Case study:Wettingen, nature-like fish pass: Difference between revisions
(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=47.456879764508734, 8.321183323860168 }} {{Project overview |Project title=Wettingen, nature-like fish pass ...") |
No edit summary |
||
| (7 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
{{Case study status | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
| Line 6: | Line 6: | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Economic aspects, Fisheries, Hydropower | |Themes=Economic aspects, Fisheries, Hydropower | ||
| Line 13: | Line 12: | ||
|Main contact surname=Binder | |Main contact surname=Binder | ||
|Multi-site=No | |Multi-site=No | ||
|Project picture=Wettingen limmat2.jpg | |||
|Picture description=The nature-like bypass channels middle part has a rock-cascade pass. (photo by Pinja Kasvio) | |||
|Project summary=In Wettingen there is a great example of a small nature-like bypass channel at the weir Wettingen on the Limmat downstream from Zurich which surmounts the very big height of 18.30 m. Nature-like bypass channels total length is 620 m, discharge 0.4 m³/s and additional attraction water is 0.6 m³/s. Total difference in water level is 18.30 m with high mean slope 3 %.The lower section consists of a technical fish. | |||
Whereas a near-nature water course was formed in the upper section, a rocky-cascade fishway with a height of 10 meters surmounts the biggest part of the altitude. Due to the limited space the | |||
lower section consists of a vertical-slot-pass which is converted into a collection-gallery at the power house. | |||
Leading back the water course to the power house is not possiblewhen it comes to bigger bypass channels. | |||
Splitting the water into two branches offers a good solution for this small channel. The main branch continues towards the tailwater as a near-nature water course and ends further downstream, where a connection to the natural river bed is possible. The smaller second branch diverts from the main branch towards the power house and is formed as a vertical slot-pass. | |||
The nature-like bypass channel has a trail on its side, so the residents can enjoy the lovely scenery and see some trouts when passing by. | |||
}} | }} | ||
{{Image gallery}} | |||
{{Case study image | |||
|File name=Limmat fishway plan.JPG | |||
|Caption=Nature-like bypass channel: River Limmat, Wettingen (photo: Walter Binder) | |||
}} | |||
{{Case study image | |||
|File name=River Limmat plan.JPG | |||
|Caption=Downstream section of the River Limmat (photo: Walter Binder) | |||
}} | |||
{{Case study image | |||
|File name=Wettingen limmat1.jpg | |||
|Caption=Rock-cascade fish pass on River Limmat (photo:Pinja Kasvio) | |||
}} | |||
{{Case study image | |||
|File name=River Limmat hydropowerplant.JPG | |||
|Caption=River Limmat, hydropowerplant (photo: Pinja Kasvio) | |||
}} | |||
{{Image gallery end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case study subcatchment}} | {{Case study subcatchment}} | ||
{{Site}} | {{Site | ||
|Reference morphology=Bedrock cascade, Artificial channel, | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|Invasive species present=No | |||
|Dominant hydrology=Artificially regulated, | |||
|Dominant substrate=Bedrock, Gravel, | |||
|River corridor land use=Urban, Broadleaf/mixed plantation, | |||
}} | |||
{{Project background}} | {{Project background}} | ||
{{Motivations}} | {{Motivations}} | ||
| Line 29: | Line 66: | ||
{{Monitoring documents}} | {{Monitoring documents}} | ||
{{Monitoring documents end}} | {{Monitoring documents end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Additional Documents end}} | {{Additional Documents end}} | ||
| Line 36: | Line 71: | ||
{{Additional links and references footer}} | {{Additional links and references footer}} | ||
{{Supplementary Information}} | {{Supplementary Information}} | ||
{{Toggle content end}} | |||
Latest revision as of 11:02, 26 September 2013
Project overview
| Status | Complete |
|---|---|
| Project web site | |
| Themes | Economic aspects, Fisheries, Hydropower |
| Country | Switzerland |
| Main contact forename | Walter |
| Main contact surname | Binder |
| Main contact user ID | |
| Contact organisation | |
| Contact organisation web site | |
| Partner organisations | |
| Parent multi-site project | |
| This is a parent project encompassing the following projects |
No |
Project summary
In Wettingen there is a great example of a small nature-like bypass channel at the weir Wettingen on the Limmat downstream from Zurich which surmounts the very big height of 18.30 m. Nature-like bypass channels total length is 620 m, discharge 0.4 m³/s and additional attraction water is 0.6 m³/s. Total difference in water level is 18.30 m with high mean slope 3 %.The lower section consists of a technical fish.
Whereas a near-nature water course was formed in the upper section, a rocky-cascade fishway with a height of 10 meters surmounts the biggest part of the altitude. Due to the limited space the
lower section consists of a vertical-slot-pass which is converted into a collection-gallery at the power house.
Leading back the water course to the power house is not possiblewhen it comes to bigger bypass channels.
Splitting the water into two branches offers a good solution for this small channel. The main branch continues towards the tailwater as a near-nature water course and ends further downstream, where a connection to the natural river bed is possible. The smaller second branch diverts from the main branch towards the power house and is formed as a vertical slot-pass.
The nature-like bypass channel has a trail on its side, so the residents can enjoy the lovely scenery and see some trouts when passing by.
Monitoring surveys and results
Lessons learnt
Image gallery
|
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||