Property:Image gallery image description

From RESTORE
Jump to navigation Jump to search

This is a property of type String.

Showing 20 pages using this property.
R
Kernansquillec dam and its reservoir in the last century.  +, The Kernansquillec dam in 1996 during the pumping out of mud from the reservoir prior to drainage.  +, Site of the former dam in October 2009: footbridge and successive weirs.  +,
E
Le seuil de Guillen avant intervention. Octobre 2008 (Source: Guy Fournier – Onema)  +, Le seuil de Guillen après réalisation de l’échancrure. Hiver 2010 (Source: Guy Fournier – Onema)  +, Le seuil de Piquet avant travaux d’effacement partiel. Octobre 2008 (Source: Guy Fournier – Onema)  +,
Apparition d’une brèche dans la digue en 2008 (Source: Agence de l’eau Rhin-Meuse).  +, Vue de l’ancien déversoir, maintien de la ligne d’eau dans le bief. Juin 2011 (Source: Agence de l’eau Rhin-Meuse).  +, Retalutage naturel des berges. Août 2011 (Source: Vincent Burgun - Onema)  +,
R
Approximate locations for different rehabilitation measures  +
L
July 2011  +, August 2011  +, October 2011  +,
F
April 2014. Completed Force Crag mine water treatment scheme. Photo by John Malley.  +
S
Scheme plan  +, During construction  +, Area besides Zambezie Drive prior to construction  +
H
Area of action in Segre River  +, Restoration works in river  +, Zone after restoration  +
T
Areas of reed plantng acting as biological filters  +, Lyde W arm by railway - tree maintenance to reduce shading  +, Lyde W arm up to Rough Pk - willow hurdles to reduce sediment runoff  +,
C
Map and aerial photograph of the area of action  +, State of the area before works  +, Artificial pond created in the area  +,
K
Astense Aa tijdens de herinrichting  +, Astense Aa na de herinrichting  +, Astense Aa 1 jaar na herinrichting  +
F
At the confluence between the Montone River (on the left) and the Rabbi Stream (on the right), the works included the removal of some embankments (in red) and the construction of a portion of an embankment in a backward position (in green). It is also foreseen to remove further embankments (in yellow), so as to ensure to both rivers .a wider hydromorphological dynamics.  +
P
River Tame pre-restoration  +, Construction of backwater at top of back channel  +, Construction of back channel and islands  +,
S
Crook Beck - Environment Agency inspecting new fences - where none had been before  +, River Wenning - new fencing protecting eroding banks  +, Austwick Beck - new infrastructure where there had been none.  +,
T
Fortuna lake location (source: www.panoramio.com)  +, Fisherman on Lake Fortuna (source: www.panoramio.com)  +, Intrance on the Rortuna Lake (source: www.vanatorul.ro)  +,
E
Selection of images of site before construction phase of project.  +, Section of Build Sequence Photographs.  +, Selection of photos from planting event.  +,
B
Babbs Mill reedbed creation  +
H
Lateral sheet piling used to create the weir  +, Sheet piling faced with concret  +, The structure once vegetated  +,
B
River Evenlode, May 2006  +, Created side bars, May 2006  +, Backwater (for high water flows), May 2006  +,
T
Backwater/ fish refuge on the Park Stream, Bossington Estate (tributary of the River Test) ©RRC June 2014  +, Channel narrowing and bed raising on the Park Stream, Bossington Estate (tributary of the River Test) ©RRC June 2014  +, Gravel infill shows the width of channel narrowing (40-60% of pre-restored channel) on the Park Stream, Bossington Estate (tributary of the River Test) ©RRC June 2014  +,