Property:Measures values
Jump to navigation
Jump to search
This is a property of type String.
R
Re-grading,Planting, Riffle creation,,Floodplain reconnection, Creation of backwaters, Creation of pond,,Re-instatement of old course, protect old lock from erosion. ,,, +
O
Re-introducing spawning gravel, Bed raising,,, ,Removed 25 drain systems and 7 ditches,, +
D
Re-introducing spawning gravel,,Bigger diameter pipe under way, Deculverting,,,, +
R
Re-introducing stones,Building submerged weir, Creation of fish passes,,, ,,, +
V
Re-introducing stones,Re-introducing gravel, Dam removal, Creation of fish passes, Introducing large woody debris,,Increases the interaction between land and water and the heterogeneity of the substrate; vegetation and shore structure, Vegetation management,,Re-instatement of old course ,,, +
L
Re-profiling, construction of bunds, Creation of revetments, Bank stabilisation, Bank protection,,Creation of backwaters, Creation of wetland, Livestock fencing, Fencing,,Re-meandering The meanders were cleared of sediment, vegetation and organic debris,,,Information board erected, +
R
Re-profiling,Introducing large woody debris, Introduction of gravel,,Connection to wider floodplain,,Channel narrowing,Creation of braided channel ,,, +
Re-working of gravels to create riffles, Creation of pools, Creation of bars,,,Channel narrowing, Adding sinuosity, ,,, +
L
Realignment of flood banks,,River naturalisation, Scrapes, Reconnecting palaeo riverine features, Floodplain reconnection,, ,,, +
R
Recess side slopes,Barrier removal,Removal of exotic plants,Elimination of structural elements concreted,Removal of speckles ,Improve forest management and agricultural,, +
I
Recess side slopes,Barrier removal,Removal of exotic plants, Creation of a flood expansion area, Restoring riparian vegetation,, ,,, +
M
Recovering connectivity longitudinal and transversal, Recovery of channel morphology, Adding sinuosity, Creation of pools and riffles, Bank reprofiling,,Floodplain reconnection, Sustainable urban drainage ponds (SUDs), Excavation for floodplain creation, Habitat restoration, Protect/restore riparian zone, Restoring riparian vegetation,,Improvement of channel morphology, Creation of backwater, Reedbed creation, Re-meandering, ,Fencing, Monitoring strategy,Awareness raising, Improved public access,Public consultation, +
G
Recovering connectivity longitudinal and transversal,Buffer strips,Recovery of dynamic river system, Restoring riparian vegetation,,Remove drains and pipes Elimination of pollutants due to the discharge of toxic sludge,Recovering natural habitats,Recovering natural landscapes,,, +
T
Recovery of channel morphology, Introduction of spawning gravels,,Habitat creation, Habitat enhancement, Riparian habitat restoration, Riparian planting,, ,,, +
E
Recovery of channel morphology,,Protecting and promoting wildlife, Assessment and monitoring program Conditioning of recreational areas,,, +
R
Reduce diffuse pollution,,, ,,Community involvement, +
U
Reduce diffuse pollution,,, UK BAP habitat creation/restoration, Non BAP habitat creation/restoration, Farm infrastructure interventions,,Fencing, Non/agricultural business changed its way of working,,, +
I
Reduction of bank slope, Deflectors,Planting,Creation of fish ladders, Depth variation,,Creation of a lake,,Re-instatement of old course, Adding sinuosity, Creation of meanders, ,Ensuring biodiversity,Landscape,Improved public access,Information provision,Consultation +
R
Reduction of bank slope,Reventment renewal,Creation of fish ladders,Riverbed stabilization, Weir construction,,Riparian planting, Removal of exotic plants,,Channel widening ,Ensuring biodiversity,Recreation,Decreased flood risk, +
V
Regrading, Introduction of spawning gravels,,,Creation of new channel, Adding sinuosity, ,,,Information provision,Consultation,Participation in design,Participation in monitoring +