Property:Measures values

From RESTORE
Jump to navigation Jump to search

This is a property of type String.

Showing 20 pages using this property.
G
Diversification of in-channel features, Soft erosion solutions, Introducing large woody debris,,Tree planting, Creation of backwaters,, ,,,  +
B
Dood hout, 6 Vispassages, Beschaduwing,,, ,,,Afspraken met belanghebbende over waterverdeling  +
H
Dood hout, Grind bedden,, Bouwen met Natuur,,,  +
Dood hout, Vispassages,Beschaduwing, ,,Afspraken met belanghebbende waterverdeling,  +
W
Dredging of sediment (mud), Weir modification,,, ,Ensuring biodiversity,Recreation,Information provision,Consultation  +
C
Dredging, Removal of rock-fill weir, Relocation of the drinking water pipes,Control of invasive species,, ,Protection of the island, Ensuring biodiversity,Recreation, Improvement of drinking water quality, Land purchase,Information provision, Consultation, Participation in works  +
R
Dredging, Weir modification, Creation of pipelines,,Cut back of trees,, ,Ensuring biodiversity,Recreation,Consultation,Information provision  +
H
Eel pass, Creation of fish passes,,, ,,,  +
R
Elimination of the pipeline on the left bank,Removal of sediment,Revetmens with local species,Habitat restoration,Improvement of channel morphology, ,,Comprehensive environmental restoration of a large area in contact with the National Park,  +
I
Embankment creation, Revetments with local species,Silvicultural treatments, Habitat creation,, ,,New pahts near the river,  +
B
Embankment creation,,Floodplain reconnection,,Adding sinuosity, ,,,  +
R
Embankment lowering,,Connection to wider floodplain,,Re-instatement of old course ,,Land purchase,  +
Embankment lowering,,Floodplain reconnection, Protect/restore riparian zone, Riparian planting,,Creation of braided channel, Channel naturalisation, ,Tree management works and re-opening of choked side channels is planned as part of 'Knowsley 2020' project. The site would have benefited from a long term tailored management plan.,Improved public access, Engagement with schools,,Community engagement,  +
K
Embankment removal, Diversification of in-channel features,,Rejuvination of river delta, widening of river channel,Widening to allow wandering sections ,,partnership working with organisations including the EA, NE & LDNPA, as well as the tenant farmer; site visits hosted to share project success and lessons,  +
P
Embankment renaturalization, Bank reprofiling,,Excavation for floodplain creation, Floodplain creation, Buffer strips,, ,,Improved public access,,  +
A
E
Emptying reservoir, Removal of flap gate, Removal of spillway, Dam removal, Creation of side leats, Implementation of distribution structures,Planting of banks, ,,,  +
C
Excavation of bedrock, Introduction of spawning gravels, Creation of pools, Creation of fish refuge areas,,, ,,,  +
M
Excavation of bedrock,,,Creation of meanders, Installation of a clay plug,,,  +
R
Excavation of bedrock,Construction of flood wall,Change in bed profile, Creation of pools, embayments and cascades created ,,,  +