98 per cent of material from demolition work re-used, recycled or recovered. | 98 per cent of material from demolition work re-used, recycled or recovered. | ||
}} | }} | ||
{{Image gallery}} | |||
{{Image gallery end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case study subcatchment | {{Case study subcatchment | ||
|Subcatchment=Lee | |Subcatchment=Lee | ||
| Line 81: | Line 85: | ||
{{Monitoring documents}} | {{Monitoring documents}} | ||
{{Monitoring documents end}} | {{Monitoring documents end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Case study documents | {{Case study documents | ||
| Line 104: | Line 106: | ||
{{Additional links and references footer}} | {{Additional links and references footer}} | ||
{{Supplementary Information}} | {{Supplementary Information}} | ||
{{Toggle content end}} | |||
Revision as of 05:50, 6 September 2013
Project overview
| Status | Complete |
|---|---|
| Project web site | |
| Themes | Spatial planning |
| Country | England |
| Main contact forename | Mike |
| Main contact surname | Vaughan |
| Main contact user ID | |
| Contact organisation | Atkins, Olympic Development Authority |
| Contact organisation web site | http://http://www.landscapeinstitute.org/knowledge/olympics.php |
| Partner organisations | Atkins, Olympic Development Authority, Environment Agency, Natural England |
| Parent multi-site project | |
| This is a parent project encompassing the following projects |
No |
Project summary
The Olympic Park will bring lasting benefits to east London. After the Games, it will be transformed to include a huge urban park. The new park will link the tidal Thames Estuary to the south and the Hertfordshire countryside to the north.
Some of the major benefits to the environment include:
- 8kms of river restored
- 4,000 homes protected from flood
- 2 million tonnes soil decontaminated
- The largest urban park created in Europe for over 100 years
Native species planted, including oak, ash, willow, birch, hazel, holly, blackthorn and hawthorn – a home for wildlife in the middle of the city. 30,000 tonnes of silt removed from waterways. 280 hectares of brownfield land cleaned.
750 bat roost and bird boxes put on site.
45 hectares of wildlife habitat created.
20 million gallons of contaminated groundwater treated.
4000 homes in West Ham and Canning Town have reduced flood risk.
99.5 per cent of construction waste re-used, recycled or recovered.
98 per cent of material from demolition work re-used, recycled or recovered.
Monitoring surveys and results
Lessons learnt
Image gallery
|
Catchment and subcatchmentSelect a catchment/subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||