Basic proposals for restoration and enhancement of the stream of Vilamajor in Sant Antoni de Vilamajor +
New bioengineering elements in order to stabilize slope banks,Protect/restore riparian zone,,Works to safeguard the bridge ,,, +
F
New bioengineering elements in order to stabilize slope banks, Deflectors, Creation of wooden deflectors, Creation of gravel deflectors, Bed load addition, Bank reprofiling,,, ,,, +
R
Restoration project of the degraded area of the Molí source environment and improvement of river areas and adjacent riparian formations +
New bioengineering elements in order to stabilize slope banks, Bank stabilisation, Bank protection,,Restoring riparian vegetation,, ,,, +
New bioengineering elements in order to stabilize slope banks,Revetmens with local species,Removal of exotic plants, Restoring riparian vegetation,, ,,, +
New bioengineering elements in order to stabilize slope banks, Bank reprofiling,,Fencing, ,Fencing,,, +
New bioengineering elements in order to stabilize slope banks,Removal of exotic plants, Restoring riparian vegetation,, ,,, +
New bioengineering elements in order to stabilize slope banks,Removal of exotic plants, Restoring riparian vegetation,, ,,, +
New bioengineering elements in order to stabilize slope banks,Removal of exotic plants, Restoring riparian vegetation,, ,,, +
Restoration project in the stream of the Vall d'Horta and surrounds. Natural Park of Sant Llorenç del Munt i l'Obac. +
New bioengineering elements in order to stabilize slope banks, Creation of fish ladders,,Removal of exotic plants, Tree management,, ,,, +
New bioengineering elements in order to stabilize slope banks,Removal of concrete banks and bed,Revetments with local species,Restoring riparian vegetation,, ,,, +
T
New bioengineering elements in order to stabilize slope banks,,, ,,, +
E
New outflow and inflow from ecoremediation system, Smaller retention of the water and conversion into new channel,Creation of pond, Creation of new vegetated drainage ditches, Water treatment methods,Creation of meanders, ,maintenance of ERM system,Improved public access,,Information board erected, +
R
Restoring the river continuity of the Bresle River by returning it to its original bed in Sénarpont +
New riverbed along old channel,, Putting up fences and drinking points for livestock,Adjusting discharges and creating a monophogenetic discharge, Management regarding letting the river draw a natural river bed,,, +
H
New riverbed along old channel,,Creation of fish passes, ,Monitoring strategy,,Improved cooperation between energy producers and ecologists, +
L
New sluice structures,Creation of backwaters, Creation of wet woodland, Protect/restore riparian zone,, ,,Volunteer engagement,, +
E
Environment-friendly Reduction of Flood Risk in the Multi-thread Reach of the Czarny Dunajec River +
Opening inlets to side channels, Creation of gravel deflectors,, ,,, +
C
Partial diversion of river,Wetland habitat,, ,Planting wildflower mixes, Riparian tree planting, plug planting,Community Events, Community consultation, Community Events, Community Litter-picking work, Volunteer work parties using the local community.,, +
E
Partially deletion of barriers, Building of armourstone downstream of the structure was built to consolidate the bank and create a channel preferential flow to guide the fish,, ,The work was carried out dry by temporary diversion of the watercourse (cofferdam, pumping and return of water downstream site) to limit their impact on the environment.,, +
Partially deletion of barriers, Deposition of blocks to counter erosion and create a diverse profile,, ,Preservation of side walls to prevent erosion,, +
L
Placement of faggots, Deflectors, Marginal planting,,,Channel narrowing, Decrease sedimentation, Tree management, Cut back of trees,,,, +