Case study:Wettingen, nature-like fish pass: Difference between revisions
(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=47.456879764508734, 8.321183323860168 }} {{Project overview |Project title=Wettingen, nature-like fish pass ...") |
No edit summary |
||
| Line 6: | Line 6: | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Economic aspects, Fisheries, Hydropower | |Themes=Economic aspects, Fisheries, Hydropower | ||
| Line 13: | Line 12: | ||
|Main contact surname=Binder | |Main contact surname=Binder | ||
|Multi-site=No | |Multi-site=No | ||
|Project summary=In Wettingen there is a great example of a small nature-like bypass channel at the weir Wettingen on the Limmat downstream from Zurich which surmounts the very big height of 18.30 m. Nature-like bypass channels total length is 620 m, discharge 0.4 m³/s and additional attraction water is 0.6 m³/s. Total difference in water level is 18.30 m with high mean slope 3 %.The lower section consists of a technical fish. | |||
Whereas a near-nature water course was formed in the upper section, a rocky-cascade fishway with a height of 10 meters surmounts the biggest part of the altitude. Due to the limited space the | |||
lower section consists of a vertical-slot-pass which is converted into a collection-gallery at the power house. | |||
Leading back the water course to the power house is not possiblewhen it comes to bigger bypass channels. | |||
Splitting the water into two branches offers a good solution for this small channel. The main branch continues towards the tailwater as a near-nature water course and ends further downstream, where a connection to the natural river bed is possible. The smaller second branch diverts from the main branch towards the power house and is formed as a vertical slot-pass. | |||
The nature-like bypass channel has a trail on its side, so the residents can enjoy the lovely scenery and see some trouts when passing by. | |||
}} | }} | ||
{{Case study subcatchment}} | {{Case study subcatchment}} | ||
Revision as of 11:31, 3 July 2013
This case study is pending approval by a RiverWiki administrator.
Project overview
| Status | Complete |
|---|---|
| Project web site | |
| Themes | Economic aspects, Fisheries, Hydropower |
| Country | Switzerland |
| Main contact forename | Walter |
| Main contact surname | Binder |
| Main contact user ID | |
| Contact organisation | |
| Contact organisation web site | |
| Partner organisations | |
| Parent multi-site project | |
| This is a parent project encompassing the following projects |
No |
Project summary
In Wettingen there is a great example of a small nature-like bypass channel at the weir Wettingen on the Limmat downstream from Zurich which surmounts the very big height of 18.30 m. Nature-like bypass channels total length is 620 m, discharge 0.4 m³/s and additional attraction water is 0.6 m³/s. Total difference in water level is 18.30 m with high mean slope 3 %.The lower section consists of a technical fish.
Whereas a near-nature water course was formed in the upper section, a rocky-cascade fishway with a height of 10 meters surmounts the biggest part of the altitude. Due to the limited space the
lower section consists of a vertical-slot-pass which is converted into a collection-gallery at the power house.
Leading back the water course to the power house is not possiblewhen it comes to bigger bypass channels.
Splitting the water into two branches offers a good solution for this small channel. The main branch continues towards the tailwater as a near-nature water course and ends further downstream, where a connection to the natural river bed is possible. The smaller second branch diverts from the main branch towards the power house and is formed as a vertical slot-pass.
The nature-like bypass channel has a trail on its side, so the residents can enjoy the lovely scenery and see some trouts when passing by.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Site
| Name | |
|---|---|
| WFD water body codes | |
| WFD (national) typology | |
| WFD water body name | |
| Pre-project morphology | |
| Reference morphology | |
| Desired post project morphology | |
| Heavily modified water body | |
| National/international site designation | |
| Local/regional site designations | |
| Protected species present | |
| Invasive species present | |
| Species of interest | |
| Dominant hydrology | |
| Dominant substrate | |
| River corridor land use | |
| Average bankfull channel width category | |
| Average bankfull channel width (m) | |
| Average bankfull channel depth category | |
| Average bankfull channel depth (m) | |
| Mean discharge category | |
| Mean annual discharge (m3/s) | |
| Average channel gradient category | |
| Average channel gradient | |
| Average unit stream power (W/m2) |
Project background
| Reach length directly affected (m) | |
|---|---|
| Project started | |
| Works started | |
| Works completed | |
| Project completed | |
| Total cost category | |
| Total cost (k€) | |
| Benefit to cost ratio | |
| Funding sources |
Cost for project phases
| Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
|---|---|---|---|---|---|
| Investigation and design | |||||
| Stakeholder engagement and communication | |||||
| Works and works supervision | |||||
| Post-project management and maintenance | |||||
| Monitoring |
Reasons for river restoration
| Mitigation of a pressure | |
|---|---|
| Hydromorphology | |
| Biology | |
| Physico-chemical | |
| Other reasons for the project |
Measures
Structural measures
| |
|---|---|
| Bank/bed modifications | |
| Floodplain / River corridor | |
| Planform / Channel pattern | |
| Other | |
Non-structural measures
| |
| Management interventions | |
| Social measures (incl. engagement) | |
| Other | |
Monitoring
Hydromorphological quality elements
| Element | When monitored | Type of monitoring | Control site used | Result | ||
|---|---|---|---|---|---|---|
| Before measures | After measures | Qualitative | Quantitative | |||
Biological quality elements
| Element | When monitored | Type of monitoring | Control site used | Result | ||
|---|---|---|---|---|---|---|
| Before measures | After measures | Qualitative | Quantitative | |||
Physico-chemical quality elements
| Element | When monitored | Type of monitoring | Control site used | Result | ||
|---|---|---|---|---|---|---|
| Before measures | After measures | Qualitative | Quantitative | |||
Any other monitoring, e.g. social, economic
| Element | When monitored | Type of monitoring | Control site used | Result | ||
|---|---|---|---|---|---|---|
| Before measures | After measures | Qualitative | Quantitative | |||
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
| Link | Description |
|---|
Supplementary Information
Edit Supplementary Information
