Case study:Moreton Channel Gravel Reprofiling: Difference between revisions
No edit summary |
No edit summary |
||
| Line 18: | Line 18: | ||
|Project summary=The whole of the Moreton channel reach, downstream of the main house had been identified for re-profiling. A survey undertaken showed cross-sections of a fairly uniform profile, which could be improved. Works created a range of profiles along the reach including new pools and riffles and overall a more varied morphology. This has in turn enabled the river to support a more diverse ecology including a more varied habitat for 0+ up to adult salmonids. The works involved the use of a long reach excavator to move existing bed material within the channel. No material was brought on to the site or removed. | |Project summary=The whole of the Moreton channel reach, downstream of the main house had been identified for re-profiling. A survey undertaken showed cross-sections of a fairly uniform profile, which could be improved. Works created a range of profiles along the reach including new pools and riffles and overall a more varied morphology. This has in turn enabled the river to support a more diverse ecology including a more varied habitat for 0+ up to adult salmonids. The works involved the use of a long reach excavator to move existing bed material within the channel. No material was brought on to the site or removed. | ||
}} | }} | ||
{{Image gallery}} | |||
{{Image gallery end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case study subcatchment | {{Case study subcatchment | ||
|Subcatchment=Moreton Channel | |Subcatchment=Moreton Channel | ||
| Line 77: | Line 81: | ||
{{Monitoring documents}} | {{Monitoring documents}} | ||
{{Monitoring documents end}} | {{Monitoring documents end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Additional Documents end}} | {{Additional Documents end}} | ||
| Line 84: | Line 86: | ||
{{Additional links and references footer}} | {{Additional links and references footer}} | ||
{{Supplementary Information}} | {{Supplementary Information}} | ||
{{Toggle content end}} | |||
Revision as of 07:11, 6 September 2013
Project overview
| Status | Complete |
|---|---|
| Project web site | |
| Themes | Habitat and biodiversity |
| Country | England |
| Main contact forename | Alasdair |
| Main contact surname | Maxwell |
| Main contact user ID | |
| Contact organisation | Environment Agency |
| Contact organisation web site | http://www.environment-agency.gov.uk |
| Partner organisations | |
| Parent multi-site project | |
| This is a parent project encompassing the following projects |
No |
Project summary
The whole of the Moreton channel reach, downstream of the main house had been identified for re-profiling. A survey undertaken showed cross-sections of a fairly uniform profile, which could be improved. Works created a range of profiles along the reach including new pools and riffles and overall a more varied morphology. This has in turn enabled the river to support a more diverse ecology including a more varied habitat for 0+ up to adult salmonids. The works involved the use of a long reach excavator to move existing bed material within the channel. No material was brought on to the site or removed.
Monitoring surveys and results
Lessons learnt
Image gallery
|
Catchment and subcatchmentSelect a catchment/subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||