Property:Measures values

From RESTORE
Jump to navigation Jump to search

This is a property of type String.

Showing 20 pages using this property.
R
Regrading,Removal of invasive species,Cut back of trees,Depth variation, Introducing large woody debris, Introduction of gravel,,Connection to wider floodplain, Creation of wetland,Channel narrowing, Adding sinuosity, ,Management of organic and inorganic sediments,Improved public access,  +
L
Remodeling and extension of the river bank; Remodeling also some sections of the riverbed for the creation of different conditions of the river flow speed and morpho-bathymetric heterogeneity functional to fauna, especially amphibious.,Creation of a riparian arboreous shrubland; Planting of hygrophilous shrub species, and a first band of elophytes (Phragmites australis, Typha latifolia) and a second with shrubby and planar shrubby and arboreal species (Salix spp, Populus spp, Ulmus minor, Quercus robur). , ,Landsteward agreement,,  +
R
Removal of 22 flaps,Introducing sediment,Creation of a flood expansion area, Prohibition of pumping of water,,,  +
E
Removal of a part of the dam up to 1 m, Installation of three mini tresholdsto prevent erosion, realization of a fishery backup and dry work with the installation of a cofferdam to temporarily deflect the flows, Installation of geotextile, Bank protection,,, ,,,  +
I
Removal of artificial wire/stone bed, Replicated upstream boulder bed step/pool sequence,,Removal of non-native species, Large scale planting of native species,,In-channel placement of boulders to provide flow diversity ,,Student Education,,Local support,  +
A
Removal of bank reinforcements,,, ,,,  +
R
Removal of bank reinforcements,,, ,,,  +
E
Removal of bank reinforcements,,Develop riparian forest, Protect/restore riparian zone,,Lengthening of channel, Channel widening, ,,Wildlife improvement,  +
A
Removal of bank reinforcements,,Develop riparian forest,, ,Definition of erodble corridor,,Consultation  +
R
Removal of bank reinforcements,,Restoration of pond, Maintenance of riparian vegetation,, ,Litter picking,,Community Education, Community Events, Community Litter-picking work, Community involvement,,  +
S
Removal of bank reinforcements,Creation of natural floodwater dynamics, ,More sensitive floodplain maintenance,,  +
E
Removal of central slab, valves and spillway, Creation of ramp, Placing of mini-treshold in order to stabilise banks, Tree planting, Planting of grass,, ,,,  +
Q
Removal of concrete banks and bed, Bank reprofiling, Planting, Depth variation, Removal of fencing,Buffer strips, Creation of backwaters, Creation of terraces, New footpaths,Improvement of channel morphology, Creation of meanders ,,,  +
C
Removal of concrete banks and bed, Bank reprofiling,,Buffer strips,,Improvement of channel morphology, ,,,  +
U
Removal of concrete banks and bed, Opening the river about 2 km, Bed raising,,Increase water retention area, Connection to wider floodplain, Wetland habitat,Removal of concrete bank protection, Adding sinuosity, Channel widening, ,,Information for the public, New bicycle path,  +
D
Removal of contaminated material,Restoring function of wetlands,,Landscape improvement of the area of the spill Creating the post of Coordinator to drive the project "Doñana 2005",,,Quantity & dynamics of flow,Continuity of sediment transport,Structure & condition of riparian zones  +
C
Removal of debris,, ,,,  +
Removal of embankment separating Lora stream from Chiese river,Excavation for floodplain creation,, ,,,  +
L
Removal of fish barriers, Fencing,,, ,Supporting local fisheries through marketing initiatives,,  +