|Project summary=Aim of scheme:<br>- enhancement of tidal defences<br>- conservation enhancements<br>- recreation provision<br>Work undertaken:<br>- cleaning up of existing foreshore<br>- creation of new shingle beach<br>- attachment of horizontal and vertical timbers to promote algal growth<br>- reed planting in Bullhead dock<br>- reducing size of jetty increasing direct light to the foreshore The site is adjacent to the River Thames in Rotherhithe. Bellamys Wharf and Bullhead Dock were a sand and gravel unloading facility with a high jetty.<br>The initial proposal was to infill both docks, however only a small encroachment was allowed to enable the rebuilding of a new river wall at the other dock. | |Project summary=Aim of scheme:<br>- enhancement of tidal defences<br>- conservation enhancements<br>- recreation provision<br>Work undertaken:<br>- cleaning up of existing foreshore<br>- creation of new shingle beach<br>- attachment of horizontal and vertical timbers to promote algal growth<br>- reed planting in Bullhead dock<br>- reducing size of jetty increasing direct light to the foreshore The site is adjacent to the River Thames in Rotherhithe. Bellamys Wharf and Bullhead Dock were a sand and gravel unloading facility with a high jetty.<br>The initial proposal was to infill both docks, however only a small encroachment was allowed to enable the rebuilding of a new river wall at the other dock. | ||
Revision as of 14:05, 9 April 2014
This case study is pending approval by a RiverWiki administrator.
Project overview
| Status | Planned |
|---|---|
| Project web site | |
| Themes | |
| Country | England |
| Main contact forename | Alison |
| Main contact surname | Debney |
| Main contact user ID | |
| Contact organisation | Zoological Society of London |
| Contact organisation web site | |
| Partner organisations | |
| Parent multi-site project | |
| This is a parent project encompassing the following projects |
No |
Project summary
Aim of scheme:
- enhancement of tidal defences
- conservation enhancements
- recreation provision
Work undertaken:
- cleaning up of existing foreshore
- creation of new shingle beach
- attachment of horizontal and vertical timbers to promote algal growth
- reed planting in Bullhead dock
- reducing size of jetty increasing direct light to the foreshore The site is adjacent to the River Thames in Rotherhithe. Bellamys Wharf and Bullhead Dock were a sand and gravel unloading facility with a high jetty.
The initial proposal was to infill both docks, however only a small encroachment was allowed to enable the rebuilding of a new river wall at the other dock.
Monitoring surveys and results
Lessons learnt
Image gallery
|
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||