Property:Measures values
Jump to navigation
Jump to search
This is a property of type String.
M
Excavator used to remove blockage,, ,,, +
R
Extensive planting, Introduction of gravel,,,Adding sinuosity, ,,Improved public access,Information provision,Participation in design +
G
Feasibility and Optioneering study nearing completion. Preferred option yet to be identified.,, ,,, +
W
Fenced off riverbank, Weir removal,,Creation of wet woodland, Creation of wetland, Riparian planting,, Hardened crossing points,,Community involvement, Engagement with schools,,Work with farmers and land managers +
D
Fenced off riverbank,,, Hardened crossing points, drinking bays,Farm advice and plans,,, +
S
Fenced off riverbank,,Fencing of riparian zone,, ,,Awareness raising, Media,,Practical volunteering activities like beach cleans, Public consultation, +
W
Fencing, Creation of fish passes, Cut back of trees,,, ,,, +
Fencing, Livestock fencing,,, Soft engineering methods, restored machinery track,,, +
R
Fish habitat restoration,, ,Increased fishing rights,,, +
T
Floating vegetated bank structures,, ,,, +
M
Grand Clos” site: hydraulic isolation of 3 temporary ponds to delay the date of autumn water fill in,“Relai” site: digging of 9 temporary ponds, ,Hydraulic calendars controlled by pumping and irrigation network,Users (hunters and farmers) consultation, +
T
Gravel augmentation,Fencing, Alternative drinkers, Nutrient management, Cut back of trees,,Improvement of channel morphology, Creation of fish passes, Avon dam fisheries water releases, Fish tracking, Fish biomanipulation, Nutrient modelling, Fish surveys, Heavy metal investigations,Farm advice and plans,Valuing social benefits of works, Community Education,,Community engagement, +
H
Gravel bar,,Re-instatement of old course, Channel narrowing, ,,, +
L
Gravel berms, Riffle creation, Bank reprofiling,,,Lowering of impoundment, Introducing large woody debris, Tree management, ,,, +
B
Green filters creation and two shallow, permanent lagoons,, ,Channels, vegetation and maintenance active, daily management,Sensitization, environmental education of scholars, public use and elaboration of dissemination materials,Improvement of the socio-economic and other culture heritage network +
S
Habitat restoration, Cleaning of spawning gravels, Creation of backwaters,,, ,The project enhanced 300m2 of riffle gravel salmonid spawning habitat at 9 sites.The project also carried out an additional 100m2 of gravel cleaning.,, +
Habitat restoration, Introducing large woody debris, faggot berms,,,Channel narrowing, ,,Community involvement, Community Education,, +
R
Habitat restoration, Re-introducing spawning gravel, Reopening of side channels,,, ,Reduced pollution,,, +
E
Habitat restoration, Removal of fish barriers, Cut back of trees,,, ,,, +
I
Habitat restoration,,Creation of backwaters, Creation of wetland, Creation of pond,,Habitat restoration, Creation of backwater, UK BAP habitat creation/restoration,,Ensuring biodiversity, Woodland management, Promoting riparian vegetation,,, +