2013 NickRRC talk contribs uploaded File:LoRres89.JPG (Creation of a wetland area at the downstream extent of the works - May 2011 ©AECOM)
- 10:30, 8 July 2013 NickRRC talk contribs uploaded File:May 2011 Main channel.JPG (May 2011 - The restored channel of the Braid Burn through Inch Park after two years. Marginal vegetation has established well and natural processes have enhanced the in-channel morphological features that were created. ©AECOM)
- 10:29, 8 July 2013 NickRRC talk contribs uploaded File:Feb 2009 Complete.JPG (Feb 2009 - During works. The new channel on completion. The gently sloped banks provide additional capacity and promote the natural processes of sediment transport and vegetation colonisation. This allows the burn to develop a more natural character with)
- 10:26, 8 July 2013 NickRRC talk contribs uploaded File:Jan 2009 Opening meanders.JPG (January 2009 - During works. New meander channel cut off-line and connected to the existing channel in stages once complete. The downstream end of each meander was opened up first and allowed to fill with water. Each meander was left for a period to allow)
- 10:21, 8 July 2013 NickRRC talk contribs uploaded File:April 2006 Pre works.JPG (Braid Burn as it flows through Inch Park before works were undertaken. April 2006. ©AECOM)
- 14:34, 4 July 2013 NickRRC talk contribs uploaded File:Hawley July 2007c.jpg (The restored reach of the River Darent at Hawley Manor after two years ©Alconbury Environmental)
- 14:33, 4 July 2013 NickRRC talk contribs deleted page File:Hawley July 2007c.jpg (Duplicated file)
- 14:31, 4 July 2013 NickRRC talk contribs uploaded File:Hawley July 2007c.jpg (In-channel and marginal vegetation have established well. ©Alconbury Environmental)
- 14:29, 4 July 2013 NickRRC talk contribs uploaded File:Darent 5 09 (3).jpg (In-channel vegetation establishing well post works. ©Alconbury Environmental)
- 14:27, 4 July 2013 NickRRC talk contribs uploaded File:Hm 5 BF.jpg (The over widened River Darent prior to works starting. ©Alconbury Environmental)
- 14:25, 4 July 2013 NickRRC talk contribs uploaded File:HM2010 PPA.JPG (The channel five years on. The planted berms have established well and variation in flow is evident. ©Alconbury Environmental)
- 14:19, 4 July 2013 NickRRC talk contribs uploaded File:HMAfter 2005.jpg (Immediately after works. The newly planted berms and narrower and more sinuous channel are all visible. ©Alconbury Environmental)
- 14:17, 4 July 2013 NickRRC talk contribs deleted page File:HM2005 After.jpg (Duplicated file)
- 14:15, 4 July 2013 NickRRC talk contribs deleted page File:HM2005 After.jpg (Deleted old revision 20130704141441!HM2005_After.jpg: Duplicated file)
- 14:14, 4 July 2013 NickRRC talk contribs uploaded a new version of File:HM2005 After.jpg (Immediately after works. The newly planted berms and narrower and more sinuous channel are all visible. ©Alconbury Environmental)
- 14:13, 4 July 2013 NickRRC talk contribs undeleted page File:HM2005 After.jpg (1 revision and 1 file restored)
- 14:00, 4 July 2013 NickRRC talk contribs deleted page File:HM2005 After.jpg (Duplicated file)
- 13:58, 4 July 2013 NickRRC talk contribs uploaded File:HM2005 After.jpg (Immediately after completion of works. The newly planted berms are evident and the channel is visibly narrower and more sinuous.)
- 13:56, 4 July 2013 NickRRC talk contribs uploaded File:HM 3d.jpg (Excavator carrying out in-channel works © Alconbury Environmental)
- 17:14, 3 July 2013 NickRRC talk contribs uploaded File:HM2005 During.jpg (During works. Long reach excavator can be seen in the background and newly created berms are visible in the foreground. ©Alconbury Environmental)
- 17:12, 3 July 2013 NickRRC talk contribs uploaded File:HM2005 Before.JPG (Darent at Hawley Manor before works (2005) ©Alconbury Environmental)