Case study:Restoration project of the degraded area of the Molí source environment and improvement of river areas and adjacent riparian formations: Difference between revisions
No edit summary |
No edit summary |
||
| Line 218: | Line 218: | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure=New bioengineering elements in order to stabilize slope banks,Bank stabilisation and erosion protection | |Bank and bed modifications measure=New bioengineering elements in order to stabilize slope banks,Bank stabilisation and erosion protection | ||
|Floodplain / River corridor= | |Floodplain / River corridor=Restoring riparian vegetation, | ||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Revision as of 11:46, 1 June 2017
Project overview
| Status | Complete |
|---|---|
| Project web site | |
| Themes | Habitat and biodiversity, Hydromorphology |
| Country | Spain |
| Main contact forename | Naturalea S.L. |
| Main contact surname | Naturalea S.L. |
| Main contact user ID | |
| Contact organisation | Naturalea S.L. |
| Contact organisation web site | |
| Partner organisations | |
| Parent multi-site project | |
| This is a parent project encompassing the following projects |
No |
Project summary
The area to be restored has been divided into two sections. In the first, there is a medieval wall damaged by time and erosion visible on the slope that separates the river bed. In the second, we see the effects of erosion caused by a channel: nearly vertical slope with landslides in some areas.
The main actions in this project are: the use of new bioengineering elements in order to stabilize slope banks and to prevent erosion in town wall; replaced the hard defenses by bioengineering structures; facilitate natural regeneration of riparian vegetation.
The project has a total budget of 94.788,5 € and is financed by the Municipality of Besalú.
Monitoring surveys and results
Lessons learnt
Image gallery
|
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||