Property:Image gallery image description

From RESTORE
Jump to navigation Jump to search

This is a property of type String.

Showing 20 pages using this property.
R
Before and after restoration  +
Before restoration  +, Information board  +
S
Before the project commenced  +, Post project during wet weather  +, Post project, during dry weather  +
M
Before works  +, Poaching  +
R
Before works  +, The weir crest following debris removal  +, Larger boulders forming the channel bank toe  +
B
Before works - April 2006  +, Opening new meanders - Jan 2009  +, Completed channel - Feb 2009  +,
R
Newly created filled berms – August 2012 ©Environment Agency  +, Vegetated berm and woody debris creating sinuosity and flow diversity – August 2013 ©RRC  +, Before works, over wide and over deep – March 2012 ©Environment Agency  +,
U
Colsterworth just after restoration.  +, Belton floodplain inundating Winter 2023  +, Wyndham Park Project 2019  +,
M
Jubilee planting event, March 2012 © LBBD  +, Safer Parks Silver Award 2012 © LBBD  +, Visualising the project at a public consultation event, 2009 © LBBD  +,
R
Benta stream_1  +, Benta stram_2  +
T
Twineham Tilting Gate Pre-Removal  +, Twineham Tilting Gate Immediate Post Removal  +, Twineham Tilting Gate 12 months on  +,
D
Site before works, Summer 2020. Very shaded and with a silt dominated, over widened  +, Berm creation using hinged trees, Autumn 2020.  +, Deep Scour pool between narrowing berms Winter 2022.  +,
M
Fish pass construction (image courtesy of A.Girdler at A.G.A Group)  +, Bioengineering techniques used (image courtesy of A.Girdler at A.G.A Group)  +, Fish pass (image courtesy of A.Girdler at A.G.A Group)  +
R
Bioengineering works  +, During and after works  +, The tepice stream after restoration  +
S
Brick application system into the river mud  +, Once into the river, bacteria released from the brick will start their bioremediation action  +, Bioremediation bricks where bacterial inocula is retained since its disposal into the river  +
H
Blockage removed from Ebbw River  +, Mill road fish pass ramp  +, Litter and waste removed from Nant yr Aber  +,
L
Examples of intervention on the Lagonnet river.  +, Blocks put in place on the Lagonnet river bed.  +
R
Jankowa (km 61+160 Biala River)  +, Bobowa (km 58+700 Biala River)  +, Grybów (km 72+050 Biala River)  +
E
Bolting the Pass Together Prior to Installation  +