Case study:River Alt and Croxteth Brook Restoration Project.: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 29: | Line 29: | ||
{{Case study image | {{Case study image | ||
|File name=7 culvert downstream July 14.JPG | |File name=7 culvert downstream July 14.JPG | ||
|Caption=Exposed culvert at downstream tie in | |Caption=Exposed culvert at downstream tie in July 14 | ||
}} | }} | ||
{{Case study image | {{Case study image | ||
|File name=9 Early Sept 14 3.jpg | |File name=9 Early Sept 14 3.jpg | ||
|Caption=Steady progress. Channel holding rainwater | |Caption=Steady progress. Channel holding rainwater Sept 14 | ||
}} | }} | ||
{{Case study image | {{Case study image | ||
|File name=10 Retaining wall Oct 14.jpg | |File name=10 Retaining wall Oct 14.jpg | ||
|Caption=Green retaining wall at the upstream tie in | |Caption=Green retaining wall at the upstream tie in Oct 14 | ||
}} | }} | ||
{{Case study image | {{Case study image | ||
|File name=10 Early erosion before goetextile installation Oct 14.jpg | |File name=10 Early erosion before goetextile installation Oct 14.jpg | ||
|Caption=Bank erosion before geotextile installed | |Caption=Bank erosion before geotextile installed Oct 14 | ||
}} | }} | ||
{{Case study image | {{Case study image | ||
|File name=11 Eroded area with stone and geotextile.JPG | |File name=11 Eroded area with stone and geotextile.JPG | ||
|Caption=Erosion control installed | |Caption=Erosion control installed Nov 14 | ||
}} | }} | ||
{{Case study image | {{Case study image | ||
| Line 53: | Line 53: | ||
{{Case study image | {{Case study image | ||
|File name=12 treeplanting with school children.jpg | |File name=12 treeplanting with school children.jpg | ||
|Caption=300 people | |Caption=300 people including 250 local school children planted trees Dec 14 to Feb 15 | ||
}} | }} | ||
{{Case study image | {{Case study image | ||
|File name=01 Fencing starts today 26th Jan 15.jpg | |File name=01 Fencing starts today 26th Jan 15.jpg | ||
|Caption=Lancashite Wildlife Trust installing the perimeter fence | |Caption=Lancashite Wildlife Trust installing the perimeter fence Jan 15 | ||
}} | }} | ||
{{Case study image | {{Case study image | ||
|File name=01 LWT planting heavy standards Jan 15.jpg | |File name=01 LWT planting heavy standards Jan 15.jpg | ||
|Caption=Planting heavy standards | |Caption=Planting heavy standards Jan 15 | ||
}} | }} | ||
{{Image_gallery_end}} | {{Image_gallery_end}} | ||
Revision as of 15:55, 9 March 2015
This case study is pending approval by a RiverWiki administrator.
Location: 53° 27' 20.92" N, 2° 54' 24.71" W
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
| Status | In progress |
|---|---|
| Project web site | |
| Themes | Habitat and biodiversity, Hydromorphology, Monitoring, Social benefits, Urban |
| Country | England |
| Main contact forename | Helen |
| Main contact surname | Rawlinson |
| Main contact user ID | |
| Contact organisation | The Cass Foundation |
| Contact organisation web site | http://www.cassfoundation.org.uk |
| Partner organisations | Community Forests North West |
| Parent multi-site project | |
| This is a parent project encompassing the following projects |
No |
Project summary
Edit project overview to modify the project summary.
The River Alt & Croxteth Brook Restoration Project is a partnership that will use CRF funds to enable healthier, more productive and diverse ecosystems by removing culverts to create ‘renaturalised’ water courses. It will also make maintenance of the water courses easier, including the removal of rubbish and other obstructions, thus reducing the risk of flooding in the wider catchment.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
|
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||