Property:Management interventions
Jump to navigation
Jump to search
This is a property of type String.
R
U
T
H
Soil managment and land use to improve infiltration and water quality +
T
L
Supporting local fisheries through marketing initiatives +
A
The banks are maintained if necessary by vegetal engineering +
R
The banks are not not stabilized in order to let the stream create its preferential flow channel and facilitate overflows in the meadow with each rising water +
D
Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas +
The level of the water bodies is lowered during two months in summer and are completely drained every three to five years. +
S
The project enhanced 300m2 of riffle gravel salmonid spawning habitat at 9 sites.The project also carried out an additional 100m2 of gravel cleaning. +
E
B
Town hall workers +
R
Tree management works and re-opening of choked side channels is planned as part of 'Knowsley 2020' project. The site would have benefited from a long term tailored management plan. +
L
LakeAdmin - Chadwick lakes - Plan to improve the surface water quality and reservoir restoration in the Chadwick lakes area +
Vegetation management plan; +
M
Walkover surveys and water sample data collection +
S
Walkover surveys and water sample data collection +
I
R
Watersupply for Natura 2000 habitats +
V
Weed clearance +
P
Woodland management +