Property:Measures values
Jump to navigation
Jump to search
This is a property of type String.
N
Deculverting,Creation of wetland, ,,Aesthetics, Improved public access,Climate change adaptation +
M
Deculverting,Floodplain creation, Sustainable urban drainage ponds (SUDs), Creation of backwaters, ,,, +
W
Deculverting,Tree management,Creation of meanders ,,Improved public access, +
I
Deepening of river floor, Removal of bank reinforcements, Creation of gravel banks, Bank reprofiling,,Large scale planting of native species, Creation of a flood expansion area,,Channel widening,Creation of willow island,Creation of braided channel, Channel naturalisation, embedding of rootballs and tree trunks, Creation of new bicycle path, natural seating stones places on banks,Waste management, provision of temporary toilet facilities,Information for the public, +
R
Deflectors, Bank reprofiling,,,Adding sinuosity, ,,, +
D
Deflectors, Bank stabilisation, Cattle drinkers, Introduction of gravel,,Tree planting, Tree management,,Channel narrowing, ,Fencing,,, +
H
Deflectors, Creation of fish passes, Removal of fish barriers, Creation of pools, Creation of fish refuge areas, introduction of blocks, Big rocks are placed in the stream, Creation of low flow channel,,Improving fish migration,, ,,, +
E
Deflectors, Creation of groynes, Riffle creation, Introduction of spawning gravels, Fish habitat restoration,,, ,,, +
R
Deflectors, Creation of low flow channel, Creation of fish spawn nursing places, Introduction of spawning gravels,,Construction of flood wall,,In-channel placement of boulders to provide flow diversity, ,Habitat improvement through water and vegetation management, Flow management,,, +
H
Deflectors, Installation of coir rolls, Removal of sediment,, ,,, +
C
Deflectors, Introduction of gravel,,, ,,, +
Y
Deflectors, Toeboard removal,Creation of wetland, Reedbed creation,, UK BAP habitat creation/restoration,,,, +
T
Deflectors,,Tree planting,,leaky woody dams, ,,, +
C
Deflectors,Tree management, ,,, +
R
Deflectors,Tree management,Bed raising,Marginal planting, Introducing large woody debris,,Reconnection to the riparian zone,Creation of wooden deflectors, Channel narrowing, ,,, +
Depth variation,Re-introducing stones, Introduction of gravel, Creation of fish passes,,Buffer strips, ,,,Participation in design,Information provision +
H
Developing angling infrastructure,, ,,Resolving angler/ canoeist conflict, +
D
Dismantling of the gates that block the water current, Creation of fish pass,,, One gate was kept in the river to prevent erosion, Bottom racks and banks were kept in order to prevent erosion,,, +
A
Dismantling of the mill, Leveling threshold with the water level, Helophytes planted, Bank stabilisation, Installation of geotextile,,,Creation of a sinuous channel ,,, +
F
Diversification of in-channel features, Creation of fish passes, Cut back of trees,,Tree management,, ,,, +