Property:Measures values

From RESTORE
Jump to navigation Jump to search

This is a property of type String.

Showing 20 pages using this property.
R
L
Weir removal,,, ,,,  +
R
Weir removal,,, ,,Partnerships,,  +
Weir removal,,, ,Rescue fishing campaign, temporary diversion of river,,  +
F
Weir removal,,, Improvement of local paths and river banks,,,  +
R
Weir removal,,Removal of poplars in old meanders,Re-meandering ,,Agreement with the owners,Public meeting,River contract  +
B
Weir removal,Removal of exotic plants,, ,Management for increase species like Lepus europaeus, Capreolus capreolus, Columba palumbus andAguila chrysaetos,Surveillance patrols managed fire risk and hunting,Interpretive centre was set up  +
M
Weir removal/modification for easement of fish passage, Cattle drinkers,,Protect/restore riparian zone, Removal of exotic plants, Replacement of conifers with deciduous woodland,, Best practice for river habitat restoration,,Community Education,,  +
S
Weir removal/modification for easement of fish passage, Bed raising, Creation of berms, Embankment lowering,,Fencing, Tree planting,,Re-meandering, Channel narrowing, Introducing large woody debris, Adding sinuosity, Enhancing flow diversity, Re-instatement of old course, ,,,  +
R
Weir removal/modification for easement of fish passage, Bank reprofiling,,, ,,,  +
B
Weir removal/modification for easement of fish passage,,, ,,,  +
N
Weir removal/modification for easement of fish passage,,, ,,,  +
G
Weir removal/modification for easement of fish passage,,, ,,,  +
P
Willow spiling, Bank reprofiling,,Tree planting, Livestock fencing,, ,,Engagement with a wide range of stakeholders, Volunteer engagement,,  +
R
adding roughness,,,Re-meandering, Reconnection of cutoff meander, ,,,  +
G
banks strengthening with geotextile and villow plantening,gabions constructions close to the bridge,Meandering channel two new bridges were constructed over a brook,,sport facilities, educational path along the stream, barbeque places, rent of sporting stuff and accessuaries,  +
L
brushwood mattress installation, Hinged Trees, Log Flow Deflectors and Vanes.,, ,Improved stock fencing and ford refurbishment.,,  +
Č
construction of nearly completly new streambeds and directing water freely to the alluvial meadows,Creation of pond,Channel naturalisation, Recovering natural landscapes,,Management of vegetation, More natural water retention, Monitoring strategy,,,popularization of the project,  +