Property:Measures values
Jump to navigation
Jump to search
This is a property of type String.
U
Removal of fish barriers, Livestock fencing, Habitat restoration,, ,,, +
W
Removal of fish barriers,,, ,,, +
R
Removal of hydrological structures, Draining of the brooks, Reconstitution of the alluvial mattress, Scattering of blocks, Creation of three fording and two water troughs, Riparian planting,,,Meanders are conserved favouring sinousity, Laying of 2,600 m of electric fences,Occasionally, adjustments are made to keep a flooding of the wet micro-wetlands which had developed upstream of the works;,, +
A
Removal of in stream boulders and replacement with wood structures, Additional strategic wood structures introduced, Graded extracted gravel to be used for sediment reintroduction, Embankment lowering,Removal of 3 culvert pipes. Infilling of a large drainage ditch., Site fenced to enable natural regeneration to take place. Supplementary planting planned for Spring 2013. Long term site monitoring programmed planned.,,,Demonstration site for natural flood management techniques +
F
Removal of invasive plants, Gravel traps, Bank improvement, Cut back of trees,,, ,Litter picking,, +
Removal of invasive plants, Riverbank revegetation,Riparian planting, Habitat creation,, ,,Awareness raising,, +
R
Removal of invasive species,,, ,,Citizen participation in the restoration project, Improved public access,,Community engagement, +
Removal of invasive species,,, ,,Engagement with schools,,Information board erected, +
S
Removal of invasive species,Depth variation, Livestock fencing,,Adding sinuosity, ,More sensitive channel maintenance,Awareness raising, +
R
Reactivating river dynamics in the Vieux-Rhône River (non-navigable section) at Cornas, Roubion and Petite Île +
Removal of lateral dikes, Reactivating river margins,, ,,, +
B
Removal of metal sheet piles, Installation of geotextile,Planting of helophytes at the foot of banks,, ,,, +
Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras +
Removal of metal sheet piles, installation of bio-engeneering bank protection, Helophytes planted, Installation of geotextile, Gabion bed,,Planting of helophytes at the foot of banks, Seeding of work areas with a mix of herbaceous plant, restoration of wooded areas by planting white willows, Elimination of the invasive species found on site, Creation of pond,, ,,, +
T
Removal of northern overbank,Reconnection of the alluvial forest to the active floodplain,Creation of braided channel ,,, +
C
Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes +
Removal of nozzles which provided a connection hydraulics and fish farming directly between Fliez and ponds, Creation of a bypass, Riverbed restoration, Bank modification,,,Adding sinuosity, ,,An educational trail is set up to improve access to the site and facilitate leisure activities, +
R
Removal of obstructions to flow,,Creation of fish passes, ,,, +
H
Removal of reed, Removal of small bars, Weir removal,,Riparian planting, Removal of fallen trees,Ensuring biodiversity,, +
2
Removal of revetments,,Tree planting, Lowering of embankments,,Re-profiled ditch ,,Community involvement, Engagement with schools,,Raised interest in future projects +
R
Removal of revetments,Depth variation,Planting,Re-profiling,Removal of embankments,Creation of backwater,Creation of pond, Adding sinuosity, ,,,Participation in maintenance,Consultation,Participation in design +
S
Removal of revetments,Depth variation,Revetmens with local species,, ,,Awareness raising,, +
R
Removal of revetments,Introduction of gravel,Planting of native species,Removal of embankments,Creation of wetland,Creation of pond,Adding sinuosity, ,,,Information provision,Consultation +