<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://restorerivers.eu/wiki/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=PeGon</id>
	<title>RESTORE - User contributions [en]</title>
	<link rel="self" type="application/atom+xml" href="https://restorerivers.eu/wiki/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=PeGon"/>
	<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Special:Contributions/PeGon"/>
	<updated>2026-04-28T21:15:01Z</updated>
	<subtitle>User contributions</subtitle>
	<generator>MediaWiki 1.39.7</generator>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48047</id>
		<title>Case study:Bidasoa Dam removal 2</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48047"/>
		<updated>2021-05-24T21:34:51Z</updated>

		<summary type="html">&lt;p&gt;PeGon: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=43.2808504, -1.6830042&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Environmental flows and water resources, Habitat and biodiversity, Hydromorphology&lt;br /&gt;
|Country=Spain&lt;br /&gt;
|Main contact forename=Maria Eugenia&lt;br /&gt;
|Main contact surname=Hernando&lt;br /&gt;
|Contact organisation=Servicio de Biodiversidad. Departamento de Desarrollo Rural y Medio Ambiente de Navarra&lt;br /&gt;
|Contact organisation url=https://www.navarra.es/home_es/Temas/Medio+Ambiente/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project summary=The demolition of the San Martín or Bera Dam, 2.85 m high and 102.84 meters long, was carried out. It is the third obstacle in the Bidasoa River from the sea. The works begin on 08/29/2016 and conclude on 10/4/2016 The following actions were carried out during the works: &lt;br /&gt;
• Access to the work, cofferdams and conditions. Clearing and clearing of vegetation&lt;br /&gt;
• Demolition of the structures (weir and plant intake) and in situ valorization of the materials as fill.&lt;br /&gt;
• Regularizing and conserving the gravels of the riverbed.&lt;br /&gt;
• Repair of accesses and revegetation of the affected areas&lt;br /&gt;
|Project title=Bidasoa Dam removal&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Bera.JPG&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Irekibai presab 1473174055.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Toggle button}}&lt;br /&gt;
{{Toggle content start}}&lt;br /&gt;
{{Case study subcatchment}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Vera de Bidasoa&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Local site designation=Bidasoa&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Species=Salmon, tarpon, lamprey and burtaine&lt;br /&gt;
|River corridor land use=Plantation forestry, Urban,&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=1500&lt;br /&gt;
|Works started=2016/08/29&lt;br /&gt;
|Project completed=2016/10/04&lt;br /&gt;
|Total cost category=more than 10000 k€&lt;br /&gt;
|Funding sources=EU LIFE Programme, Government of Navarra,&lt;br /&gt;
|Works1 and supervision cost category=more than 10000 k€&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Barriers to fish migration, Impoundments (not hydropower),&lt;br /&gt;
|Hydromorphological quality elements=Continuity for organisms, Continuity of sediment transport, Quantity &amp;amp; dynamics of flow,&lt;br /&gt;
|Biological quality elements=Fish,&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=Dam removal,&lt;br /&gt;
|Floodplain / River corridor=Barrier removal, Connection to wider floodplain,&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Case study monitoring documents&lt;br /&gt;
|Monitoring document=Irekibai InformeLayman cas def.pdf&lt;br /&gt;
}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=https://www.irekibai.eu/&lt;br /&gt;
|Description=European LIFE proyect&lt;br /&gt;
}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=https://vimeo.com/192600424&lt;br /&gt;
|Description=Time-lapse Dam removal&lt;br /&gt;
}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;br /&gt;
{{Toggle content end}}&lt;/div&gt;</summary>
		<author><name>PeGon</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48046</id>
		<title>Case study:Bidasoa Dam removal 2</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48046"/>
		<updated>2021-05-24T21:33:04Z</updated>

		<summary type="html">&lt;p&gt;PeGon: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=43.2808504, -1.6830042&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Environmental flows and water resources, Habitat and biodiversity, Hydromorphology&lt;br /&gt;
|Country=Spain&lt;br /&gt;
|Main contact forename=Maria Eugenia&lt;br /&gt;
|Main contact surname=Hernando&lt;br /&gt;
|Contact organisation=Servicio de Biodiversidad. Departamento de Desarrollo Rural y Medio Ambiente de Navarra&lt;br /&gt;
|Contact organisation url=https://www.navarra.es/home_es/Temas/Medio+Ambiente/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project summary=The demolition of the San Martín or Bera Dam, 2.85 m high and 102.84 meters long, was carried out. It is the third obstacle in the Bidasoa River from the sea. The works begin on 08/29/2016 and conclude on 10/4/2016 The following actions were carried out during the works: &lt;br /&gt;
• Access to the work, cofferdams and conditions. Clearing and clearing of vegetation&lt;br /&gt;
• Demolition of the structures (weir and plant intake) and in situ valorization of the materials as fill.&lt;br /&gt;
• Regularizing and conserving the gravels of the riverbed.&lt;br /&gt;
• Repair of accesses and revegetation of the affected areas&lt;br /&gt;
|Project title=Bidasoa Dam removal&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Bera.JPG&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Irekibai presab 1473174055.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Toggle button}}&lt;br /&gt;
{{Toggle content start}}&lt;br /&gt;
{{Case study subcatchment}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Vera de Bidasoa&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Local site designation=Bidasoa&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Species=Salmon, tarpon, lamprey and burtaine&lt;br /&gt;
|River corridor land use=Plantation forestry, Urban,&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=1500&lt;br /&gt;
|Works started=2016/08/29&lt;br /&gt;
|Project completed=2016/10/04&lt;br /&gt;
|Total cost category=more than 10000 k€&lt;br /&gt;
|Funding sources=EU LIFE Programme, Government of Navarra,&lt;br /&gt;
|Works1 and supervision cost category=more than 10000 k€&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Barriers to fish migration, Impoundments (not hydropower),&lt;br /&gt;
|Hydromorphological quality elements=Continuity for organisms, Continuity of sediment transport, Quantity &amp;amp; dynamics of flow,&lt;br /&gt;
|Biological quality elements=Fish,&lt;br /&gt;
}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Case study monitoring documents&lt;br /&gt;
|Monitoring document=Irekibai InformeLayman cas def.pdf&lt;br /&gt;
}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=https://www.irekibai.eu/&lt;br /&gt;
|Description=European LIFE proyect&lt;br /&gt;
}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=https://vimeo.com/192600424&lt;br /&gt;
|Description=Time-lapse Dam removal&lt;br /&gt;
}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;br /&gt;
{{Toggle content end}}&lt;/div&gt;</summary>
		<author><name>PeGon</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48045</id>
		<title>Case study:Bidasoa Dam removal 2</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48045"/>
		<updated>2021-05-24T21:30:45Z</updated>

		<summary type="html">&lt;p&gt;PeGon: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=43.2808504, -1.6830042&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Environmental flows and water resources, Habitat and biodiversity, Hydromorphology&lt;br /&gt;
|Country=Spain&lt;br /&gt;
|Main contact forename=Maria Eugenia&lt;br /&gt;
|Main contact surname=Hernando&lt;br /&gt;
|Contact organisation=Servicio de Biodiversidad. Departamento de Desarrollo Rural y Medio Ambiente de Navarra&lt;br /&gt;
|Contact organisation url=https://www.navarra.es/home_es/Temas/Medio+Ambiente/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project summary=The demolition of the San Martín or Bera Dam, 2.85 m high and 102.84 meters long, was carried out. It is the third obstacle in the Bidasoa River from the sea. The works begin on 08/29/2016 and conclude on 10/4/2016 The following actions were carried out during the works: &lt;br /&gt;
• Access to the work, cofferdams and conditions. Clearing and clearing of vegetation&lt;br /&gt;
• Demolition of the structures (weir and plant intake) and in situ valorization of the materials as fill.&lt;br /&gt;
• Regularizing and conserving the gravels of the riverbed.&lt;br /&gt;
• Repair of accesses and revegetation of the affected areas&lt;br /&gt;
|Project title=Bidasoa Dam removal&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Bera.JPG&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Irekibai presab 1473174055.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Toggle button}}&lt;br /&gt;
{{Toggle content start}}&lt;br /&gt;
{{Case study subcatchment}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Vera de Bidasoa&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Local site designation=Bidasoa&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Species=Salmon, tarpon, lamprey and burtaine&lt;br /&gt;
|River corridor land use=Plantation forestry, Urban,&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=1500&lt;br /&gt;
|Works started=2016/08/29&lt;br /&gt;
|Project completed=2016/10/04&lt;br /&gt;
|Total cost category=more than 10000 k€&lt;br /&gt;
|Funding sources=EU LIFE Programme, Government of Navarra,&lt;br /&gt;
|Works1 and supervision cost category=more than 10000 k€&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Barriers to fish migration, Impoundments (not hydropower),&lt;br /&gt;
|Hydromorphological quality elements=Continuity for organisms, Continuity of sediment transport, Quantity &amp;amp; dynamics of flow,&lt;br /&gt;
|Biological quality elements=Fish,&lt;br /&gt;
}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Case study monitoring documents&lt;br /&gt;
|Monitoring document=Irekibai InformeLayman cas def.pdf&lt;br /&gt;
}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;br /&gt;
{{Toggle content end}}&lt;/div&gt;</summary>
		<author><name>PeGon</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:Irekibai_InformeLayman_cas_def.pdf&amp;diff=48044</id>
		<title>File:Irekibai InformeLayman cas def.pdf</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:Irekibai_InformeLayman_cas_def.pdf&amp;diff=48044"/>
		<updated>2021-05-24T21:30:37Z</updated>

		<summary type="html">&lt;p&gt;PeGon: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>PeGon</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48043</id>
		<title>Case study:Bidasoa Dam removal 2</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48043"/>
		<updated>2021-05-24T21:28:01Z</updated>

		<summary type="html">&lt;p&gt;PeGon: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=43.2808504, -1.6830042&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Environmental flows and water resources, Habitat and biodiversity, Hydromorphology&lt;br /&gt;
|Country=Spain&lt;br /&gt;
|Main contact forename=Maria Eugenia&lt;br /&gt;
|Main contact surname=Hernando&lt;br /&gt;
|Contact organisation=Servicio de Biodiversidad. Departamento de Desarrollo Rural y Medio Ambiente de Navarra&lt;br /&gt;
|Contact organisation url=https://www.navarra.es/home_es/Temas/Medio+Ambiente/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project summary=The demolition of the San Martín or Bera Dam, 2.85 m high and 102.84 meters long, was carried out. It is the third obstacle in the Bidasoa River from the sea. The works begin on 08/29/2016 and conclude on 10/4/2016 The following actions were carried out during the works: &lt;br /&gt;
• Access to the work, cofferdams and conditions. Clearing and clearing of vegetation&lt;br /&gt;
• Demolition of the structures (weir and plant intake) and in situ valorization of the materials as fill.&lt;br /&gt;
• Regularizing and conserving the gravels of the riverbed.&lt;br /&gt;
• Repair of accesses and revegetation of the affected areas&lt;br /&gt;
|Project title=Bidasoa Dam removal&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Bera.JPG&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Irekibai presab 1473174055.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Toggle button}}&lt;br /&gt;
{{Toggle content start}}&lt;br /&gt;
{{Case study subcatchment}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Vera de Bidasoa&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Local site designation=Bidasoa&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Species=Salmon, tarpon, lamprey and burtaine&lt;br /&gt;
|River corridor land use=Plantation forestry, Urban,&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=1500&lt;br /&gt;
|Works started=2016/08/29&lt;br /&gt;
|Project completed=2016/10/04&lt;br /&gt;
|Total cost category=more than 10000 k€&lt;br /&gt;
|Funding sources=EU LIFE Programme, Government of Navarra,&lt;br /&gt;
|Works1 and supervision cost category=more than 10000 k€&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Barriers to fish migration, Impoundments (not hydropower),&lt;br /&gt;
|Hydromorphological quality elements=Continuity for organisms, Continuity of sediment transport, Quantity &amp;amp; dynamics of flow,&lt;br /&gt;
|Biological quality elements=Fish,&lt;br /&gt;
}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;br /&gt;
{{Toggle content end}}&lt;/div&gt;</summary>
		<author><name>PeGon</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:Irekibai_presab_1473174055.jpg&amp;diff=48042</id>
		<title>File:Irekibai presab 1473174055.jpg</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:Irekibai_presab_1473174055.jpg&amp;diff=48042"/>
		<updated>2021-05-24T21:27:49Z</updated>

		<summary type="html">&lt;p&gt;PeGon: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>PeGon</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48041</id>
		<title>Case study:Bidasoa Dam removal 2</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48041"/>
		<updated>2021-05-24T21:24:36Z</updated>

		<summary type="html">&lt;p&gt;PeGon: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=43.2808504, -1.6830042&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Environmental flows and water resources, Habitat and biodiversity, Hydromorphology&lt;br /&gt;
|Country=Spain&lt;br /&gt;
|Main contact forename=Maria Eugenia&lt;br /&gt;
|Main contact surname=Hernando&lt;br /&gt;
|Contact organisation=Servicio de Biodiversidad. Departamento de Desarrollo Rural y Medio Ambiente de Navarra&lt;br /&gt;
|Contact organisation url=https://www.navarra.es/home_es/Temas/Medio+Ambiente/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project summary=The demolition of the San Martín or Bera Dam, 2.85 m high and 102.84 meters long, was carried out. It is the third obstacle in the Bidasoa River from the sea. The works begin on 08/29/2016 and conclude on 10/4/2016 The following actions were carried out during the works: &lt;br /&gt;
• Access to the work, cofferdams and conditions. Clearing and clearing of vegetation&lt;br /&gt;
• Demolition of the structures (weir and plant intake) and in situ valorization of the materials as fill.&lt;br /&gt;
• Regularizing and conserving the gravels of the riverbed.&lt;br /&gt;
• Repair of accesses and revegetation of the affected areas&lt;br /&gt;
|Project title=Bidasoa Dam removal&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Bera.JPG&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Toggle button}}&lt;br /&gt;
{{Toggle content start}}&lt;br /&gt;
{{Case study subcatchment}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Vera de Bidasoa&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Local site designation=Bidasoa&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Species=Salmon, tarpon, lamprey and burtaine&lt;br /&gt;
|River corridor land use=Plantation forestry, Urban,&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=1500&lt;br /&gt;
|Works started=2016/08/29&lt;br /&gt;
|Project completed=2016/10/04&lt;br /&gt;
|Total cost category=more than 10000 k€&lt;br /&gt;
|Funding sources=EU LIFE Programme, Government of Navarra,&lt;br /&gt;
|Works1 and supervision cost category=more than 10000 k€&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Barriers to fish migration, Impoundments (not hydropower),&lt;br /&gt;
|Hydromorphological quality elements=Continuity for organisms, Continuity of sediment transport, Quantity &amp;amp; dynamics of flow,&lt;br /&gt;
|Biological quality elements=Fish,&lt;br /&gt;
}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;br /&gt;
{{Toggle content end}}&lt;/div&gt;</summary>
		<author><name>PeGon</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:Bera.JPG&amp;diff=48040</id>
		<title>File:Bera.JPG</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:Bera.JPG&amp;diff=48040"/>
		<updated>2021-05-24T21:24:24Z</updated>

		<summary type="html">&lt;p&gt;PeGon: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>PeGon</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48039</id>
		<title>Case study:Bidasoa Dam removal 2</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48039"/>
		<updated>2021-05-24T21:22:32Z</updated>

		<summary type="html">&lt;p&gt;PeGon: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=43.2808504, -1.6830042&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Environmental flows and water resources, Habitat and biodiversity, Hydromorphology&lt;br /&gt;
|Country=Spain&lt;br /&gt;
|Main contact forename=Maria Eugenia&lt;br /&gt;
|Main contact surname=Hernando&lt;br /&gt;
|Contact organisation=Servicio de Biodiversidad. Departamento de Desarrollo Rural y Medio Ambiente de Navarra&lt;br /&gt;
|Contact organisation url=https://www.navarra.es/home_es/Temas/Medio+Ambiente/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project summary=The demolition of the San Martín or Bera Dam, 2.85 m high and 102.84 meters long, was carried out. It is the third obstacle in the Bidasoa River from the sea. The works begin on 08/29/2016 and conclude on 10/4/2016 The following actions were carried out during the works: &lt;br /&gt;
• Access to the work, cofferdams and conditions. Clearing and clearing of vegetation&lt;br /&gt;
• Demolition of the structures (weir and plant intake) and in situ valorization of the materials as fill.&lt;br /&gt;
• Regularizing and conserving the gravels of the riverbed.&lt;br /&gt;
• Repair of accesses and revegetation of the affected areas&lt;br /&gt;
|Project title=Bidasoa Dam removal&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Toggle button}}&lt;br /&gt;
{{Toggle content start}}&lt;br /&gt;
{{Case study subcatchment}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Vera de Bidasoa&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Local site designation=Bidasoa&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Species=Salmon, tarpon, lamprey and burtaine&lt;br /&gt;
|River corridor land use=Plantation forestry, Urban,&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=1500&lt;br /&gt;
|Works started=2016/08/29&lt;br /&gt;
|Project completed=2016/10/04&lt;br /&gt;
|Total cost category=more than 10000 k€&lt;br /&gt;
|Funding sources=EU LIFE Programme, Government of Navarra,&lt;br /&gt;
|Works1 and supervision cost category=more than 10000 k€&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Barriers to fish migration, Impoundments (not hydropower),&lt;br /&gt;
|Hydromorphological quality elements=Continuity for organisms, Continuity of sediment transport, Quantity &amp;amp; dynamics of flow,&lt;br /&gt;
|Biological quality elements=Fish,&lt;br /&gt;
}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;br /&gt;
{{Toggle content end}}&lt;/div&gt;</summary>
		<author><name>PeGon</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48038</id>
		<title>Case study:Bidasoa Dam removal 2</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48038"/>
		<updated>2021-05-24T21:14:34Z</updated>

		<summary type="html">&lt;p&gt;PeGon: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=43.2808504, -1.6830042&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Environmental flows and water resources, Habitat and biodiversity, Hydromorphology&lt;br /&gt;
|Country=Spain&lt;br /&gt;
|Main contact forename=Maria Eugenia&lt;br /&gt;
|Main contact surname=Hernando&lt;br /&gt;
|Contact organisation=Servicio de Biodiversidad. Departamento de Desarrollo Rural y Medio Ambiente de Navarra&lt;br /&gt;
|Contact organisation url=https://www.navarra.es/home_es/Temas/Medio+Ambiente/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project summary=The demolition of the San Martín or Bera Dam, 2.85 m high and 102.84 meters long, was carried out. It is the third obstacle in the Bidasoa River from the sea. The works begin on 08/29/2016 and conclude on 10/4/2016 The following actions were carried out during the works: &lt;br /&gt;
• Access to the work, cofferdams and conditions. Clearing and clearing of vegetation&lt;br /&gt;
• Demolition of the structures (weir and plant intake) and in situ valorization of the materials as fill.&lt;br /&gt;
• Regularizing and conserving the gravels of the riverbed.&lt;br /&gt;
• Repair of accesses and revegetation of the affected areas&lt;br /&gt;
|Project title=Bidasoa Dam removal&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Toggle button}}&lt;br /&gt;
{{Toggle content start}}&lt;br /&gt;
{{Case study subcatchment}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Vera de Bidasoa&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Local site designation=Bidasoa&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Species=Salmon, tarpon, lamprey and burtaine&lt;br /&gt;
|River corridor land use=Plantation forestry, Urban,&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=1500&lt;br /&gt;
|Works started=2016/08/29&lt;br /&gt;
|Project completed=2016/10/04&lt;br /&gt;
|Total cost category=more than 10000 k€&lt;br /&gt;
|Funding sources=EU LIFE Programme, Government of Navarra,&lt;br /&gt;
|Works1 and supervision cost category=more than 10000 k€&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;br /&gt;
{{Toggle content end}}&lt;/div&gt;</summary>
		<author><name>PeGon</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48037</id>
		<title>Case study:Bidasoa Dam removal 2</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48037"/>
		<updated>2021-05-24T21:13:19Z</updated>

		<summary type="html">&lt;p&gt;PeGon: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=43.2808504, -1.6830042&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Environmental flows and water resources, Habitat and biodiversity, Hydromorphology&lt;br /&gt;
|Country=Spain&lt;br /&gt;
|Main contact forename=Maria Eugenia&lt;br /&gt;
|Main contact surname=Hernando&lt;br /&gt;
|Contact organisation=Servicio de Biodiversidad. Departamento de Desarrollo Rural y Medio Ambiente de Navarra&lt;br /&gt;
|Contact organisation url=https://www.navarra.es/home_es/Temas/Medio+Ambiente/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project summary=The demolition of the San Martín or Bera Dam, 2.85 m high and 102.84 meters long, was carried out. It is the third obstacle in the Bidasoa River from the sea. The works begin on 08/29/2016 and conclude on 10/4/2016 The following actions were carried out during the works: &lt;br /&gt;
• Access to the work, cofferdams and conditions. Clearing and clearing of vegetation&lt;br /&gt;
• Demolition of the structures (weir and plant intake) and in situ valorization of the materials as fill.&lt;br /&gt;
• Regularizing and conserving the gravels of the riverbed.&lt;br /&gt;
• Repair of accesses and revegetation of the affected areas&lt;br /&gt;
|Project title=Bidasoa Dam removal&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Toggle button}}&lt;br /&gt;
{{Toggle content start}}&lt;br /&gt;
{{Case study subcatchment}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Vera de Bidasoa&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Local site designation=Bidasoa&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Species=Salmon, tarpon, lamprey and burtaine&lt;br /&gt;
|River corridor land use=Forestry and industrial, commercial and transport zone&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=1500&lt;br /&gt;
|Works started=2016/08/29&lt;br /&gt;
|Project completed=2016/10/04&lt;br /&gt;
|Total cost category=more than 10000 k€&lt;br /&gt;
|Funding sources=EU LIFE Programme, Government of Navarra,&lt;br /&gt;
|Works1 and supervision cost category=more than 10000 k€&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;br /&gt;
{{Toggle content end}}&lt;/div&gt;</summary>
		<author><name>PeGon</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48036</id>
		<title>Case study:Bidasoa Dam removal 2</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48036"/>
		<updated>2021-05-24T21:10:57Z</updated>

		<summary type="html">&lt;p&gt;PeGon: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=43.2808504, -1.6830042&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Environmental flows and water resources, Habitat and biodiversity, Hydromorphology&lt;br /&gt;
|Country=Spain&lt;br /&gt;
|Main contact forename=Maria Eugenia&lt;br /&gt;
|Main contact surname=Hernando&lt;br /&gt;
|Contact organisation=Servicio de Biodiversidad. Departamento de Desarrollo Rural y Medio Ambiente de Navarra&lt;br /&gt;
|Contact organisation url=https://www.navarra.es/home_es/Temas/Medio+Ambiente/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project summary=The demolition of the San Martín or Bera Dam, 2.85 m high and 102.84 meters long, was carried out. It is the third obstacle in the Bidasoa River from the sea. The works begin on 08/29/2016 and conclude on 10/4/2016 The following actions were carried out during the works: &lt;br /&gt;
• Access to the work, cofferdams and conditions. Clearing and clearing of vegetation&lt;br /&gt;
• Demolition of the structures (weir and plant intake) and in situ valorization of the materials as fill.&lt;br /&gt;
• Regularizing and conserving the gravels of the riverbed.&lt;br /&gt;
• Repair of accesses and revegetation of the affected areas&lt;br /&gt;
|Project title=Bidasoa Dam removal&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Toggle button}}&lt;br /&gt;
{{Toggle content start}}&lt;br /&gt;
{{Case study subcatchment}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Vera de Bidasoa&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Local site designation=Bidasoa&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Species=Salmon, tarpon, lamprey and burtaine&lt;br /&gt;
|River corridor land use=Forestry and industrial, commercial and transport zone&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=1500&lt;br /&gt;
|Project started=29/08/2016&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;br /&gt;
{{Toggle content end}}&lt;/div&gt;</summary>
		<author><name>PeGon</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48035</id>
		<title>Case study:Bidasoa Dam removal 2</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48035"/>
		<updated>2021-05-24T21:10:08Z</updated>

		<summary type="html">&lt;p&gt;PeGon: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=43.2808504, -1.6830042&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Environmental flows and water resources, Habitat and biodiversity, Hydromorphology&lt;br /&gt;
|Country=Spain&lt;br /&gt;
|Main contact forename=Maria Eugenia&lt;br /&gt;
|Main contact surname=Hernando&lt;br /&gt;
|Contact organisation=Servicio de Biodiversidad. Departamento de Desarrollo Rural y Medio Ambiente de Navarra&lt;br /&gt;
|Contact organisation url=https://www.navarra.es/home_es/Temas/Medio+Ambiente/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project summary=The demolition of the San Martín or Bera Dam, 2.85 m high and 102.84 meters long, was carried out. It is the third obstacle in the Bidasoa River from the sea. The works begin on 08/29/2016 and conclude on 10/4/2016 The following actions were carried out during the works: &lt;br /&gt;
• Access to the work, cofferdams and conditions. Clearing and clearing of vegetation&lt;br /&gt;
• Demolition of the structures (weir and plant intake) and in situ valorization of the materials as fill.&lt;br /&gt;
• Regularizing and conserving the gravels of the riverbed.&lt;br /&gt;
• Repair of accesses and revegetation of the affected areas&lt;br /&gt;
|Project title=Bidasoa Dam removal&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Toggle button}}&lt;br /&gt;
{{Toggle content start}}&lt;br /&gt;
{{Case study subcatchment}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Vera de Bidasoa&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Local site designation=Bidasoa&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Species=Salmon, tarpon, lamprey and burtaine&lt;br /&gt;
|River corridor land use=Forestry and industrial, commercial and transport zone&lt;br /&gt;
}}&lt;br /&gt;
{{Project background}}&lt;br /&gt;
{{Motivations}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;br /&gt;
{{Toggle content end}}&lt;/div&gt;</summary>
		<author><name>PeGon</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48034</id>
		<title>Case study:Bidasoa Dam removal 2</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48034"/>
		<updated>2021-05-24T21:07:10Z</updated>

		<summary type="html">&lt;p&gt;PeGon: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=43.2808504, -1.6830042&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Environmental flows and water resources, Habitat and biodiversity, Hydromorphology&lt;br /&gt;
|Country=Spain&lt;br /&gt;
|Main contact forename=Maria Eugenia&lt;br /&gt;
|Main contact surname=Hernando&lt;br /&gt;
|Contact organisation=Servicio de Biodiversidad. Departamento de Desarrollo Rural y Medio Ambiente de Navarra&lt;br /&gt;
|Contact organisation url=https://www.navarra.es/home_es/Temas/Medio+Ambiente/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project summary=The demolition of the San Martín or Bera Dam, 2.85 m high and 102.84 meters long, was carried out. It is the third obstacle in the Bidasoa River from the sea. The works begin on 08/29/2016 and conclude on 10/4/2016 The following actions were carried out during the works: &lt;br /&gt;
• Access to the work, cofferdams and conditions. Clearing and clearing of vegetation&lt;br /&gt;
• Demolition of the structures (weir and plant intake) and in situ valorization of the materials as fill.&lt;br /&gt;
• Regularizing and conserving the gravels of the riverbed.&lt;br /&gt;
• Repair of accesses and revegetation of the affected areas&lt;br /&gt;
|Project title=Bidasoa Dam removal&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Toggle button}}&lt;br /&gt;
{{Toggle content start}}&lt;br /&gt;
{{Case study subcatchment}}&lt;br /&gt;
{{Site}}&lt;br /&gt;
{{Project background}}&lt;br /&gt;
{{Motivations}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;br /&gt;
{{Toggle content end}}&lt;/div&gt;</summary>
		<author><name>PeGon</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48033</id>
		<title>Case study:Bidasoa Dam removal 2</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal_2&amp;diff=48033"/>
		<updated>2021-05-24T21:04:52Z</updated>

		<summary type="html">&lt;p&gt;PeGon: Created page with &amp;quot;{{Case study status |Approval status=Draft }} {{Location |Location=43.2808504, -1.6830042 }} {{Project overview |Project title=Bidasoa Dam removal |Status=Complete |Themes=Env...&amp;quot;&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=43.2808504, -1.6830042&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Project title=Bidasoa Dam removal&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Environmental flows and water resources, Habitat and biodiversity, Hydromorphology&lt;br /&gt;
|Country=Spain&lt;br /&gt;
|Main contact forename=Maria Eugenia&lt;br /&gt;
|Main contact surname=Hernando&lt;br /&gt;
|Contact organisation=Servicio de Biodiversidad. Departamento de Desarrollo Rural y Medio Ambiente de Navarra&lt;br /&gt;
|Contact organisation url=https://www.navarra.es/home_es/Temas/Medio+Ambiente/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Toggle button}}&lt;br /&gt;
{{Toggle content start}}&lt;br /&gt;
{{Case study subcatchment}}&lt;br /&gt;
{{Site}}&lt;br /&gt;
{{Project background}}&lt;br /&gt;
{{Motivations}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;br /&gt;
{{Toggle content end}}&lt;/div&gt;</summary>
		<author><name>PeGon</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal&amp;diff=48032</id>
		<title>Case study:Bidasoa Dam removal</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Bidasoa_Dam_removal&amp;diff=48032"/>
		<updated>2021-05-24T21:03:35Z</updated>

		<summary type="html">&lt;p&gt;PeGon: Created page with &amp;quot;{{Case study status |Approval status=Draft }} {{Location}} {{Project overview |Project title=Bidasoa Dam removal |Status=Complete |Themes=Environmental flows and water resourc...&amp;quot;&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Project title=Bidasoa Dam removal&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Environmental flows and water resources, Habitat and biodiversity, Hydromorphology&lt;br /&gt;
|Country=Spain&lt;br /&gt;
|Main contact forename=Maria Eugenia&lt;br /&gt;
|Main contact surname=Hernando&lt;br /&gt;
|Contact organisation=Servicio de Biodiversidad. Departamento de Desarrollo Rural y Medio Ambiente de Navarra&lt;br /&gt;
|Contact organisation url=https://www.navarra.es/home_es/Temas/Medio+Ambiente/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Toggle button}}&lt;br /&gt;
{{Toggle content start}}&lt;br /&gt;
{{Case study subcatchment}}&lt;br /&gt;
{{Site}}&lt;br /&gt;
{{Project background}}&lt;br /&gt;
{{Motivations}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;br /&gt;
{{Toggle content end}}&lt;/div&gt;</summary>
		<author><name>PeGon</name></author>
	</entry>
</feed>