<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://restorerivers.eu/wiki/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Peter.batty</id>
	<title>RESTORE - User contributions [en]</title>
	<link rel="self" type="application/atom+xml" href="https://restorerivers.eu/wiki/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Peter.batty"/>
	<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Special:Contributions/Peter.batty"/>
	<updated>2026-04-26T17:50:14Z</updated>
	<subtitle>User contributions</subtitle>
	<generator>MediaWiki 1.39.7</generator>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Forest_Halt,_Saltburn_Valley_Gardens&amp;diff=43467</id>
		<title>Case study:Forest Halt, Saltburn Valley Gardens</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Forest_Halt,_Saltburn_Valley_Gardens&amp;diff=43467"/>
		<updated>2019-02-20T16:25:57Z</updated>

		<summary type="html">&lt;p&gt;Peter.batty: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=54.5790498639419, -0.9703358996317775&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Economic aspects, Flood risk management, Social benefits&lt;br /&gt;
|Country=England&lt;br /&gt;
|Main contact forename=Peter&lt;br /&gt;
|Main contact surname=Batty&lt;br /&gt;
|Contact organisation=RAB Consultants&lt;br /&gt;
|Contact organisation url=www.rabconsultants.co.uk/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=WP 20181008 14 46 44 Pro.jpg&lt;br /&gt;
|Project summary=The initial scope of the project was to assess the overall structural and hydromorphological condition of the watercourse running through Saltburn Valley Gardens to identify areas on potential improvement. &lt;br /&gt;
&lt;br /&gt;
Three areas were identified as requiring intervention within the gardens where the part of the watercourse was beginning to effect infrastructure, namely the miniature railway line and the public car park or deposition is severely reducing the capacity of the channel. Given the lack of infrastructure surrounding the remainder of the watercourse this will be left to its natural processes. The first of the areas is located at the downstream end of the watercourse, at the confluence of Skelton Beck, Millholme Beck and the sea. At this location rapid erosion is taking place of the right-hand bank due to frequent inundation and the diversion of flows caused by silt deposition upstream, the second area of interest. The third area of interest and focus of this entry, is an area at the upstream end of the gardens adjacent to the final platform of the Saltburn Miniature Railway. This rapid response watercourse was regularly inundating the miniature railway and washing away both river bank and the sub base the tracks are laid on. The erosion was taking place on the outside of a sharp bend in the watercourse and various methods had pervious been tried to halt the erosion. All of these has subsequently failed leaving an area of bare earth with embedded pieces of gabion basket and other failed erosion protection measures. &lt;br /&gt;
&lt;br /&gt;
A feasibility study was then undertaken considering the following options: &lt;br /&gt;
&lt;br /&gt;
Do nothing &lt;br /&gt;
&lt;br /&gt;
Use of local tree root balls to be imbedded in the bank with willow revetment &lt;br /&gt;
&lt;br /&gt;
Use of vegetated bags with large stone revetment &lt;br /&gt;
&lt;br /&gt;
Inclined gabion stone baskets. &lt;br /&gt;
&lt;br /&gt;
Sheet piles with coir matting, willow faggots and rock rolls &lt;br /&gt;
&lt;br /&gt;
A matrix scoring each option against environmental, economic and technical criteria was created and option 5 was selected offering erosion protection, flood protection and environmental benefits. &lt;br /&gt;
&lt;br /&gt;
Detailed design, specification, construction drawings, method statement and environmental risk assessment were produced to allow the flood risk activity permit to be granted and the contractor to undertake the work. The works were undertaken in line with the methods statement approved by the Environment Agency which included a number of silt curtains and use of biodiesel.&lt;br /&gt;
|Project title=Forest Halt, Saltburn Valley Gardens&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Flood defence 6 S8B8458.jpg&lt;br /&gt;
|Caption=Forest Halt&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Flood defence 6 S8B84578.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=WP 20190131 11 05 415 Pro.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=147.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=20170621 113005.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Toggle button}}&lt;br /&gt;
{{Toggle content start}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Skelton Beck Catch (Saltburn) trib of North Sea&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Forest Halt, Saltburn Valley Gardens&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Protected species present=No&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=50&lt;br /&gt;
|Project started=2017/10/11&lt;br /&gt;
|Works started=2018/07/17&lt;br /&gt;
|Works completed=2018/08/28&lt;br /&gt;
|Project completed=2018/09/04&lt;br /&gt;
|Total cost category=more than 10000 k€&lt;br /&gt;
|Investigation and design cost category=5000 - 10000 k€&lt;br /&gt;
|Stakeholder1 engagement cost category=500 - 1000 k€&lt;br /&gt;
|Works1 and supervision cost category=more than 10000 k€&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Other motivation=Improving local park and protecting infrastructure&lt;br /&gt;
}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;br /&gt;
{{Toggle content end}}&lt;/div&gt;</summary>
		<author><name>Peter.batty</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:20170621_113005.jpg&amp;diff=43466</id>
		<title>File:20170621 113005.jpg</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:20170621_113005.jpg&amp;diff=43466"/>
		<updated>2019-02-20T16:25:43Z</updated>

		<summary type="html">&lt;p&gt;Peter.batty: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Peter.batty</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:147.jpg&amp;diff=43465</id>
		<title>File:147.jpg</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:147.jpg&amp;diff=43465"/>
		<updated>2019-02-20T16:21:26Z</updated>

		<summary type="html">&lt;p&gt;Peter.batty: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Peter.batty</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Forest_Halt,_Saltburn_Valley_Gardens&amp;diff=43464</id>
		<title>Case study:Forest Halt, Saltburn Valley Gardens</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Forest_Halt,_Saltburn_Valley_Gardens&amp;diff=43464"/>
		<updated>2019-02-20T15:56:28Z</updated>

		<summary type="html">&lt;p&gt;Peter.batty: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=54.5790498639419, -0.9703358996317775&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Economic aspects, Flood risk management, Social benefits&lt;br /&gt;
|Country=England&lt;br /&gt;
|Main contact forename=Peter&lt;br /&gt;
|Main contact surname=Batty&lt;br /&gt;
|Contact organisation=RAB Consultants&lt;br /&gt;
|Contact organisation url=www.rabconsultants.co.uk/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=WP 20181008 14 46 44 Pro.jpg&lt;br /&gt;
|Project summary=The initial scope of the project was to assess the overall structural and hydromorphological condition of the watercourse running through Saltburn Valley Gardens to identify areas on potential improvement. &lt;br /&gt;
&lt;br /&gt;
Three areas were identified as requiring intervention within the gardens where the part of the watercourse was beginning to effect infrastructure, namely the miniature railway line and the public car park or deposition is severely reducing the capacity of the channel. Given the lack of infrastructure surrounding the remainder of the watercourse this will be left to its natural processes. The first of the areas is located at the downstream end of the watercourse, at the confluence of Skelton Beck, Millholme Beck and the sea. At this location rapid erosion is taking place of the right-hand bank due to frequent inundation and the diversion of flows caused by silt deposition upstream, the second area of interest. The third area of interest and focus of this entry, is an area at the upstream end of the gardens adjacent to the final platform of the Saltburn Miniature Railway. This rapid response watercourse was regularly inundating the miniature railway and washing away both river bank and the sub base the tracks are laid on. The erosion was taking place on the outside of a sharp bend in the watercourse and various methods had pervious been tried to halt the erosion. All of these has subsequently failed leaving an area of bare earth with embedded pieces of gabion basket and other failed erosion protection measures. &lt;br /&gt;
&lt;br /&gt;
A feasibility study was then undertaken considering the following options: &lt;br /&gt;
&lt;br /&gt;
Do nothing &lt;br /&gt;
&lt;br /&gt;
Use of local tree root balls to be imbedded in the bank with willow revetment &lt;br /&gt;
&lt;br /&gt;
Use of vegetated bags with large stone revetment &lt;br /&gt;
&lt;br /&gt;
Inclined gabion stone baskets. &lt;br /&gt;
&lt;br /&gt;
Sheet piles with coir matting, willow faggots and rock rolls &lt;br /&gt;
&lt;br /&gt;
A matrix scoring each option against environmental, economic and technical criteria was created and option 5 was selected offering erosion protection, flood protection and environmental benefits. &lt;br /&gt;
&lt;br /&gt;
Detailed design, specification, construction drawings, method statement and environmental risk assessment were produced to allow the flood risk activity permit to be granted and the contractor to undertake the work. The works were undertaken in line with the methods statement approved by the Environment Agency which included a number of silt curtains and use of biodiesel.&lt;br /&gt;
|Project title=Forest Halt, Saltburn Valley Gardens&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Flood defence 6 S8B8458.jpg&lt;br /&gt;
|Caption=Forest Halt&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Flood defence 6 S8B84578.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=WP 20190131 11 05 415 Pro.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Toggle button}}&lt;br /&gt;
{{Toggle content start}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Skelton Beck Catch (Saltburn) trib of North Sea&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Forest Halt, Saltburn Valley Gardens&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Protected species present=No&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=50&lt;br /&gt;
|Project started=2017/10/11&lt;br /&gt;
|Works started=2018/07/17&lt;br /&gt;
|Works completed=2018/08/28&lt;br /&gt;
|Project completed=2018/09/04&lt;br /&gt;
|Total cost category=more than 10000 k€&lt;br /&gt;
|Investigation and design cost category=5000 - 10000 k€&lt;br /&gt;
|Stakeholder1 engagement cost category=500 - 1000 k€&lt;br /&gt;
|Works1 and supervision cost category=more than 10000 k€&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Other motivation=Improving local park and protecting infrastructure&lt;br /&gt;
}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;br /&gt;
{{Toggle content end}}&lt;/div&gt;</summary>
		<author><name>Peter.batty</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Forest_Halt,_Saltburn_Valley_Gardens&amp;diff=43463</id>
		<title>Case study:Forest Halt, Saltburn Valley Gardens</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Forest_Halt,_Saltburn_Valley_Gardens&amp;diff=43463"/>
		<updated>2019-02-20T15:53:59Z</updated>

		<summary type="html">&lt;p&gt;Peter.batty: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=54.5790498639419, -0.9703358996317775&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Economic aspects, Flood risk management, Social benefits&lt;br /&gt;
|Country=England&lt;br /&gt;
|Main contact forename=Peter&lt;br /&gt;
|Main contact surname=Batty&lt;br /&gt;
|Contact organisation=RAB Consultants&lt;br /&gt;
|Contact organisation url=www.rabconsultants.co.uk/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=WP 20181008 14 46 44 Pro.jpg&lt;br /&gt;
|Project summary=The initial scope of the project was to assess the overall structural and hydromorphological condition of the watercourse running through Saltburn Valley Gardens to identify areas on potential improvement. &lt;br /&gt;
&lt;br /&gt;
Three areas were identified as requiring intervention within the gardens where the part of the watercourse was beginning to effect infrastructure, namely the miniature railway line and the public car park or deposition is severely reducing the capacity of the channel. Given the lack of infrastructure surrounding the remainder of the watercourse this will be left to its natural processes. The first of the areas is located at the downstream end of the watercourse, at the confluence of Skelton Beck, Millholme Beck and the sea. At this location rapid erosion is taking place of the right-hand bank due to frequent inundation and the diversion of flows caused by silt deposition upstream, the second area of interest. The third area of interest and focus of this entry, is an area at the upstream end of the gardens adjacent to the final platform of the Saltburn Miniature Railway. This rapid response watercourse was regularly inundating the miniature railway and washing away both river bank and the sub base the tracks are laid on. The erosion was taking place on the outside of a sharp bend in the watercourse and various methods had pervious been tried to halt the erosion. All of these has subsequently failed leaving an area of bare earth with embedded pieces of gabion basket and other failed erosion protection measures. &lt;br /&gt;
&lt;br /&gt;
A feasibility study was then undertaken considering the following options: &lt;br /&gt;
&lt;br /&gt;
Do nothing &lt;br /&gt;
&lt;br /&gt;
Use of local tree root balls to be imbedded in the bank with willow revetment &lt;br /&gt;
&lt;br /&gt;
Use of vegetated bags with large stone revetment &lt;br /&gt;
&lt;br /&gt;
Inclined gabion stone baskets. &lt;br /&gt;
&lt;br /&gt;
Sheet piles with coir matting, willow faggots and rock rolls &lt;br /&gt;
&lt;br /&gt;
A matrix scoring each option against environmental, economic and technical criteria was created and option 5 was selected offering erosion protection, flood protection and environmental benefits. &lt;br /&gt;
&lt;br /&gt;
Detailed design, specification, construction drawings, method statement and environmental risk assessment were produced to allow the flood risk activity permit to be granted and the contractor to undertake the work. The works were undertaken in line with the methods statement approved by the Environment Agency which included a number of silt curtains and use of biodiesel.&lt;br /&gt;
|Project title=Forest Halt, Saltburn Valley Gardens&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Flood defence 6 S8B8458.jpg&lt;br /&gt;
|Caption=Forest Halt&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Flood defence 6 S8B84578.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=WP 20190131 11 05 415 Pro.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Toggle button}}&lt;br /&gt;
{{Toggle content start}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Skelton Beck Catch (Saltburn) trib of North Sea&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Forest Halt, Saltburn Valley Gardens&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Protected species present=No&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
}}&lt;br /&gt;
{{Project background}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Other motivation=Improving local park and protecting infrastructure&lt;br /&gt;
}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;br /&gt;
{{Toggle content end}}&lt;/div&gt;</summary>
		<author><name>Peter.batty</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Forest_Halt,_Saltburn_Valley_Gardens&amp;diff=43462</id>
		<title>Case study:Forest Halt, Saltburn Valley Gardens</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Forest_Halt,_Saltburn_Valley_Gardens&amp;diff=43462"/>
		<updated>2019-02-20T15:53:03Z</updated>

		<summary type="html">&lt;p&gt;Peter.batty: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=54.5790498639419, -0.9703358996317775&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Economic aspects, Flood risk management, Social benefits&lt;br /&gt;
|Country=England&lt;br /&gt;
|Main contact forename=Peter&lt;br /&gt;
|Main contact surname=Batty&lt;br /&gt;
|Contact organisation=RAB Consultants&lt;br /&gt;
|Contact organisation url=www.rabconsultants.co.uk/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=WP 20181008 14 46 44 Pro.jpg&lt;br /&gt;
|Project summary=The initial scope of the project was to assess the overall structural and hydromorphological condition of the watercourse running through Saltburn Valley Gardens to identify areas on potential improvement. &lt;br /&gt;
&lt;br /&gt;
Three areas were identified as requiring intervention within the gardens where the part of the watercourse was beginning to effect infrastructure, namely the miniature railway line and the public car park or deposition is severely reducing the capacity of the channel. Given the lack of infrastructure surrounding the remainder of the watercourse this will be left to its natural processes. The first of the areas is located at the downstream end of the watercourse, at the confluence of Skelton Beck, Millholme Beck and the sea. At this location rapid erosion is taking place of the right-hand bank due to frequent inundation and the diversion of flows caused by silt deposition upstream, the second area of interest. The third area of interest and focus of this entry, is an area at the upstream end of the gardens adjacent to the final platform of the Saltburn Miniature Railway. This rapid response watercourse was regularly inundating the miniature railway and washing away both river bank and the sub base the tracks are laid on. The erosion was taking place on the outside of a sharp bend in the watercourse and various methods had pervious been tried to halt the erosion. All of these has subsequently failed leaving an area of bare earth with embedded pieces of gabion basket and other failed erosion protection measures. &lt;br /&gt;
&lt;br /&gt;
A feasibility study was then undertaken considering the following options: &lt;br /&gt;
&lt;br /&gt;
Do nothing &lt;br /&gt;
&lt;br /&gt;
Use of local tree root balls to be imbedded in the bank with willow revetment &lt;br /&gt;
&lt;br /&gt;
Use of vegetated bags with large stone revetment &lt;br /&gt;
&lt;br /&gt;
Inclined gabion stone baskets. &lt;br /&gt;
&lt;br /&gt;
Sheet piles with coir matting, willow faggots and rock rolls &lt;br /&gt;
&lt;br /&gt;
A matrix scoring each option against environmental, economic and technical criteria was created and option 5 was selected offering erosion protection, flood protection and environmental benefits. &lt;br /&gt;
&lt;br /&gt;
Detailed design, specification, construction drawings, method statement and environmental risk assessment were produced to allow the flood risk activity permit to be granted and the contractor to undertake the work. The works were undertaken in line with the methods statement approved by the Environment Agency which included a number of silt curtains and use of biodiesel.&lt;br /&gt;
|Project title=Forest Halt, Saltburn Valley Gardens&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Flood defence 6 S8B8458.jpg&lt;br /&gt;
|Caption=Forest Halt&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Flood defence 6 S8B84578.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=WP 20190131 11 05 415 Pro.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Toggle button}}&lt;br /&gt;
{{Toggle content start}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Skelton Beck Catch (Saltburn) trib of North Sea&lt;br /&gt;
}}&lt;br /&gt;
{{Site}}&lt;br /&gt;
{{Project background}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Other motivation=Improving local park and protecting infrastructure&lt;br /&gt;
}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;br /&gt;
{{Toggle content end}}&lt;/div&gt;</summary>
		<author><name>Peter.batty</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Forest_Halt,_Saltburn_Valley_Gardens&amp;diff=43461</id>
		<title>Case study:Forest Halt, Saltburn Valley Gardens</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Forest_Halt,_Saltburn_Valley_Gardens&amp;diff=43461"/>
		<updated>2019-02-20T15:51:36Z</updated>

		<summary type="html">&lt;p&gt;Peter.batty: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=54.5790498639419, -0.9703358996317775&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Economic aspects, Flood risk management, Social benefits&lt;br /&gt;
|Country=England&lt;br /&gt;
|Main contact forename=Peter&lt;br /&gt;
|Main contact surname=Batty&lt;br /&gt;
|Contact organisation=RAB Consultants&lt;br /&gt;
|Contact organisation url=www.rabconsultants.co.uk/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=WP 20181008 14 46 44 Pro.jpg&lt;br /&gt;
|Project summary=The initial scope of the project was to assess the overall structural and hydromorphological condition of the watercourse running through Saltburn Valley Gardens to identify areas on potential improvement. &lt;br /&gt;
&lt;br /&gt;
Three areas were identified as requiring intervention within the gardens where the part of the watercourse was beginning to effect infrastructure, namely the miniature railway line and the public car park or deposition is severely reducing the capacity of the channel. Given the lack of infrastructure surrounding the remainder of the watercourse this will be left to its natural processes. The first of the areas is located at the downstream end of the watercourse, at the confluence of Skelton Beck, Millholme Beck and the sea. At this location rapid erosion is taking place of the right-hand bank due to frequent inundation and the diversion of flows caused by silt deposition upstream, the second area of interest. The third area of interest and focus of this entry, is an area at the upstream end of the gardens adjacent to the final platform of the Saltburn Miniature Railway. This rapid response watercourse was regularly inundating the miniature railway and washing away both river bank and the sub base the tracks are laid on. The erosion was taking place on the outside of a sharp bend in the watercourse and various methods had pervious been tried to halt the erosion. All of these has subsequently failed leaving an area of bare earth with embedded pieces of gabion basket and other failed erosion protection measures. &lt;br /&gt;
&lt;br /&gt;
A feasibility study was then undertaken considering the following options: &lt;br /&gt;
&lt;br /&gt;
Do nothing &lt;br /&gt;
&lt;br /&gt;
Use of local tree root balls to be imbedded in the bank with willow revetment &lt;br /&gt;
&lt;br /&gt;
Use of vegetated bags with large stone revetment &lt;br /&gt;
&lt;br /&gt;
Inclined gabion stone baskets. &lt;br /&gt;
&lt;br /&gt;
Sheet piles with coir matting, willow faggots and rock rolls &lt;br /&gt;
&lt;br /&gt;
A matrix scoring each option against environmental, economic and technical criteria was created and option 5 was selected offering erosion protection, flood protection and environmental benefits. &lt;br /&gt;
&lt;br /&gt;
Detailed design, specification, construction drawings, method statement and environmental risk assessment were produced to allow the flood risk activity permit to be granted and the contractor to undertake the work. The works were undertaken in line with the methods statement approved by the Environment Agency which included a number of silt curtains and use of biodiesel.&lt;br /&gt;
|Project title=Forest Halt, Saltburn Valley Gardens&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Flood defence 6 S8B8458.jpg&lt;br /&gt;
|Caption=Forest Halt&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Flood defence 6 S8B84578.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=WP 20190131 11 05 415 Pro.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Toggle button}}&lt;br /&gt;
{{Toggle content start}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Skelton Beck Catch (Saltburn) trib of North Sea&lt;br /&gt;
}}&lt;br /&gt;
{{Site}}&lt;br /&gt;
{{Project background}}&lt;br /&gt;
{{Motivations}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;br /&gt;
{{Toggle content end}}&lt;/div&gt;</summary>
		<author><name>Peter.batty</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:WP_20181008_14_46_44_Pro.jpg&amp;diff=43460</id>
		<title>File:WP 20181008 14 46 44 Pro.jpg</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:WP_20181008_14_46_44_Pro.jpg&amp;diff=43460"/>
		<updated>2019-02-20T15:51:15Z</updated>

		<summary type="html">&lt;p&gt;Peter.batty: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Peter.batty</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Forest_Halt,_Saltburn_Valley_Gardens&amp;diff=43459</id>
		<title>Case study:Forest Halt, Saltburn Valley Gardens</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Forest_Halt,_Saltburn_Valley_Gardens&amp;diff=43459"/>
		<updated>2019-02-20T15:49:22Z</updated>

		<summary type="html">&lt;p&gt;Peter.batty: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=54.5790498639419, -0.9703358996317775&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Project title=Forest Halt, Saltburn Valley Gardens&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Economic aspects, Flood risk management, Social benefits&lt;br /&gt;
|Country=England&lt;br /&gt;
|Main contact forename=Peter&lt;br /&gt;
|Main contact surname=Batty&lt;br /&gt;
|Contact organisation=RAB Consultants&lt;br /&gt;
|Contact organisation url=www.rabconsultants.co.uk/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Flood defence 6 S8B8458.jpg&lt;br /&gt;
|Caption=Forest Halt&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Flood defence 6 S8B84578.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=WP 20190131 11 05 415 Pro.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Toggle button}}&lt;br /&gt;
{{Toggle content start}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Skelton Beck Catch (Saltburn) trib of North Sea&lt;br /&gt;
}}&lt;br /&gt;
{{Site}}&lt;br /&gt;
{{Project background}}&lt;br /&gt;
{{Motivations}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;br /&gt;
{{Toggle content end}}&lt;/div&gt;</summary>
		<author><name>Peter.batty</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Forest_Halt,_Saltburn_Valley_Gardens&amp;diff=43458</id>
		<title>Case study:Forest Halt, Saltburn Valley Gardens</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Forest_Halt,_Saltburn_Valley_Gardens&amp;diff=43458"/>
		<updated>2019-02-20T15:48:52Z</updated>

		<summary type="html">&lt;p&gt;Peter.batty: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=54.5790498639419, -0.9703358996317775&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Project title=Forest Halt, Saltburn Valley Gardens&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Economic aspects, Flood risk management, Social benefits&lt;br /&gt;
|Country=England&lt;br /&gt;
|Main contact forename=Peter&lt;br /&gt;
|Main contact surname=Batty&lt;br /&gt;
|Contact organisation=RAB Consultants&lt;br /&gt;
|Contact organisation url=www.rabconsultants.co.uk/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Flood defence 6 S8B8458.jpg&lt;br /&gt;
|Caption=Forest Halt&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Flood defence 6 S8B84578.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=WP 20190131 11 05 415 Pro.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Toggle button}}&lt;br /&gt;
{{Toggle content start}}&lt;br /&gt;
{{Case study subcatchment}}&lt;br /&gt;
{{Site}}&lt;br /&gt;
{{Project background}}&lt;br /&gt;
{{Motivations}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;br /&gt;
{{Toggle content end}}&lt;/div&gt;</summary>
		<author><name>Peter.batty</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:WP_20190131_11_05_415_Pro.jpg&amp;diff=43457</id>
		<title>File:WP 20190131 11 05 415 Pro.jpg</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:WP_20190131_11_05_415_Pro.jpg&amp;diff=43457"/>
		<updated>2019-02-20T15:48:24Z</updated>

		<summary type="html">&lt;p&gt;Peter.batty: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Peter.batty</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Forest_Halt,_Saltburn_Valley_Gardens&amp;diff=43456</id>
		<title>Case study:Forest Halt, Saltburn Valley Gardens</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Forest_Halt,_Saltburn_Valley_Gardens&amp;diff=43456"/>
		<updated>2019-02-20T15:47:25Z</updated>

		<summary type="html">&lt;p&gt;Peter.batty: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=54.5790498639419, -0.9703358996317775&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Project title=Forest Halt, Saltburn Valley Gardens&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Economic aspects, Flood risk management, Social benefits&lt;br /&gt;
|Country=England&lt;br /&gt;
|Main contact forename=Peter&lt;br /&gt;
|Main contact surname=Batty&lt;br /&gt;
|Contact organisation=RAB Consultants&lt;br /&gt;
|Contact organisation url=www.rabconsultants.co.uk/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Flood defence 6 S8B8458.jpg&lt;br /&gt;
|Caption=Forest Halt&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Flood defence 6 S8B84578.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Toggle button}}&lt;br /&gt;
{{Toggle content start}}&lt;br /&gt;
{{Case study subcatchment}}&lt;br /&gt;
{{Site}}&lt;br /&gt;
{{Project background}}&lt;br /&gt;
{{Motivations}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;br /&gt;
{{Toggle content end}}&lt;/div&gt;</summary>
		<author><name>Peter.batty</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:Flood_defence_6_S8B84578.jpg&amp;diff=43455</id>
		<title>File:Flood defence 6 S8B84578.jpg</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:Flood_defence_6_S8B84578.jpg&amp;diff=43455"/>
		<updated>2019-02-20T15:46:53Z</updated>

		<summary type="html">&lt;p&gt;Peter.batty: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Peter.batty</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:WP_20190131_11_05_45_Pro.jpg&amp;diff=43454</id>
		<title>File:WP 20190131 11 05 45 Pro.jpg</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:WP_20190131_11_05_45_Pro.jpg&amp;diff=43454"/>
		<updated>2019-02-20T15:45:44Z</updated>

		<summary type="html">&lt;p&gt;Peter.batty: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Peter.batty</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:Flood_defence_6_S8B8458.jpg&amp;diff=43453</id>
		<title>File:Flood defence 6 S8B8458.jpg</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:Flood_defence_6_S8B8458.jpg&amp;diff=43453"/>
		<updated>2019-02-20T15:45:11Z</updated>

		<summary type="html">&lt;p&gt;Peter.batty: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Peter.batty</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Forest_Halt,_Saltburn_Valley_Gardens&amp;diff=43452</id>
		<title>Case study:Forest Halt, Saltburn Valley Gardens</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Forest_Halt,_Saltburn_Valley_Gardens&amp;diff=43452"/>
		<updated>2019-02-20T15:43:34Z</updated>

		<summary type="html">&lt;p&gt;Peter.batty: Created page with &amp;quot;{{Case study status |Approval status=Draft }} {{Location |Location=54.5790498639419, -0.9703358996317775 }} {{Project overview |Project title=Forest Halt, Saltburn Valley Gard...&amp;quot;&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=54.5790498639419, -0.9703358996317775&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Project title=Forest Halt, Saltburn Valley Gardens&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Economic aspects, Flood risk management, Social benefits&lt;br /&gt;
|Country=England&lt;br /&gt;
|Main contact forename=Peter&lt;br /&gt;
|Main contact surname=Batty&lt;br /&gt;
|Contact organisation=RAB Consultants&lt;br /&gt;
|Contact organisation url=www.rabconsultants.co.uk/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Toggle button}}&lt;br /&gt;
{{Toggle content start}}&lt;br /&gt;
{{Case study subcatchment}}&lt;br /&gt;
{{Site}}&lt;br /&gt;
{{Project background}}&lt;br /&gt;
{{Motivations}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;br /&gt;
{{Toggle content end}}&lt;/div&gt;</summary>
		<author><name>Peter.batty</name></author>
	</entry>
</feed>