Removing inorganic material (sludge/fine sand. Photo: Kjetil Hansen, Rødøy municipality +, After removal of the inorganic material (sludge/fine sand), reinfoorcement of river bank and gravel for spawning grounds. Photo: Kristin B. Klausen, local watercoordinator. +, Excavation of sediment ponds in the upper part of the river. Photo: Kjetil Hansen, Rødøy municipality +, …
Prior to the stakes being cut and wiring in the coir rolls. +, This is the section of brook at Bunny prior to the installation of coir rolls. +, during installation of the coir rolls +, …
Arrival of mechanisation at the entry to the lake +, Excavators are waiting at the entry to the lake for suitable conditions to start work +, Preparation of access roads proved to be tricky due to rainfall. +, …
Longinoja after restauration may 2006 (photo: Liisa Laitinen) +, Longinoja restauration march 2006 (photo: Jukka Jormola) +, Longinoja brook after restoration (photo: Lasse Jarvenpaa; www.itamerihaaste.net) +, …
Restoration of Reinikkalankoski torrent before restoration (photo: Jukka Jormola)_1 +, Before restoration (photo.Markus Tapaninen) +, Restoration of Reinikkalankoski torrent before restoration (photo: Jukka Jormola)_2 +, …
Landuse pressures will be identified and solutions proposed (photo Vasiliy Kostiushyn) +, One of 17 massive concrete constructions built to regulate water flow and to avoid flooding downstream (photo Vasiliy Kostiushyn) +, Private buildings in the river valley (photo Vasiliy Kostiushyn) +, …
An alluvial bar on the upper Adour before (above) and after (opposite) the works. (Source: Véronique de Billy – Onema). +, The upper Adour with a treated left bank. (Source: Véronique de Billy – Onema). +
An example of improved urban marginal river habitat on the Nene +, Scour holes at Orton lock packed with woody material +, Marginal habitat improvement upstream of St James End Weir at Duston, Northamptonshire +, …