<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://restorerivers.eu/wiki/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Nivedita+Mahida</id>
	<title>RESTORE - User contributions [en]</title>
	<link rel="self" type="application/atom+xml" href="https://restorerivers.eu/wiki/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Nivedita+Mahida"/>
	<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Special:Contributions/Nivedita_Mahida"/>
	<updated>2026-04-08T15:23:54Z</updated>
	<subtitle>User contributions</subtitle>
	<generator>MediaWiki 1.39.7</generator>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=11749</id>
		<title>Case study:Isar-Plan</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=11749"/>
		<updated>2013-08-08T15:18:16Z</updated>

		<summary type="html">&lt;p&gt;Nivedita Mahida: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Approved&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=48.127801652017084, 11.578259468078613&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Project web site url=www.wwa-m.bayern.de/projekte_und_programme/isarplan/index.htm&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Hydropower, Hydromorphology, Land use management - forestry, Monitoring, Social benefits, Spatial planning, Water quality&lt;br /&gt;
|Country=Germany&lt;br /&gt;
|Main contact forename=Nick&lt;br /&gt;
|Main contact surname=Elbourne&lt;br /&gt;
|Main contact id=NickRRC&lt;br /&gt;
|Contact organisation=State Office for Water Management Munich&lt;br /&gt;
|Contact organisation url=www.wwa-m.bayern.de/index.htm&lt;br /&gt;
|Partner organisations=City of Munich&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Before-After Isar.png&lt;br /&gt;
|Picture description=Straightened Isar (left) and restored diversified channel (Right)&lt;br /&gt;
|Project summary=The Isar Plan Project is a river restoration project on a stretch of 8Km in the inner city of Munich. The Project was initiated in 2000 and the last site was completed by 2011. The three main goals of the project were:&lt;br /&gt;
1) Flood protection&lt;br /&gt;
2) Enhancing Species diversity and ecological restoration&lt;br /&gt;
3) Improving leisure and recreation&lt;br /&gt;
&lt;br /&gt;
The project is being currently monitored.&lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_subcatchment&lt;br /&gt;
|Subcatchment=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Isar&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Munich&lt;br /&gt;
|WFD water body code=DE16_147237_173317&lt;br /&gt;
|WFD (national) typology=Type 4 &amp;quot;gravel and stone embossed flow of the Alpine foothills&amp;quot;&lt;br /&gt;
|Pre-project morphology=Straight,Revetments,Embanked,Impounded&lt;br /&gt;
|Reference morphology=Braided,High width:depth&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Site designation=Germany - Landschaftschutzgebiet&lt;br /&gt;
|Local site designation=Landschaftsschutzgebiet/ Naturschutzgebiet&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Species=European green toad (Bufo viridis), little ringed plover (Charadrius dubius), Fish:  huchen (Hucho hucho), nase (Chondrostoma nasus), grayling (Thymallus thymallus), burbot (Lota lota), brown trout (Salmo trutta), barbel (Barbus barbus) and chub (Leuciscus cephalus). Flora.rock roses (Helianthemum spp.), broomrapes (Orobanche spp.), meadow clary (Salvia pratensis), quaking grass (Briza media) and the Carthusian pink crocus (Dianthus carthusianorum) Butterflies:Idas blue (Plebejus idas) and common blue (Polyommatus icarus)&lt;br /&gt;
|Dominant hydrology=Quick and varying run-off&lt;br /&gt;
|Dominant substrate=Gravel- largely limestone&lt;br /&gt;
|River corridor land use=Urban, Forest, Flood plains&lt;br /&gt;
|Average bankfull channel width category=more than 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mean discharge category=10 - 100 m³/s&lt;br /&gt;
|Mn discharge=63.7&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=8000 m&lt;br /&gt;
|Project started=1998/01/01&lt;br /&gt;
|Works completed=2011/08/31&lt;br /&gt;
|Total cost category=more than 10000 k€&lt;br /&gt;
|Total1 cost=35000€&lt;br /&gt;
|Funding sources=City of Munich,Free state of Bavaria&lt;br /&gt;
|Investigation and design cost category=more than 10000 k€&lt;br /&gt;
|Investigation and design Lead organisation=State Office for Water Management Munich&lt;br /&gt;
|Investigation and design Other contact forename=Matthias&lt;br /&gt;
|Investigation and design Other contact surname=Junge&lt;br /&gt;
|Stakeholder1 engagement cost category=more than 10000 k€&lt;br /&gt;
|Stakeholder engagement Lead organisation=City of  Munich&lt;br /&gt;
|Stakeholder engagement Other contact forename=Peter&lt;br /&gt;
|Stakeholder engagement Other contact surname=Schaller&lt;br /&gt;
|Works1 and supervision cost category=more than 10000 k€&lt;br /&gt;
|Works and supervision Lead organisation=State Office for Water Management Munich&lt;br /&gt;
|Works and supervision Other contact forename=Stefan&lt;br /&gt;
|Works and supervision Other contact surname=Kirner&lt;br /&gt;
|Post-project1 management and maintenance cost category=more than 10000 k€&lt;br /&gt;
|Post-project management and maintenance Lead organisation=State Office for Water Management &amp;amp; City of Munich&lt;br /&gt;
|Monitoring1 cost category=more than 10000 k€&lt;br /&gt;
|Monitoring Lead organisation=State Office for Water Management&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Riparian development&lt;br /&gt;
|Hydromorphological quality elements=Structure &amp;amp; condition of riparian zones,Continuity of sediment transport, Quantity &amp;amp; dynamics of flow,&lt;br /&gt;
|Biological quality elements=Fish: Abundance, Habitats, Invertebrates: Disturbance-sensitive species,&lt;br /&gt;
|Physico-chemical quality elements=Bathing water quality&lt;br /&gt;
|Other motivation=Improvement of Flood Protection, Landscape enhancement,Recreation&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=Gravel banks reintroduced,Re-grading of banks,Removal of concrete bank protection at several sites, widening of river bed, deepening of river floor&lt;br /&gt;
|Floodplain / River corridor=Large scale planting of native species,Widening of flood corridor&lt;br /&gt;
|Planform / Channel pattern=Channel widening,Creation of willow island,Creation of braided channel, Allow future natural channel changes to occur, &lt;br /&gt;
|Other technical measure=embedding of rootballs and tree trunks, creation of new bicycle path, natural seating stones places on banks&lt;br /&gt;
|Management interventions=Waste management, provision of temporary toilet facilities&lt;br /&gt;
|Social measures=information for the public&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Continuity of sediment transport&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Public use&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image_gallery}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional_links_and_references_header}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Nivedita Mahida</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Subcatchment:Isar&amp;diff=11748</id>
		<title>Subcatchment:Isar</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Subcatchment:Isar&amp;diff=11748"/>
		<updated>2013-08-08T15:16:46Z</updated>

		<summary type="html">&lt;p&gt;Nivedita Mahida: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Catchment and subcatchment&lt;br /&gt;
|River basin district=Danube&lt;br /&gt;
|Rvr basin=Isar&lt;br /&gt;
|River name=Isar&lt;br /&gt;
|Area category=1000 - 10000 km²&lt;br /&gt;
|Area exact=9000&lt;br /&gt;
|Maximum altitude category=1000 - 2000 m&lt;br /&gt;
|Subcatchment dominant geology=Siliceous&lt;br /&gt;
|Ecoregion=Central Highlands&lt;br /&gt;
|Subcatchment dominant land cover=Alluvial Forest Vegetation&lt;br /&gt;
}}&lt;/div&gt;</summary>
		<author><name>Nivedita Mahida</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Subcatchment:Isar&amp;diff=7376</id>
		<title>Subcatchment:Isar</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Subcatchment:Isar&amp;diff=7376"/>
		<updated>2012-12-14T15:55:52Z</updated>

		<summary type="html">&lt;p&gt;Nivedita Mahida: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Catchment and subcatchment&lt;br /&gt;
|River basin district=Danube&lt;br /&gt;
|Rvr basin=Isar&lt;br /&gt;
|River name=Isar&lt;br /&gt;
|Area category=1000 - 10000 km²&lt;br /&gt;
|Area exact=9000&lt;br /&gt;
|Maximum altitude category=1000 - 2000 m&lt;br /&gt;
|Subcatchment dominant geology=Siliceous&lt;br /&gt;
|Ecoregion=Central Highlands&lt;br /&gt;
|Subcatchment dominant land cover=Forest Vegetation&lt;br /&gt;
}}&lt;/div&gt;</summary>
		<author><name>Nivedita Mahida</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7375</id>
		<title>Case study:Isar-Plan</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7375"/>
		<updated>2012-12-14T15:53:34Z</updated>

		<summary type="html">&lt;p&gt;Nivedita Mahida: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Approved&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=48.127801652017084, 11.578259468078613&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Project web site url=www.wwa-m.bayern.de/projekte_und_programme/isarplan/index.htm&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Hydropower, Hydromorphology, Land use management - forestry, Monitoring, Social benefits, Spatial planning, Water quality&lt;br /&gt;
|Country=Germany&lt;br /&gt;
|Main contact forename=Nick&lt;br /&gt;
|Main contact surname=Elbourne&lt;br /&gt;
|Main contact id=NickRRC&lt;br /&gt;
|Contact organisation=State Office for Water Management Munich&lt;br /&gt;
|Contact organisation url=www.wwa-m.bayern.de/index.htm&lt;br /&gt;
|Partner organisations=City of Munich&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Before-After Isar.png&lt;br /&gt;
|Picture description=Straightened Isar (left) and restored diversified channel (Right)&lt;br /&gt;
|Project summary=The Isar Plan Project is a river restoration project on a stretch of 8Km in the inner city of Munich. The Project was initiated in 2000 and the last site was completed by 2011. The three main goals of the project were:&lt;br /&gt;
1) Flood protection&lt;br /&gt;
2) Enhancing Species diversity and ecological restoration&lt;br /&gt;
3) Improving leisure and recreation&lt;br /&gt;
&lt;br /&gt;
The project is being currently monitored.&lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_subcatchment&lt;br /&gt;
|Subcatchment=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Isar&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Munich&lt;br /&gt;
|WFD water body code=DE16_147237_173317&lt;br /&gt;
|WFD (national) typology=Type 4 &amp;quot;gravel and stone embossed flow of the Alpine foothills&amp;quot;&lt;br /&gt;
|Pre-project morphology=Straight,Revetments,Embanked,Impounded&lt;br /&gt;
|Reference morphology=Braided,High width:depth&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Site designation=Germany - Landschaftschutzgebiet&lt;br /&gt;
|Local site designation=Hochwasserwiesen&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Species=European green toad (Bufo viridis), little ringed plover (Charadrius dubius), Fish:  huchen (Hucho hucho), nase (Chondrostoma nasus), grayling (Thymallus thymallus), burbot (Lota lota), brown trout (Salmo trutta), barbel (Barbus barbus) and chub (Leuciscus cephalus). Flora.rock roses (Helianthemum spp.), broomrapes (Orobanche spp.), meadow clary (Salvia pratensis), quaking grass (Briza media) and the Carthusian pink crocus (Dianthus carthusianorum) Butterflies:Idas blue (Plebejus idas) and common blue (Polyommatus icarus)&lt;br /&gt;
|Dominant hydrology=Quick and varying run-off&lt;br /&gt;
|Dominant substrate=Gravel- largely limestone&lt;br /&gt;
|River corridor land use=Urban &amp;amp; Forest&lt;br /&gt;
|Average bankfull channel width category=more than 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mean discharge category=10 - 100 m³/s&lt;br /&gt;
|Mn discharge=63.7&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=8000 m&lt;br /&gt;
|Project started=1998/01/01&lt;br /&gt;
|Works completed=2011/08/31&lt;br /&gt;
|Total cost category=more than 10000 k€&lt;br /&gt;
|Total1 cost=35000€&lt;br /&gt;
|Funding sources=City of Munich,Free state of Bavaria&lt;br /&gt;
|Investigation and design cost category=more than 10000 k€&lt;br /&gt;
|Investigation and design Lead organisation=State Office for Water Management Munich&lt;br /&gt;
|Investigation and design Other contact forename=Matthias&lt;br /&gt;
|Investigation and design Other contact surname=Junge&lt;br /&gt;
|Stakeholder1 engagement cost category=more than 10000 k€&lt;br /&gt;
|Stakeholder engagement Lead organisation=City of  Munich&lt;br /&gt;
|Stakeholder engagement Other contact forename=Peter&lt;br /&gt;
|Stakeholder engagement Other contact surname=Schaller&lt;br /&gt;
|Works1 and supervision cost category=more than 10000 k€&lt;br /&gt;
|Works and supervision Lead organisation=State Office for Water Management Munich&lt;br /&gt;
|Works and supervision Other contact forename=Stefan&lt;br /&gt;
|Works and supervision Other contact surname=Kirner&lt;br /&gt;
|Post-project1 management and maintenance cost category=more than 10000 k€&lt;br /&gt;
|Post-project management and maintenance Lead organisation=State Office for Water Management &amp;amp; City of Munich&lt;br /&gt;
|Monitoring1 cost category=more than 10000 k€&lt;br /&gt;
|Monitoring Lead organisation=State Office for Water Management&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Riparian development&lt;br /&gt;
|Hydromorphological quality elements=Structure &amp;amp; condition of riparian zones,Continuity of sediment transport, Quantity &amp;amp; dynamics of flow,&lt;br /&gt;
|Biological quality elements=Fish: Abundance, Habitats, Invertebrates: Disturbance-sensitive species,&lt;br /&gt;
|Physico-chemical quality elements=Bathing water quality&lt;br /&gt;
|Other motivation=Improvement of Flood Protection, Landscape enhancement,Recreation&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=Gravel banks reintroduced,Re-grading of banks,Removal of concrete bank protection at several sites, widening of river bed, deepening of river floor&lt;br /&gt;
|Floodplain / River corridor=Large scale planting of native species,Widening of flood corridor&lt;br /&gt;
|Planform / Channel pattern=Channel widening,Creation of willow island,Creation of braided channel, Allow future natural channel changes to occur, &lt;br /&gt;
|Other technical measure=embedding of rootballs and tree trunks, creation of new bicycle path, natural seating stones places on banks&lt;br /&gt;
|Management interventions=Waste management, provision of temporary toilet facilities&lt;br /&gt;
|Social measures=information for the public&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Continuity of sediment transport&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Public use&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image_gallery}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional_links_and_references_header}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Nivedita Mahida</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7359</id>
		<title>Case study:Isar-Plan</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7359"/>
		<updated>2012-12-14T13:04:13Z</updated>

		<summary type="html">&lt;p&gt;Nivedita Mahida: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Approved&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=48.127801652017084, 11.578259468078613&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Project web site url=www.wwa-m.bayern.de/projekte_und_programme/isarplan/index.htm&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Hydropower, Hydromorphology, Land use management - forestry, Monitoring, Social benefits, Spatial planning, Water quality&lt;br /&gt;
|Country=Germany&lt;br /&gt;
|Main contact forename=Nick&lt;br /&gt;
|Main contact surname=Elbourne&lt;br /&gt;
|Main contact id=NickRRC&lt;br /&gt;
|Contact organisation=State Office for Water Management Munich&lt;br /&gt;
|Contact organisation url=www.wwa-m.bayern.de/index.htm&lt;br /&gt;
|Partner organisations=City of Munich&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Before-After Isar.png&lt;br /&gt;
|Picture description=Straightened Isar (left) and restored diversified channel (Right)&lt;br /&gt;
|Project summary=The Isar Plan Project is a river restoration project on a stretch of 8Km in the inner city of Munich. The Project was initiated in 2000 and the last site was completed by 2011. The three main goals of the project were:&lt;br /&gt;
1) Flood protection&lt;br /&gt;
2) Enhancing Species diversity and ecological restoration&lt;br /&gt;
3) Improving leisure and recreation&lt;br /&gt;
&lt;br /&gt;
The project is being currently monitored.&lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_subcatchment&lt;br /&gt;
|Subcatchment=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Isar&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Munich&lt;br /&gt;
|WFD water body code=DE16_147237_173317&lt;br /&gt;
|WFD (national) typology=Type 4 &amp;quot;gravel and stone embossed flow of the Alpine foothills&amp;quot;&lt;br /&gt;
|Pre-project morphology=Straight,Revetments,Embanked,Impounded&lt;br /&gt;
|Reference morphology=Braided,High width:depth&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Site designation=Germany - Landschaftschutzgebiet&lt;br /&gt;
|Local site designation=Hochwasserwiesen&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Species=European green toad (Bufo viridis), little ringed plover (Charadrius dubius), Fish:  huchen (Hucho hucho), nase (Chondrostoma nasus), grayling (Thymallus thymallus), burbot (Lota lota), brown trout (Salmo trutta), barbel (Barbus barbus) and chub (Leuciscus cephalus). Flora.rock roses (Helianthemum spp.), broomrapes (Orobanche spp.), meadow clary (Salvia pratensis), quaking grass (Briza media) and the Carthusian pink crocus (Dianthus carthusianorum) Butterflies:Idas blue (Plebejus idas) and common blue (Polyommatus icarus) &lt;br /&gt;
|Dominant hydrology=Quick and varying run-off&lt;br /&gt;
|Dominant substrate=Gravel- largely limestone&lt;br /&gt;
|River corridor land use=Urban &amp;amp; Forest&lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=8000 m&lt;br /&gt;
|Project started=1998/01/01&lt;br /&gt;
|Works completed=2011/08/31&lt;br /&gt;
|Total cost category=more than 10000 k€&lt;br /&gt;
|Total1 cost=35000€&lt;br /&gt;
|Funding sources=City of Munich,Free state of Bavaria&lt;br /&gt;
|Investigation and design cost category=more than 10000 k€&lt;br /&gt;
|Investigation and design Lead organisation=State Office for Water Management Munich&lt;br /&gt;
|Investigation and design Other contact forename=Matthias&lt;br /&gt;
|Investigation and design Other contact surname=Junge&lt;br /&gt;
|Stakeholder1 engagement cost category=more than 10000 k€&lt;br /&gt;
|Stakeholder engagement Lead organisation=City of  Munich&lt;br /&gt;
|Stakeholder engagement Other contact forename=Peter&lt;br /&gt;
|Stakeholder engagement Other contact surname=Schaller&lt;br /&gt;
|Works1 and supervision cost category=more than 10000 k€&lt;br /&gt;
|Works and supervision Lead organisation=State Office for Water Management Munich&lt;br /&gt;
|Works and supervision Other contact forename=Stefan&lt;br /&gt;
|Works and supervision Other contact surname=Kirner&lt;br /&gt;
|Post-project1 management and maintenance cost category=more than 10000 k€&lt;br /&gt;
|Post-project management and maintenance Lead organisation=State Office for Water Management &amp;amp; City of Munich&lt;br /&gt;
|Monitoring1 cost category=more than 10000 k€&lt;br /&gt;
|Monitoring Lead organisation=State Office for Water Management&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Riparian development&lt;br /&gt;
|Hydromorphological quality elements=Structure &amp;amp; condition of riparian zones,Continuity of sediment transport, Quantity &amp;amp; dynamics of flow,&lt;br /&gt;
|Biological quality elements=Fish: Abundance, Habitats, Invertebrates: Disturbance-sensitive species,&lt;br /&gt;
|Physico-chemical quality elements=Bathing water quality&lt;br /&gt;
|Other motivation=Improvement of Flood Protection, Landscape enhancement,Recreation&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=Gravel banks reintroduced,Re-grading of banks,Removal of concrete bank protection at several sites, widening of river bed, deepening of river floor&lt;br /&gt;
|Floodplain / River corridor=Large scale planting of native species,Widening of flood corridor&lt;br /&gt;
|Planform / Channel pattern=Channel widening,Creation of willow island,Creation of braided channel, Allow future natural channel changes to occur, &lt;br /&gt;
|Other technical measure=embedding of rootballs and tree trunks, creation of new bicycle path, natural seating stones places on banks&lt;br /&gt;
|Management interventions=Waste management, provision of temporary toilet facilities&lt;br /&gt;
|Social measures=information for the public&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Continuity of sediment transport&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Public use&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image_gallery}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional_links_and_references_header}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Nivedita Mahida</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7358</id>
		<title>Case study:Isar-Plan</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7358"/>
		<updated>2012-12-14T12:34:11Z</updated>

		<summary type="html">&lt;p&gt;Nivedita Mahida: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Approved&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=48.127801652017084, 11.578259468078613&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Project web site url=www.wwa-m.bayern.de/projekte_und_programme/isarplan/index.htm&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Hydropower, Hydromorphology, Land use management - forestry, Monitoring, Social benefits, Spatial planning, Water quality&lt;br /&gt;
|Country=Germany&lt;br /&gt;
|Main contact forename=Nick&lt;br /&gt;
|Main contact surname=Elbourne&lt;br /&gt;
|Main contact id=NickRRC&lt;br /&gt;
|Contact organisation=State Office for Water Management Munich&lt;br /&gt;
|Contact organisation url=www.wwa-m.bayern.de/index.htm&lt;br /&gt;
|Partner organisations=City of Munich&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Before-After Isar.png&lt;br /&gt;
|Picture description=Straightened Isar (left) and restored diversified channel (Right)&lt;br /&gt;
|Project summary=The Isar Plan Project is a river restoration project on a stretch of 8Km in the inner city of Munich. The Project was initiated in 2000 and the last site was completed by 2011. The three main goals of the project were:&lt;br /&gt;
1) Flood protection&lt;br /&gt;
2) Enhancing Species diversity and ecological restoration&lt;br /&gt;
3) Improving leisure and recreation&lt;br /&gt;
&lt;br /&gt;
The project is being currently monitored.&lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_subcatchment&lt;br /&gt;
|Subcatchment=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Isar&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Munich&lt;br /&gt;
|WFD water body code=DE16_147237_173317&lt;br /&gt;
|WFD (national) typology=Type 4 &amp;quot;gravel and stone embossed flow of the Alpine foothills&amp;quot;&lt;br /&gt;
|Pre-project morphology=Straight,Revetments,Embanked,Impounded&lt;br /&gt;
|Reference morphology=Braided,High width:depth&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Site designation=Germany - Landschaftschutzgebiet&lt;br /&gt;
|Local site designation=Hochwasserwiesen&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Species=European green toad (Bufo viridis), little ringed plover (Charadrius dubius), Fish:  huchen (Hucho hucho), nase (Chondrostoma nasus), grayling (Thymallus thymallus), burbot (Lota lota), brown trout (Salmo trutta), barbel (Barbus barbus) and chub (Leuciscus cephalus). Flora.rock roses (Helianthemum spp.), broomrapes (Orobanche spp.), meadow clary (Salvia pratensis), quaking grass (Briza media) and the Carthusian pink crocus (Dianthus carthusianorum) Butterflies:Idas blue (Plebejus idas) and common blue (Polyommatus icarus) &lt;br /&gt;
|Dominant hydrology=Quick and varying run-off&lt;br /&gt;
|Dominant substrate=Gravel- largely limestone&lt;br /&gt;
|River corridor land use=Urban &amp;amp; Forest&lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=8000 m&lt;br /&gt;
|Project started=1998/01/01&lt;br /&gt;
|Works completed=2011/08/31&lt;br /&gt;
|Total cost category=more than 10000 k€&lt;br /&gt;
|Total1 cost=35000€&lt;br /&gt;
|Funding sources=City of Munich,Free state of Bavaria&lt;br /&gt;
|Investigation and design cost category=more than 10000 k€&lt;br /&gt;
|Investigation and design Lead organisation=State Office for Water Management Munich&lt;br /&gt;
|Investigation and design Other contact forename=Matthias&lt;br /&gt;
|Investigation and design Other contact surname=Junge&lt;br /&gt;
|Stakeholder1 engagement cost category=more than 10000 k€&lt;br /&gt;
|Stakeholder engagement Lead organisation=City of  Munich&lt;br /&gt;
|Stakeholder engagement Other contact forename=Peter&lt;br /&gt;
|Stakeholder engagement Other contact surname=Schaller&lt;br /&gt;
|Works1 and supervision cost category=more than 10000 k€&lt;br /&gt;
|Works and supervision Lead organisation=State Office for Water Management Munich&lt;br /&gt;
|Works and supervision Other contact forename=Stefan&lt;br /&gt;
|Works and supervision Other contact surname=Kirner&lt;br /&gt;
|Post-project1 management and maintenance cost category=more than 10000 k€&lt;br /&gt;
|Post-project management and maintenance Lead organisation=State Office for Water Management&lt;br /&gt;
|Monitoring1 cost category=more than 10000 k€&lt;br /&gt;
|Monitoring Lead organisation=State Office for Water Management&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Riparian development&lt;br /&gt;
|Hydromorphological quality elements=Structure &amp;amp; condition of riparian zones,Continuity of sediment transport, Quantity &amp;amp; dynamics of flow,&lt;br /&gt;
|Biological quality elements=Fish: Abundance, Habitats, Invertebrates: Disturbance-sensitive species,&lt;br /&gt;
|Physico-chemical quality elements=Bathing water quality&lt;br /&gt;
|Other motivation=Improvement of Flood Protection, Landscape enhancement,Recreation&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=Gravel banks reintroduced,Re-grading of banks,Removal of concrete bank protection at several sites, widening of river bed, deepening of river floor&lt;br /&gt;
|Floodplain / River corridor=Large scale planting of native species,Widening of flood corridor&lt;br /&gt;
|Planform / Channel pattern=Channel widening,Creation of willow island,Creation of braided channel, Allow future natural channel changes to occur, &lt;br /&gt;
|Other technical measure=embedding of rootballs and tree trunks, creation of new bicycle path, natural seating stones places on banks&lt;br /&gt;
|Management interventions=Waste management, provision of temporary toilet facilities&lt;br /&gt;
|Social measures=information for the public&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Continuity of sediment transport&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Public use&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image_gallery}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional_links_and_references_header}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Nivedita Mahida</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7357</id>
		<title>Case study:Isar-Plan</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7357"/>
		<updated>2012-12-14T12:13:38Z</updated>

		<summary type="html">&lt;p&gt;Nivedita Mahida: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Approved&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=48.127801652017084, 11.578259468078613&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Project web site url=www.wwa-m.bayern.de/projekte_und_programme/isarplan/index.htm&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Hydropower, Hydromorphology, Land use management - forestry, Monitoring, Social benefits, Spatial planning, Water quality&lt;br /&gt;
|Country=Germany&lt;br /&gt;
|Main contact forename=Nick&lt;br /&gt;
|Main contact surname=Elbourne&lt;br /&gt;
|Main contact id=NickRRC&lt;br /&gt;
|Contact organisation=State Office for Water Management Munich&lt;br /&gt;
|Contact organisation url=www.wwa-m.bayern.de/index.htm&lt;br /&gt;
|Partner organisations=City of Munich&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Before-After Isar.png&lt;br /&gt;
|Picture description=Straightened Isar (left) and restored diversified channel (Right)&lt;br /&gt;
|Project summary=The Isar Plan Project is a river restoration project on a stretch of 8Km in the inner city of Munich. The Project was initiated in 2000 and the last site was completed by 2011. The three main goals of the project were:&lt;br /&gt;
1) Flood protection&lt;br /&gt;
2) Enhancing Species diversity and ecological restoration&lt;br /&gt;
3) Improving leisure and recreation&lt;br /&gt;
&lt;br /&gt;
The project is being currently monitored.&lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_subcatchment&lt;br /&gt;
|Subcatchment=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Isar&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Munich&lt;br /&gt;
|WFD water body code=DE16_147237_173317&lt;br /&gt;
|WFD (national) typology=Type 4 &amp;quot;gravel and stone embossed flow of the Alpine foothills&amp;quot;&lt;br /&gt;
|Pre-project morphology=Straight,Revetments,Embanked,Impounded&lt;br /&gt;
|Reference morphology=Braided,High width:depth&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Site designation=Germany - Landschaftschutzgebiet&lt;br /&gt;
|Local site designation=Hochwasserwiesen&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Species=European green toad (Bufo viridis), little ringed plover (Charadrius dubius)&lt;br /&gt;
|Dominant hydrology=Quick and varying run-off&lt;br /&gt;
|Dominant substrate=Gravel- largely limestone&lt;br /&gt;
|River corridor land use=Urban &amp;amp; Forest&lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=8000 m&lt;br /&gt;
|Project started=1998/01/01&lt;br /&gt;
|Works completed=2011/08/31&lt;br /&gt;
|Total cost category=more than 10000 k€&lt;br /&gt;
|Total1 cost=35000€&lt;br /&gt;
|Funding sources=City of Munich,Free state of Bavaria&lt;br /&gt;
|Investigation and design cost category=more than 10000 k€&lt;br /&gt;
|Investigation and design Lead organisation=State Office for Water Management Munich&lt;br /&gt;
|Investigation and design Other contact forename=Matthias&lt;br /&gt;
|Investigation and design Other contact surname=Junge&lt;br /&gt;
|Stakeholder1 engagement cost category=more than 10000 k€&lt;br /&gt;
|Stakeholder engagement Lead organisation=City of  Munich&lt;br /&gt;
|Stakeholder engagement Other contact forename=Peter&lt;br /&gt;
|Stakeholder engagement Other contact surname=Schaller&lt;br /&gt;
|Works1 and supervision cost category=more than 10000 k€&lt;br /&gt;
|Works and supervision Lead organisation=State Office for Water Management Munich&lt;br /&gt;
|Works and supervision Other contact forename=Stefan&lt;br /&gt;
|Works and supervision Other contact surname=Kirner&lt;br /&gt;
|Post-project1 management and maintenance cost category=more than 10000 k€&lt;br /&gt;
|Post-project management and maintenance Lead organisation=State Office for Water Management&lt;br /&gt;
|Monitoring1 cost category=more than 10000 k€&lt;br /&gt;
|Monitoring Lead organisation=State Office for Water Management&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Riparian development&lt;br /&gt;
|Hydromorphological quality elements=Structure &amp;amp; condition of riparian zones,Continuity of sediment transport, Quantity &amp;amp; dynamics of flow,&lt;br /&gt;
|Biological quality elements=Fish: Abundance, Habitats, Invertebrates: Disturbance-sensitive species,&lt;br /&gt;
|Physico-chemical quality elements=Bathing water quality&lt;br /&gt;
|Other motivation=Improvement of Flood Protection, Landscape enhancement,Recreation&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=Gravel banks reintroduced,Re-grading of banks,Removal of concrete bank protection at several sites, widening of river bed, deepening of river floor&lt;br /&gt;
|Floodplain / River corridor=Large scale planting of native species,Widening of flood corridor&lt;br /&gt;
|Planform / Channel pattern=Channel widening,Creation of willow island,Creation of braided channel, Allow future natural channel changes to occur, &lt;br /&gt;
|Other technical measure=embedding of rootballs and tree trunks, creation of new bicycle path, natural seating stones places on banks&lt;br /&gt;
|Management interventions=Waste management, provision of temporary toilet facilities&lt;br /&gt;
|Social measures=information for the public&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Continuity of sediment transport&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Public use&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image_gallery}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional_links_and_references_header}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Nivedita Mahida</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7356</id>
		<title>Case study:Isar-Plan</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7356"/>
		<updated>2012-12-14T12:11:22Z</updated>

		<summary type="html">&lt;p&gt;Nivedita Mahida: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Approved&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=48.127801652017084, 11.578259468078613&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Project web site url=www.wwa-m.bayern.de/projekte_und_programme/isarplan/index.htm&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Hydropower, Hydromorphology, Land use management - forestry, Monitoring, Social benefits, Spatial planning, Water quality&lt;br /&gt;
|Country=Germany&lt;br /&gt;
|Main contact forename=Nick&lt;br /&gt;
|Main contact surname=Elbourne&lt;br /&gt;
|Main contact id=NickRRC&lt;br /&gt;
|Contact organisation=State Office for Water Management Munich&lt;br /&gt;
|Contact organisation url=www.wwa-m.bayern.de/index.htm&lt;br /&gt;
|Partner organisations=City of Munich&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Before-After Isar.png&lt;br /&gt;
|Picture description=Straightened Isar (left) and restored diversified channel (Right)&lt;br /&gt;
|Project summary=The Isar Plan Project is a river restoration project on a stretch of 8Km in the inner city of Munich. The Project was initiated in 2000 and the last site was completed by 2011. The three main goals of the project were:&lt;br /&gt;
1) Flood protection&lt;br /&gt;
2) Enhancing Species diversity and ecological restoration&lt;br /&gt;
3) Improving leisure and recreation&lt;br /&gt;
&lt;br /&gt;
The project is being currently monitored.&lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_subcatchment&lt;br /&gt;
|Subcatchment=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Isar&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Munich&lt;br /&gt;
|WFD water body code=DE16_147237_173317&lt;br /&gt;
|WFD (national) typology=Type 4 &amp;quot;gravel and stone embossed flow of the Alpine foothills&amp;quot;&lt;br /&gt;
|Pre-project morphology=Straight,Revetments,Embanked,Impounded&lt;br /&gt;
|Reference morphology=Braided,High width:depth&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Site designation=Germany - Landschaftschutzgebiet&lt;br /&gt;
|Local site designation=Hochwasserwiesen&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Species=European green toad (Bufo viridis), little ringed plover (Charadrius dubius)&lt;br /&gt;
|Dominant hydrology=Quick and varying run-off&lt;br /&gt;
|Dominant substrate=Gravel- largely limestone&lt;br /&gt;
|River corridor land use=Urban &amp;amp; Forest&lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=8000 m&lt;br /&gt;
|Project started=1998/01/01&lt;br /&gt;
|Works completed=2011/08/31&lt;br /&gt;
|Total cost category=more than 10000 k€&lt;br /&gt;
|Total1 cost=35000€&lt;br /&gt;
|Funding sources=City of Munich,Free state of Bavaria&lt;br /&gt;
|Investigation and design cost category=more than 10000 k€&lt;br /&gt;
|Investigation and design Lead organisation=State Office for Water Management Munich&lt;br /&gt;
|Investigation and design Other contact forename=Matthias&lt;br /&gt;
|Investigation and design Other contact surname=Junge&lt;br /&gt;
|Stakeholder1 engagement cost category=more than 10000 k€&lt;br /&gt;
|Stakeholder engagement Lead organisation=City of  Munich&lt;br /&gt;
|Stakeholder engagement Other contact forename=Peter&lt;br /&gt;
|Stakeholder engagement Other contact surname=Schaller&lt;br /&gt;
|Works1 and supervision cost category=more than 10000 k€&lt;br /&gt;
|Works and supervision Lead organisation=State Office for Water Management Munich&lt;br /&gt;
|Works and supervision Other contact forename=Stefan&lt;br /&gt;
|Works and supervision Other contact surname=Kirner&lt;br /&gt;
|Post-project1 management and maintenance cost category=more than 10000 k€&lt;br /&gt;
|Post-project management and maintenance Lead organisation=State Office for Water Management&lt;br /&gt;
|Monitoring1 cost category=more than 10000 k€&lt;br /&gt;
|Monitoring Lead organisation=State Office for Water Management&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Riparian development&lt;br /&gt;
|Hydromorphological quality elements=Structure &amp;amp; condition of riparian zones,Continuity of sediment transport, Quantity &amp;amp; dynamics of flow, &lt;br /&gt;
|Biological quality elements=Fish: Abundance, Habitats, Invertebrates: Disturbance-sensitive species, &lt;br /&gt;
|Other motivation=Improvement of Flood Protection, Landscape enhancement,Recreation&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=Gravel banks reintroduced,Re-grading of banks,Removal of concrete bank protection at several sites, widening of river bed, deepening of river floor&lt;br /&gt;
|Floodplain / River corridor=Large scale planting of native species,Widening of flood corridor&lt;br /&gt;
|Planform / Channel pattern=Channel widening,Creation of willow island,Creation of braided channel, Allow future natural channel changes to occur, &lt;br /&gt;
|Other technical measure=embedding of rootballs and tree trunks, creation of new bicycle path, natural seating stones places on banks&lt;br /&gt;
|Management interventions=Waste management, provision of temporary toilet facilities&lt;br /&gt;
|Social measures=information for the public&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Continuity of sediment transport&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Public use&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image_gallery}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional_links_and_references_header}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Nivedita Mahida</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7355</id>
		<title>Case study:Isar-Plan</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7355"/>
		<updated>2012-12-14T12:06:21Z</updated>

		<summary type="html">&lt;p&gt;Nivedita Mahida: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Approved&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=48.127801652017084, 11.578259468078613&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Project web site url=www.wwa-m.bayern.de/projekte_und_programme/isarplan/index.htm&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Hydropower, Hydromorphology, Land use management - forestry, Monitoring, Social benefits, Spatial planning, Water quality&lt;br /&gt;
|Country=Germany&lt;br /&gt;
|Main contact forename=Nick&lt;br /&gt;
|Main contact surname=Elbourne&lt;br /&gt;
|Main contact id=NickRRC&lt;br /&gt;
|Contact organisation=State Office for Water Management Munich&lt;br /&gt;
|Contact organisation url=www.wwa-m.bayern.de/index.htm&lt;br /&gt;
|Partner organisations=City of Munich&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Before-After Isar.png&lt;br /&gt;
|Picture description=Straightened Isar (left) and restored diversified channel (Right)&lt;br /&gt;
|Project summary=The Isar Plan Project is a river restoration project on a stretch of 8Km in the inner city of Munich. The Project was initiated in 2000 and the last site was completed by 2011. The three main goals of the project were:&lt;br /&gt;
1) Flood protection&lt;br /&gt;
2) Enhancing Species diversity and ecological restoration&lt;br /&gt;
3) Improving leisure and recreation&lt;br /&gt;
&lt;br /&gt;
The project is being currently monitored.&lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_subcatchment&lt;br /&gt;
|Subcatchment=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Isar&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Munich&lt;br /&gt;
|WFD water body code=DE16_147237_173317&lt;br /&gt;
|WFD (national) typology=Type 4 &amp;quot;gravel and stone embossed flow of the Alpine foothills&amp;quot;&lt;br /&gt;
|Pre-project morphology=Straight,Revetments,Embanked,Impounded&lt;br /&gt;
|Reference morphology=Braided,High width:depth&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Site designation=Germany - Landschaftschutzgebiet&lt;br /&gt;
|Local site designation=Hochwasserwiesen&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Species=European green toad (Bufo viridis), little ringed plover (Charadrius dubius)&lt;br /&gt;
|Dominant hydrology=Quick and varying run-off&lt;br /&gt;
|Dominant substrate=Gravel- largely limestone&lt;br /&gt;
|River corridor land use=Urban &amp;amp; Forest&lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=8000 m&lt;br /&gt;
|Project started=1998/01/01&lt;br /&gt;
|Works completed=2011/08/31&lt;br /&gt;
|Total cost category=more than 10000 k€&lt;br /&gt;
|Total1 cost=35000€&lt;br /&gt;
|Funding sources=City of Munich,Free state of Bavaria&lt;br /&gt;
|Investigation and design cost category=more than 10000 k€&lt;br /&gt;
|Investigation and design Lead organisation=State Office for Water Management Munich&lt;br /&gt;
|Investigation and design Other contact forename=Matthias&lt;br /&gt;
|Investigation and design Other contact surname=Junge&lt;br /&gt;
|Stakeholder1 engagement cost category=more than 10000 k€&lt;br /&gt;
|Stakeholder engagement Lead organisation=City of  Munich&lt;br /&gt;
|Stakeholder engagement Other contact forename=Peter&lt;br /&gt;
|Stakeholder engagement Other contact surname=Schaller&lt;br /&gt;
|Works1 and supervision cost category=more than 10000 k€&lt;br /&gt;
|Works and supervision Lead organisation=State Office for Water Management Munich&lt;br /&gt;
|Works and supervision Other contact forename=Stefan&lt;br /&gt;
|Works and supervision Other contact surname=Kirner&lt;br /&gt;
|Post-project1 management and maintenance cost category=more than 10000 k€&lt;br /&gt;
|Post-project management and maintenance Lead organisation=State Office for Water Management&lt;br /&gt;
|Monitoring1 cost category=more than 10000 k€&lt;br /&gt;
|Monitoring Lead organisation=State Office for Water Management&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Riparian development&lt;br /&gt;
|Hydromorphological quality elements=Structure &amp;amp; condition of riparian zones,Continuity of sediment transport, Quantity &amp;amp; dynamics of flow, &lt;br /&gt;
|Biological quality elements=Fish: Abundance, Habitats, Invertebrates: Disturbance-sensitive species, &lt;br /&gt;
|Other motivation=Improvement of Flood Protection, Landscape enhancement,Recreation&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Gravel banks introduced,Re-grading of banks,Removal of bank protection at several sites&lt;br /&gt;
|Floodplain / River corridor=&lt;br /&gt;
      Large scale planting,Widening of flood corridor&lt;br /&gt;
|Planform / Channel pattern=&lt;br /&gt;
      Channel widening,Creation of willow island,Creation of braided channel,Allow future natural channel changes to occur&lt;br /&gt;
|Other technical measure=&lt;br /&gt;
      &lt;br /&gt;
|Management interventions=&lt;br /&gt;
      &lt;br /&gt;
|Social measures=&lt;br /&gt;
      &lt;br /&gt;
|Wider stakeholder / citizen engagement=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Continuity of sediment transport&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Public use&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image_gallery}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional_links_and_references_header}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Nivedita Mahida</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7354</id>
		<title>Case study:Isar-Plan</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7354"/>
		<updated>2012-12-14T12:04:35Z</updated>

		<summary type="html">&lt;p&gt;Nivedita Mahida: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Approved&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=48.127801652017084, 11.578259468078613&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Project web site url=www.wwa-m.bayern.de/projekte_und_programme/isarplan/index.htm&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Hydropower, Hydromorphology, Land use management - forestry, Monitoring, Social benefits, Spatial planning, Water quality&lt;br /&gt;
|Country=Germany&lt;br /&gt;
|Main contact forename=Nick&lt;br /&gt;
|Main contact surname=Elbourne&lt;br /&gt;
|Main contact id=NickRRC&lt;br /&gt;
|Contact organisation=State Office for Water Management Munich&lt;br /&gt;
|Contact organisation url=www.wwa-m.bayern.de/index.htm&lt;br /&gt;
|Partner organisations=City of Munich&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Before-After Isar.png&lt;br /&gt;
|Picture description=Straightened Isar (left) and restored diversified channel (Right)&lt;br /&gt;
|Project summary=The Isar Plan Project is a river restoration project on a stretch of 8Km in the inner city of Munich. The Project was initiated in 2000 and the last site was completed by 2011. The three main goals of the project were:&lt;br /&gt;
1) Flood protection&lt;br /&gt;
2) Enhancing Species diversity and ecological restoration&lt;br /&gt;
3) Improving leisure and recreation&lt;br /&gt;
&lt;br /&gt;
The project is being currently monitored.&lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_subcatchment&lt;br /&gt;
|Subcatchment=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Isar&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Munich&lt;br /&gt;
|WFD water body code=DE16_147237_173317&lt;br /&gt;
|WFD (national) typology=Type 4 &amp;quot;gravel and stone embossed flow of the Alpine foothills&amp;quot;&lt;br /&gt;
|Pre-project morphology=Straight,Revetments,Embanked,Impounded&lt;br /&gt;
|Reference morphology=Braided,High width:depth&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Site designation=Germany - Landschaftschutzgebiet&lt;br /&gt;
|Local site designation=Hochwasserwiesen&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Species=European green toad (Bufo viridis), little ringed plover (Charadrius dubius)&lt;br /&gt;
|Dominant hydrology=Quick and varying run-off&lt;br /&gt;
|Dominant substrate=Gravel- largely limestone&lt;br /&gt;
|River corridor land use=Urban &amp;amp; Forest&lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=8000 m&lt;br /&gt;
|Project started=1998/01/01&lt;br /&gt;
|Works completed=2011/08/31&lt;br /&gt;
|Total cost category=more than 10000 k€&lt;br /&gt;
|Total1 cost=35000€&lt;br /&gt;
|Funding sources=City of Munich,Free state of Bavaria&lt;br /&gt;
|Investigation and design cost category=more than 10000 k€&lt;br /&gt;
|Investigation and design Lead organisation=State Office for Water Management Munich&lt;br /&gt;
|Investigation and design Other contact forename=Matthias&lt;br /&gt;
|Investigation and design Other contact surname=Junge&lt;br /&gt;
|Stakeholder1 engagement cost category=more than 10000 k€&lt;br /&gt;
|Stakeholder engagement Lead organisation=City of  Munich&lt;br /&gt;
|Stakeholder engagement Other contact forename=Peter&lt;br /&gt;
|Stakeholder engagement Other contact surname=Schaller&lt;br /&gt;
|Works1 and supervision cost category=more than 10000 k€&lt;br /&gt;
|Works and supervision Lead organisation=State Office for Water Management Munich&lt;br /&gt;
|Works and supervision Other contact forename=Stefan&lt;br /&gt;
|Works and supervision Other contact surname=Kirner&lt;br /&gt;
|Post-project1 management and maintenance cost category=more than 10000 k€&lt;br /&gt;
|Post-project management and maintenance Lead organisation=State Office for Water Management&lt;br /&gt;
|Monitoring1 cost category=more than 10000 k€&lt;br /&gt;
|Monitoring Lead organisation=State Office for Water Management&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones,Continuity of sediment transport&lt;br /&gt;
|Biological quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Physico-chemical quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Specific mitigation=&lt;br /&gt;
      Riparian development&lt;br /&gt;
|Other motivation=&lt;br /&gt;
      Landscape enhancement,Recreation&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Gravel banks introduced,Re-grading of banks,Removal of bank protection at several sites&lt;br /&gt;
|Floodplain / River corridor=&lt;br /&gt;
      Large scale planting,Widening of flood corridor&lt;br /&gt;
|Planform / Channel pattern=&lt;br /&gt;
      Channel widening,Creation of willow island,Creation of braided channel,Allow future natural channel changes to occur&lt;br /&gt;
|Other technical measure=&lt;br /&gt;
      &lt;br /&gt;
|Management interventions=&lt;br /&gt;
      &lt;br /&gt;
|Social measures=&lt;br /&gt;
      &lt;br /&gt;
|Wider stakeholder / citizen engagement=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Continuity of sediment transport&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Public use&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image_gallery}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional_links_and_references_header}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Nivedita Mahida</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7353</id>
		<title>Case study:Isar-Plan</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7353"/>
		<updated>2012-12-14T12:03:53Z</updated>

		<summary type="html">&lt;p&gt;Nivedita Mahida: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Approved&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=48.127801652017084, 11.578259468078613&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Project web site url=www.wwa-m.bayern.de/projekte_und_programme/isarplan/index.htm&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Hydropower, Hydromorphology, Land use management - forestry, Monitoring, Social benefits, Spatial planning, Water quality&lt;br /&gt;
|Country=Germany&lt;br /&gt;
|Main contact forename=Nick&lt;br /&gt;
|Main contact surname=Elbourne&lt;br /&gt;
|Main contact id=NickRRC&lt;br /&gt;
|Contact organisation=State Office for Water Management Munich&lt;br /&gt;
|Contact organisation url=www.wwa-m.bayern.de/index.htm&lt;br /&gt;
|Partner organisations=City of Munich&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Before-After Isar.png&lt;br /&gt;
|Picture description=Straightened Isar (left) and restored diversified channel (Right)&lt;br /&gt;
|Project summary=The Isar Plan Project is a river restoration project on a stretch of 8Km in the inner city of Munich. The Project was initiated in 2000 and the last site was completed by 2011. The three main goals of the project were:&lt;br /&gt;
1) Flood protection&lt;br /&gt;
2) Enhancing Species diversity and ecological restoration&lt;br /&gt;
3) Improving leisure and recreation&lt;br /&gt;
&lt;br /&gt;
The project is being currently monitored.&lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_subcatchment&lt;br /&gt;
|Subcatchment=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Isar&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Munich&lt;br /&gt;
|WFD water body code=DE16_147237_173317&lt;br /&gt;
|WFD (national) typology=Type 4 &amp;quot;gravel and stone embossed flow of the Alpine foothills&amp;quot;&lt;br /&gt;
|Pre-project morphology=Straight,Revetments,Embanked,Impounded&lt;br /&gt;
|Reference morphology=Braided,High width:depth&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Site designation=Germany - Landschaftschutzgebiet&lt;br /&gt;
|Local site designation=Hochwasserwiesen&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Species=European green toad (Bufo viridis), little ringed plover (Charadrius dubius)&lt;br /&gt;
|Dominant hydrology=Quick and varying run-off&lt;br /&gt;
|Dominant substrate=Gravel- largely limestone&lt;br /&gt;
|River corridor land use=Urban &amp;amp; Forest&lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=8000 m&lt;br /&gt;
|Project started=1998/01/01&lt;br /&gt;
|Works completed=2011/08/31&lt;br /&gt;
|Total cost category=more than 10000 k€&lt;br /&gt;
|Total1 cost=35 M€&lt;br /&gt;
|Funding sources=City of Munich,Free state of Bavaria&lt;br /&gt;
|Investigation and design cost category=more than 10000 k€&lt;br /&gt;
|Invst and design cost=35000&lt;br /&gt;
|Investigation and design Lead organisation=State Office for Water Management Munich&lt;br /&gt;
|Investigation and design Other contact forename=Matthias&lt;br /&gt;
|Investigation and design Other contact surname=Junge&lt;br /&gt;
|Stakeholder1 engagement cost category=more than 10000 k€&lt;br /&gt;
|Stakeholder engagement Lead organisation=City of  Munich&lt;br /&gt;
|Stakeholder engagement Other contact forename=Peter&lt;br /&gt;
|Stakeholder engagement Other contact surname=Schaller&lt;br /&gt;
|Works1 and supervision cost category=more than 10000 k€&lt;br /&gt;
|Works and supervision Lead organisation=State Office for Water Management Munich&lt;br /&gt;
|Works and supervision Other contact forename=Stefan&lt;br /&gt;
|Works and supervision Other contact surname=Kirner&lt;br /&gt;
|Post-project1 management and maintenance cost category=more than 10000 k€&lt;br /&gt;
|Post-project management and maintenance Lead organisation=State Office for Water Management&lt;br /&gt;
|Monitoring1 cost category=more than 10000 k€&lt;br /&gt;
|Monitoring Lead organisation=State Office for Water Management&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones,Continuity of sediment transport&lt;br /&gt;
|Biological quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Physico-chemical quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Specific mitigation=&lt;br /&gt;
      Riparian development&lt;br /&gt;
|Other motivation=&lt;br /&gt;
      Landscape enhancement,Recreation&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Gravel banks introduced,Re-grading of banks,Removal of bank protection at several sites&lt;br /&gt;
|Floodplain / River corridor=&lt;br /&gt;
      Large scale planting,Widening of flood corridor&lt;br /&gt;
|Planform / Channel pattern=&lt;br /&gt;
      Channel widening,Creation of willow island,Creation of braided channel,Allow future natural channel changes to occur&lt;br /&gt;
|Other technical measure=&lt;br /&gt;
      &lt;br /&gt;
|Management interventions=&lt;br /&gt;
      &lt;br /&gt;
|Social measures=&lt;br /&gt;
      &lt;br /&gt;
|Wider stakeholder / citizen engagement=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Continuity of sediment transport&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Public use&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image_gallery}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional_links_and_references_header}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Nivedita Mahida</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7352</id>
		<title>Case study:Isar-Plan</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7352"/>
		<updated>2012-12-14T12:02:41Z</updated>

		<summary type="html">&lt;p&gt;Nivedita Mahida: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Approved&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=48.127801652017084, 11.578259468078613&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Project web site url=www.wwa-m.bayern.de/projekte_und_programme/isarplan/index.htm&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Hydropower, Hydromorphology, Land use management - forestry, Monitoring, Social benefits, Spatial planning, Water quality&lt;br /&gt;
|Country=Germany&lt;br /&gt;
|Main contact forename=Nick&lt;br /&gt;
|Main contact surname=Elbourne&lt;br /&gt;
|Main contact id=NickRRC&lt;br /&gt;
|Contact organisation=State Office for Water Management Munich&lt;br /&gt;
|Contact organisation url=www.wwa-m.bayern.de/index.htm&lt;br /&gt;
|Partner organisations=City of Munich&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Before-After Isar.png&lt;br /&gt;
|Picture description=Straightened Isar (left) and restored diversified channel (Right)&lt;br /&gt;
|Project summary=The Isar Plan Project is a river restoration project on a stretch of 8Km in the inner city of Munich. The Project was initiated in 2000 and the last site was completed by 2011. The three main goals of the project were:&lt;br /&gt;
1) Flood protection&lt;br /&gt;
2) Enhancing Species diversity and ecological restoration&lt;br /&gt;
3) Improving leisure and recreation&lt;br /&gt;
&lt;br /&gt;
The project is being currently monitored.&lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_subcatchment&lt;br /&gt;
|Subcatchment=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Isar&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Munich&lt;br /&gt;
|WFD water body code=DE16_147237_173317&lt;br /&gt;
|WFD (national) typology=Type 4 &amp;quot;gravel and stone embossed flow of the Alpine foothills&amp;quot;&lt;br /&gt;
|Pre-project morphology=Straight,Revetments,Embanked,Impounded&lt;br /&gt;
|Reference morphology=Braided,High width:depth&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Site designation=Germany - Landschaftschutzgebiet&lt;br /&gt;
|Local site designation=Hochwasserwiesen&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Species=European green toad (Bufo viridis), little ringed plover (Charadrius dubius)&lt;br /&gt;
|Dominant hydrology=Quick and varying run-off&lt;br /&gt;
|Dominant substrate=Gravel- largely limestone&lt;br /&gt;
|River corridor land use=Urban &amp;amp; Forest&lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=8000 m&lt;br /&gt;
|Project started=1998/01/01&lt;br /&gt;
|Works completed=2011/08/31&lt;br /&gt;
|Total cost category=more than 10000 k€&lt;br /&gt;
|Total1 cost=35 M€&lt;br /&gt;
|Funding sources=City of Munich,Free state of Bavaria&lt;br /&gt;
|Investigation and design cost category=more than 10000 k€&lt;br /&gt;
|Investigation and design Lead organisation=State Office for Water Management Munich&lt;br /&gt;
|Investigation and design Other contact forename=Matthias&lt;br /&gt;
|Investigation and design Other contact surname=Junge&lt;br /&gt;
|Stakeholder1 engagement cost category=more than 10000 k€&lt;br /&gt;
|Stakeholder engagement Lead organisation=City of  Munich&lt;br /&gt;
|Stakeholder engagement Other contact forename=Peter&lt;br /&gt;
|Stakeholder engagement Other contact surname=Schaller&lt;br /&gt;
|Works1 and supervision cost category=more than 10000 k€&lt;br /&gt;
|Works and supervision Lead organisation=State Office for Water Management Munich&lt;br /&gt;
|Works and supervision Other contact forename=Stefan&lt;br /&gt;
|Works and supervision Other contact surname=Kirner&lt;br /&gt;
|Post-project1 management and maintenance cost category=more than 10000 k€&lt;br /&gt;
|Post-project management and maintenance Lead organisation=State Office for Water Management&lt;br /&gt;
|Monitoring1 cost category=more than 10000 k€&lt;br /&gt;
|Monitoring Lead organisation=State Office for Water Management&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones,Continuity of sediment transport&lt;br /&gt;
|Biological quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Physico-chemical quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Specific mitigation=&lt;br /&gt;
      Riparian development&lt;br /&gt;
|Other motivation=&lt;br /&gt;
      Landscape enhancement,Recreation&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Gravel banks introduced,Re-grading of banks,Removal of bank protection at several sites&lt;br /&gt;
|Floodplain / River corridor=&lt;br /&gt;
      Large scale planting,Widening of flood corridor&lt;br /&gt;
|Planform / Channel pattern=&lt;br /&gt;
      Channel widening,Creation of willow island,Creation of braided channel,Allow future natural channel changes to occur&lt;br /&gt;
|Other technical measure=&lt;br /&gt;
      &lt;br /&gt;
|Management interventions=&lt;br /&gt;
      &lt;br /&gt;
|Social measures=&lt;br /&gt;
      &lt;br /&gt;
|Wider stakeholder / citizen engagement=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Continuity of sediment transport&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Public use&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image_gallery}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional_links_and_references_header}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Nivedita Mahida</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7351</id>
		<title>Case study:Isar-Plan</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7351"/>
		<updated>2012-12-14T12:00:24Z</updated>

		<summary type="html">&lt;p&gt;Nivedita Mahida: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Approved&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=48.127801652017084, 11.578259468078613&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Project web site url=www.wwa-m.bayern.de/projekte_und_programme/isarplan/index.htm&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Hydropower, Hydromorphology, Land use management - forestry, Monitoring, Social benefits, Spatial planning, Water quality&lt;br /&gt;
|Country=Germany&lt;br /&gt;
|Main contact forename=Nick&lt;br /&gt;
|Main contact surname=Elbourne&lt;br /&gt;
|Main contact id=NickRRC&lt;br /&gt;
|Contact organisation=State Office for Water Management Munich&lt;br /&gt;
|Contact organisation url=www.wwa-m.bayern.de/index.htm&lt;br /&gt;
|Partner organisations=City of Munich&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Before-After Isar.png&lt;br /&gt;
|Picture description=Straightened Isar (left) and restored diversified channel (Right)&lt;br /&gt;
|Project summary=The Isar Plan Project is a river restoration project on a stretch of 8Km in the inner city of Munich. The Project was initiated in 2000 and the last site was completed by 2011. The three main goals of the project were:&lt;br /&gt;
1) Flood protection&lt;br /&gt;
2) Enhancing Species diversity and ecological restoration&lt;br /&gt;
3) Improving leisure and recreation&lt;br /&gt;
&lt;br /&gt;
The project is being currently monitored.&lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_subcatchment&lt;br /&gt;
|Subcatchment=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Isar&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Munich&lt;br /&gt;
|WFD water body code=DE16_147237_173317&lt;br /&gt;
|WFD (national) typology=Type 4 &amp;quot;gravel and stone embossed flow of the Alpine foothills&amp;quot;&lt;br /&gt;
|Pre-project morphology=Straight,Revetments,Embanked,Impounded&lt;br /&gt;
|Reference morphology=Braided,High width:depth&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Site designation=Germany - Landschaftschutzgebiet&lt;br /&gt;
|Local site designation=Hochwasserwiesen&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Species=European green toad (Bufo viridis), little ringed plover (Charadrius dubius)&lt;br /&gt;
|Dominant hydrology=Quick and varying run-off&lt;br /&gt;
|Dominant substrate=Gravel- largely limestone&lt;br /&gt;
|River corridor land use=Urban &amp;amp; Forest&lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=8000 m&lt;br /&gt;
|Project started=1998/01/01&lt;br /&gt;
|Works completed=2006/01/01&lt;br /&gt;
|Total cost category=more than 10000 k€&lt;br /&gt;
|Total1 cost=3500 k€&lt;br /&gt;
|Funding sources=City of Munich,Free state of Bavaria&lt;br /&gt;
|Investigation and design cost category=more than 10000 k€&lt;br /&gt;
|Investigation and design Lead organisation=State Office for Water Management Munich&lt;br /&gt;
|Investigation and design Other contact forename=Matthias&lt;br /&gt;
|Investigation and design Other contact surname=Junge&lt;br /&gt;
|Stakeholder1 engagement cost category=more than 10000 k€&lt;br /&gt;
|Stakeholder engagement Lead organisation=City of  Munich&lt;br /&gt;
|Stakeholder engagement Other contact forename=Peter&lt;br /&gt;
|Stakeholder engagement Other contact surname=Schaller&lt;br /&gt;
|Works1 and supervision cost category=more than 10000 k€&lt;br /&gt;
|Works and supervision Lead organisation=State Office for Water Management Munich&lt;br /&gt;
|Works and supervision Other contact forename=Stefan &lt;br /&gt;
|Works and supervision Other contact surname=Kirner&lt;br /&gt;
|Post-project1 management and maintenance cost category=more than 10000 k€&lt;br /&gt;
|Post-project management and maintenance Lead organisation=State Office for Water Management&lt;br /&gt;
|Monitoring1 cost category=more than 10000 k€&lt;br /&gt;
|Monitoring Lead organisation=State Office for Water Management&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones,Continuity of sediment transport&lt;br /&gt;
|Biological quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Physico-chemical quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Specific mitigation=&lt;br /&gt;
      Riparian development&lt;br /&gt;
|Other motivation=&lt;br /&gt;
      Landscape enhancement,Recreation&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Gravel banks introduced,Re-grading of banks,Removal of bank protection at several sites&lt;br /&gt;
|Floodplain / River corridor=&lt;br /&gt;
      Large scale planting,Widening of flood corridor&lt;br /&gt;
|Planform / Channel pattern=&lt;br /&gt;
      Channel widening,Creation of willow island,Creation of braided channel,Allow future natural channel changes to occur&lt;br /&gt;
|Other technical measure=&lt;br /&gt;
      &lt;br /&gt;
|Management interventions=&lt;br /&gt;
      &lt;br /&gt;
|Social measures=&lt;br /&gt;
      &lt;br /&gt;
|Wider stakeholder / citizen engagement=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Continuity of sediment transport&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Public use&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image_gallery}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional_links_and_references_header}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Nivedita Mahida</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7350</id>
		<title>Case study:Isar-Plan</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7350"/>
		<updated>2012-12-14T11:57:01Z</updated>

		<summary type="html">&lt;p&gt;Nivedita Mahida: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Approved&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=48.127801652017084, 11.578259468078613&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Project web site url=www.wwa-m.bayern.de/projekte_und_programme/isarplan/index.htm&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Hydropower, Hydromorphology, Land use management - forestry, Monitoring, Social benefits, Spatial planning, Water quality&lt;br /&gt;
|Country=Germany&lt;br /&gt;
|Main contact forename=Nick&lt;br /&gt;
|Main contact surname=Elbourne&lt;br /&gt;
|Main contact id=NickRRC&lt;br /&gt;
|Contact organisation=State Office for Water Management Munich&lt;br /&gt;
|Contact organisation url=www.wwa-m.bayern.de/index.htm&lt;br /&gt;
|Partner organisations=City of Munich&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Before-After Isar.png&lt;br /&gt;
|Picture description=Straightened Isar (left) and restored diversified channel (Right)&lt;br /&gt;
|Project summary=The Isar Plan Project is a river restoration project on a stretch of 8Km in the inner city of Munich. The Project was initiated in 2000 and the last site was completed by 2011. The three main goals of the project were:&lt;br /&gt;
1) Flood protection&lt;br /&gt;
2) Enhancing Species diversity and ecological restoration&lt;br /&gt;
3) Improving leisure and recreation&lt;br /&gt;
&lt;br /&gt;
The project is being currently monitored.&lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_subcatchment&lt;br /&gt;
|Subcatchment=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Isar&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Munich&lt;br /&gt;
|WFD water body code=DE16_147237_173317&lt;br /&gt;
|WFD (national) typology=Type 4 &amp;quot;gravel and stone embossed flow of the Alpine foothills&amp;quot;&lt;br /&gt;
|Pre-project morphology=Straight,Revetments,Embanked,Impounded&lt;br /&gt;
|Reference morphology=Braided,High width:depth&lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Site designation=Germany - Landschaftschutzgebiet&lt;br /&gt;
|Local site designation=Hochwasserwiesen&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Species=European green toad (Bufo viridis), little ringed plover (Charadrius dubius)&lt;br /&gt;
|Dominant hydrology=Quick and varying run-off&lt;br /&gt;
|Dominant substrate=Gravel- largely limestone&lt;br /&gt;
|River corridor land use=Urban &amp;amp; Forest&lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
}}&lt;br /&gt;
{{Project_background&lt;br /&gt;
|Reach length directly affected=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      8000 m&lt;br /&gt;
|Project started=&lt;br /&gt;
      1998/01/01&lt;br /&gt;
|Works started=&lt;br /&gt;
      &lt;br /&gt;
|Works completed=&lt;br /&gt;
      2006/01/01&lt;br /&gt;
|Project completed=&lt;br /&gt;
      &lt;br /&gt;
|Total cost category=&lt;br /&gt;
      more than 10000 k€&lt;br /&gt;
|Total1 cost=&lt;br /&gt;
      3500 k€&lt;br /&gt;
|Funding sources=&lt;br /&gt;
      City of Munich,Free state of Bavaria&lt;br /&gt;
|Investigation and design cost category=&lt;br /&gt;
      &lt;br /&gt;
|Invst and design cost=&lt;br /&gt;
      &lt;br /&gt;
|Investigation and design Lead organisation=&lt;br /&gt;
      Bayerisches Landesamt für Umwelt&lt;br /&gt;
|Investigation and design Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Investigation and design Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder1 engagement cost category=&lt;br /&gt;
      &lt;br /&gt;
|stk engagement cost=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Lead organisation=&lt;br /&gt;
      Bayerisches Landesamt für Umwelt&lt;br /&gt;
|Stakeholder engagement Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Works1 and supervision cost category=&lt;br /&gt;
      &lt;br /&gt;
|Wrk and supervision cost=&lt;br /&gt;
      28000 k€&lt;br /&gt;
|Works and supervision Lead organisation=&lt;br /&gt;
      &lt;br /&gt;
|Works and supervision Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Works and supervision Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Post-project1 management and maintenance cost category=&lt;br /&gt;
      &lt;br /&gt;
|Post-project2 management and maintenance cost=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Lead organisation=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring1 cost category=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring2 cost=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring Lead organisation=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Supplementary funding information=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones,Continuity of sediment transport&lt;br /&gt;
|Biological quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Physico-chemical quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Specific mitigation=&lt;br /&gt;
      Riparian development&lt;br /&gt;
|Other motivation=&lt;br /&gt;
      Landscape enhancement,Recreation&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Gravel banks introduced,Re-grading of banks,Removal of bank protection at several sites&lt;br /&gt;
|Floodplain / River corridor=&lt;br /&gt;
      Large scale planting,Widening of flood corridor&lt;br /&gt;
|Planform / Channel pattern=&lt;br /&gt;
      Channel widening,Creation of willow island,Creation of braided channel,Allow future natural channel changes to occur&lt;br /&gt;
|Other technical measure=&lt;br /&gt;
      &lt;br /&gt;
|Management interventions=&lt;br /&gt;
      &lt;br /&gt;
|Social measures=&lt;br /&gt;
      &lt;br /&gt;
|Wider stakeholder / citizen engagement=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Continuity of sediment transport&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Public use&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image_gallery}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional_links_and_references_header}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Nivedita Mahida</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7348</id>
		<title>Case study:Isar-Plan</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7348"/>
		<updated>2012-12-14T10:26:12Z</updated>

		<summary type="html">&lt;p&gt;Nivedita Mahida: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Approved&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=48.127801652017084, 11.578259468078613&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Project web site url=www.wwa-m.bayern.de/projekte_und_programme/isarplan/index.htm&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Hydropower, Hydromorphology, Land use management - forestry, Monitoring, Social benefits, Spatial planning, Water quality&lt;br /&gt;
|Country=Germany&lt;br /&gt;
|Main contact forename=Nick&lt;br /&gt;
|Main contact surname=Elbourne&lt;br /&gt;
|Main contact id=NickRRC&lt;br /&gt;
|Contact organisation=State Office for Water Management Munich&lt;br /&gt;
|Contact organisation url=www.wwa-m.bayern.de/index.htm&lt;br /&gt;
|Partner organisations=City of Munich&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Before-After Isar.png&lt;br /&gt;
|Picture description=Straightened Isar (left) and restored diversified channel (Right)&lt;br /&gt;
|Project summary=The Isar Plan Project is a river restoration project on a stretch of 8Km in the inner city of Munich. The Project was initiated in 2000 and the last site was completed by 2011. The three main goals of the project were:&lt;br /&gt;
1) Flood protection&lt;br /&gt;
2) Enhancing Species diversity and ecological restoration&lt;br /&gt;
3) Improving leisure and recreation&lt;br /&gt;
&lt;br /&gt;
The project is being currently monitored.&lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_subcatchment&lt;br /&gt;
|Subcatchment=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Isar&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Munich&lt;br /&gt;
|WFD water body code=&lt;br /&gt;
      DE16_147237_173317&lt;br /&gt;
|WFD (national) typology=&lt;br /&gt;
      Type 4 &amp;quot;gravel and stone embossed flow of the Alpine foothills&amp;quot;&lt;br /&gt;
|WFD water body name=&lt;br /&gt;
      &lt;br /&gt;
|Pre-project morphology=&lt;br /&gt;
      Straight,Revetments,Embanked,Impounded&lt;br /&gt;
|Reference morphology=&lt;br /&gt;
      Braided,High width:depth&lt;br /&gt;
|Heavily modified water body=&lt;br /&gt;
      &lt;br /&gt;
|Local site designation=&lt;br /&gt;
      &lt;br /&gt;
|Site designation=&lt;br /&gt;
      &lt;br /&gt;
|Protected species present=&lt;br /&gt;
      &lt;br /&gt;
|Invasive species present=&lt;br /&gt;
      &lt;br /&gt;
|Species=&lt;br /&gt;
      &lt;br /&gt;
|Dominant hydrology=&lt;br /&gt;
      Quick run-off&lt;br /&gt;
|Dominant substrate=&lt;br /&gt;
      Gravel&lt;br /&gt;
|River corridor land use=&lt;br /&gt;
      Urban&lt;br /&gt;
|Average bankfull channel width category=&lt;br /&gt;
      10 - 50 m&lt;br /&gt;
|Avrg bankfull channel width=&lt;br /&gt;
      &lt;br /&gt;
|Average bankfull channel depth category=&lt;br /&gt;
      &lt;br /&gt;
|Avrg1 bankfull channel depth=&lt;br /&gt;
      &lt;br /&gt;
|Mean discharge category=&lt;br /&gt;
      &lt;br /&gt;
|Mn discharge=&lt;br /&gt;
      &lt;br /&gt;
|Average channel gradient category=&lt;br /&gt;
      &lt;br /&gt;
|Avrg channel gradient=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Project_background&lt;br /&gt;
|Reach length directly affected=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      8000 m&lt;br /&gt;
|Project started=&lt;br /&gt;
      1998/01/01&lt;br /&gt;
|Works started=&lt;br /&gt;
      &lt;br /&gt;
|Works completed=&lt;br /&gt;
      2006/01/01&lt;br /&gt;
|Project completed=&lt;br /&gt;
      &lt;br /&gt;
|Total cost category=&lt;br /&gt;
      more than 10000 k€&lt;br /&gt;
|Total1 cost=&lt;br /&gt;
      3500 k€&lt;br /&gt;
|Funding sources=&lt;br /&gt;
      City of Munich,Free state of Bavaria&lt;br /&gt;
|Investigation and design cost category=&lt;br /&gt;
      &lt;br /&gt;
|Invst and design cost=&lt;br /&gt;
      &lt;br /&gt;
|Investigation and design Lead organisation=&lt;br /&gt;
      Bayerisches Landesamt für Umwelt&lt;br /&gt;
|Investigation and design Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Investigation and design Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder1 engagement cost category=&lt;br /&gt;
      &lt;br /&gt;
|stk engagement cost=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Lead organisation=&lt;br /&gt;
      Bayerisches Landesamt für Umwelt&lt;br /&gt;
|Stakeholder engagement Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Works1 and supervision cost category=&lt;br /&gt;
      &lt;br /&gt;
|Wrk and supervision cost=&lt;br /&gt;
      28000 k€&lt;br /&gt;
|Works and supervision Lead organisation=&lt;br /&gt;
      &lt;br /&gt;
|Works and supervision Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Works and supervision Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Post-project1 management and maintenance cost category=&lt;br /&gt;
      &lt;br /&gt;
|Post-project2 management and maintenance cost=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Lead organisation=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring1 cost category=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring2 cost=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring Lead organisation=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Supplementary funding information=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones,Continuity of sediment transport&lt;br /&gt;
|Biological quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Physico-chemical quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Specific mitigation=&lt;br /&gt;
      Riparian development&lt;br /&gt;
|Other motivation=&lt;br /&gt;
      Landscape enhancement,Recreation&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Gravel banks introduced,Re-grading of banks,Removal of bank protection at several sites&lt;br /&gt;
|Floodplain / River corridor=&lt;br /&gt;
      Large scale planting,Widening of flood corridor&lt;br /&gt;
|Planform / Channel pattern=&lt;br /&gt;
      Channel widening,Creation of willow island,Creation of braided channel,Allow future natural channel changes to occur&lt;br /&gt;
|Other technical measure=&lt;br /&gt;
      &lt;br /&gt;
|Management interventions=&lt;br /&gt;
      &lt;br /&gt;
|Social measures=&lt;br /&gt;
      &lt;br /&gt;
|Wider stakeholder / citizen engagement=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Continuity of sediment transport&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Public use&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image_gallery}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional_links_and_references_header}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Nivedita Mahida</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7347</id>
		<title>Case study:Isar-Plan</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7347"/>
		<updated>2012-12-14T10:24:13Z</updated>

		<summary type="html">&lt;p&gt;Nivedita Mahida: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Approved&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=48.127801652017084, 11.578259468078613&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Project web site url=www.wwa-m.bayern.de/projekte_und_programme/isarplan/index.htm&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Hydropower, Hydromorphology, Land use management - forestry, Monitoring, Social benefits, Spatial planning, Water quality&lt;br /&gt;
|Country=Germany&lt;br /&gt;
|Main contact forename=Nick&lt;br /&gt;
|Main contact surname=Elbourne&lt;br /&gt;
|Main contact id=NickRRC&lt;br /&gt;
|Contact organisation=State Office for Water Management Munich&lt;br /&gt;
|Contact organisation url=www.wwa-m.bayern.de/index.htm&lt;br /&gt;
|Partner organisations=City of Munich&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Before-After Isar.png&lt;br /&gt;
|Picture description=Straightened Isar (left) and restored diversified channel (Right)&lt;br /&gt;
|Project summary=The Isar Plan Project is a river restoration project on a stretch of 8Km in the inner city of Munich. The Project was initiated in 2000 and the last site was completed by 2011. The three main goals of the project were:&lt;br /&gt;
1) Flood protection&lt;br /&gt;
2) Enhancing Species diversity and ecological restoration&lt;br /&gt;
3) Improving leisure and recreation&lt;br /&gt;
&lt;br /&gt;
The project is being currently monitored. &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_subcatchment&lt;br /&gt;
|Subcatchment=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Isar&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Munich&lt;br /&gt;
|WFD water body code=&lt;br /&gt;
      DE16_147237_173317&lt;br /&gt;
|WFD (national) typology=&lt;br /&gt;
      Type 4 &amp;quot;gravel and stone embossed flow of the Alpine foothills&amp;quot;&lt;br /&gt;
|WFD water body name=&lt;br /&gt;
      &lt;br /&gt;
|Pre-project morphology=&lt;br /&gt;
      Straight,Revetments,Embanked,Impounded&lt;br /&gt;
|Reference morphology=&lt;br /&gt;
      Braided,High width:depth&lt;br /&gt;
|Heavily modified water body=&lt;br /&gt;
      &lt;br /&gt;
|Local site designation=&lt;br /&gt;
      &lt;br /&gt;
|Site designation=&lt;br /&gt;
      &lt;br /&gt;
|Protected species present=&lt;br /&gt;
      &lt;br /&gt;
|Invasive species present=&lt;br /&gt;
      &lt;br /&gt;
|Species=&lt;br /&gt;
      &lt;br /&gt;
|Dominant hydrology=&lt;br /&gt;
      Quick run-off&lt;br /&gt;
|Dominant substrate=&lt;br /&gt;
      Gravel&lt;br /&gt;
|River corridor land use=&lt;br /&gt;
      Urban&lt;br /&gt;
|Average bankfull channel width category=&lt;br /&gt;
      10 - 50 m&lt;br /&gt;
|Avrg bankfull channel width=&lt;br /&gt;
      &lt;br /&gt;
|Average bankfull channel depth category=&lt;br /&gt;
      &lt;br /&gt;
|Avrg1 bankfull channel depth=&lt;br /&gt;
      &lt;br /&gt;
|Mean discharge category=&lt;br /&gt;
      &lt;br /&gt;
|Mn discharge=&lt;br /&gt;
      &lt;br /&gt;
|Average channel gradient category=&lt;br /&gt;
      &lt;br /&gt;
|Avrg channel gradient=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Project_background&lt;br /&gt;
|Reach length directly affected=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      8000 m&lt;br /&gt;
|Project started=&lt;br /&gt;
      1998/01/01&lt;br /&gt;
|Works started=&lt;br /&gt;
      &lt;br /&gt;
|Works completed=&lt;br /&gt;
      2006/01/01&lt;br /&gt;
|Project completed=&lt;br /&gt;
      &lt;br /&gt;
|Total cost category=&lt;br /&gt;
      more than 10000 k€&lt;br /&gt;
|Total1 cost=&lt;br /&gt;
      3500 k€&lt;br /&gt;
|Funding sources=&lt;br /&gt;
      City of Munich,Free state of Bavaria&lt;br /&gt;
|Investigation and design cost category=&lt;br /&gt;
      &lt;br /&gt;
|Invst and design cost=&lt;br /&gt;
      &lt;br /&gt;
|Investigation and design Lead organisation=&lt;br /&gt;
      Bayerisches Landesamt für Umwelt&lt;br /&gt;
|Investigation and design Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Investigation and design Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder1 engagement cost category=&lt;br /&gt;
      &lt;br /&gt;
|stk engagement cost=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Lead organisation=&lt;br /&gt;
      Bayerisches Landesamt für Umwelt&lt;br /&gt;
|Stakeholder engagement Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Works1 and supervision cost category=&lt;br /&gt;
      &lt;br /&gt;
|Wrk and supervision cost=&lt;br /&gt;
      28000 k€&lt;br /&gt;
|Works and supervision Lead organisation=&lt;br /&gt;
      &lt;br /&gt;
|Works and supervision Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Works and supervision Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Post-project1 management and maintenance cost category=&lt;br /&gt;
      &lt;br /&gt;
|Post-project2 management and maintenance cost=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Lead organisation=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring1 cost category=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring2 cost=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring Lead organisation=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Supplementary funding information=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones,Continuity of sediment transport&lt;br /&gt;
|Biological quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Physico-chemical quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Specific mitigation=&lt;br /&gt;
      Riparian development&lt;br /&gt;
|Other motivation=&lt;br /&gt;
      Landscape enhancement,Recreation&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Gravel banks introduced,Re-grading of banks,Removal of bank protection at several sites&lt;br /&gt;
|Floodplain / River corridor=&lt;br /&gt;
      Large scale planting,Widening of flood corridor&lt;br /&gt;
|Planform / Channel pattern=&lt;br /&gt;
      Channel widening,Creation of willow island,Creation of braided channel,Allow future natural channel changes to occur&lt;br /&gt;
|Other technical measure=&lt;br /&gt;
      &lt;br /&gt;
|Management interventions=&lt;br /&gt;
      &lt;br /&gt;
|Social measures=&lt;br /&gt;
      &lt;br /&gt;
|Wider stakeholder / citizen engagement=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Continuity of sediment transport&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Public use&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image_gallery}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional_links_and_references_header}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Nivedita Mahida</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Subcatchment:Isar&amp;diff=7346</id>
		<title>Subcatchment:Isar</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Subcatchment:Isar&amp;diff=7346"/>
		<updated>2012-12-14T10:16:28Z</updated>

		<summary type="html">&lt;p&gt;Nivedita Mahida: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Catchment and subcatchment&lt;br /&gt;
|River basin district=Danube&lt;br /&gt;
|Rvr basin=Isar&lt;br /&gt;
|River name=Isar&lt;br /&gt;
|Area category=1000 - 10000 km²&lt;br /&gt;
|Area exact=9000&lt;br /&gt;
|Maximum altitude category=1000 - 2000 m&lt;br /&gt;
|Subcatchment dominant geology=Siliceous&lt;br /&gt;
|Ecoregion=Central Highlands&lt;br /&gt;
}}&lt;/div&gt;</summary>
		<author><name>Nivedita Mahida</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7345</id>
		<title>Case study:Isar-Plan</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Isar-Plan&amp;diff=7345"/>
		<updated>2012-12-14T09:46:08Z</updated>

		<summary type="html">&lt;p&gt;Nivedita Mahida: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Approved&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=48.127801652017084, 11.578259468078613&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Hydromorphology, Monitoring, Spatial planning&lt;br /&gt;
|Country=Germany&lt;br /&gt;
|Main contact forename=Nick&lt;br /&gt;
|Main contact surname=Elbourne&lt;br /&gt;
|Main contact id=NickRRC&lt;br /&gt;
|Contact organisation=Bayerisches Landesamt für Umwelt&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Before-After Isar.png&lt;br /&gt;
|Picture description=Straightened Isar (left) and restored diversified channel (Right)&lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_subcatchment&lt;br /&gt;
|Subcatchment=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Isar&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Munich&lt;br /&gt;
|WFD water body code=&lt;br /&gt;
      DE16_147237_173317&lt;br /&gt;
|WFD (national) typology=&lt;br /&gt;
      Type 4 &amp;quot;gravel and stone embossed flow of the Alpine foothills&amp;quot;&lt;br /&gt;
|WFD water body name=&lt;br /&gt;
      &lt;br /&gt;
|Pre-project morphology=&lt;br /&gt;
      Straight,Revetments,Embanked,Impounded&lt;br /&gt;
|Reference morphology=&lt;br /&gt;
      Braided,High width:depth&lt;br /&gt;
|Heavily modified water body=&lt;br /&gt;
      &lt;br /&gt;
|Local site designation=&lt;br /&gt;
      &lt;br /&gt;
|Site designation=&lt;br /&gt;
      &lt;br /&gt;
|Protected species present=&lt;br /&gt;
      &lt;br /&gt;
|Invasive species present=&lt;br /&gt;
      &lt;br /&gt;
|Species=&lt;br /&gt;
      &lt;br /&gt;
|Dominant hydrology=&lt;br /&gt;
      Quick run-off&lt;br /&gt;
|Dominant substrate=&lt;br /&gt;
      Gravel&lt;br /&gt;
|River corridor land use=&lt;br /&gt;
      Urban&lt;br /&gt;
|Average bankfull channel width category=&lt;br /&gt;
      10 - 50 m&lt;br /&gt;
|Avrg bankfull channel width=&lt;br /&gt;
      &lt;br /&gt;
|Average bankfull channel depth category=&lt;br /&gt;
      &lt;br /&gt;
|Avrg1 bankfull channel depth=&lt;br /&gt;
      &lt;br /&gt;
|Mean discharge category=&lt;br /&gt;
      &lt;br /&gt;
|Mn discharge=&lt;br /&gt;
      &lt;br /&gt;
|Average channel gradient category=&lt;br /&gt;
      &lt;br /&gt;
|Avrg channel gradient=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Project_background&lt;br /&gt;
|Reach length directly affected=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      8000 m&lt;br /&gt;
|Project started=&lt;br /&gt;
      1998/01/01&lt;br /&gt;
|Works started=&lt;br /&gt;
      &lt;br /&gt;
|Works completed=&lt;br /&gt;
      2006/01/01&lt;br /&gt;
|Project completed=&lt;br /&gt;
      &lt;br /&gt;
|Total cost category=&lt;br /&gt;
      more than 10000 k€&lt;br /&gt;
|Total1 cost=&lt;br /&gt;
      3500 k€&lt;br /&gt;
|Funding sources=&lt;br /&gt;
      City of Munich,Free state of Bavaria&lt;br /&gt;
|Investigation and design cost category=&lt;br /&gt;
      &lt;br /&gt;
|Invst and design cost=&lt;br /&gt;
      &lt;br /&gt;
|Investigation and design Lead organisation=&lt;br /&gt;
      Bayerisches Landesamt für Umwelt&lt;br /&gt;
|Investigation and design Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Investigation and design Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder1 engagement cost category=&lt;br /&gt;
      &lt;br /&gt;
|stk engagement cost=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Lead organisation=&lt;br /&gt;
      Bayerisches Landesamt für Umwelt&lt;br /&gt;
|Stakeholder engagement Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Works1 and supervision cost category=&lt;br /&gt;
      &lt;br /&gt;
|Wrk and supervision cost=&lt;br /&gt;
      28000 k€&lt;br /&gt;
|Works and supervision Lead organisation=&lt;br /&gt;
      &lt;br /&gt;
|Works and supervision Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Works and supervision Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Post-project1 management and maintenance cost category=&lt;br /&gt;
      &lt;br /&gt;
|Post-project2 management and maintenance cost=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Lead organisation=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring1 cost category=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring2 cost=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring Lead organisation=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Supplementary funding information=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones,Continuity of sediment transport&lt;br /&gt;
|Biological quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Physico-chemical quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Specific mitigation=&lt;br /&gt;
      Riparian development&lt;br /&gt;
|Other motivation=&lt;br /&gt;
      Landscape enhancement,Recreation&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Gravel banks introduced,Re-grading of banks,Removal of bank protection at several sites&lt;br /&gt;
|Floodplain / River corridor=&lt;br /&gt;
      Large scale planting,Widening of flood corridor&lt;br /&gt;
|Planform / Channel pattern=&lt;br /&gt;
      Channel widening,Creation of willow island,Creation of braided channel,Allow future natural channel changes to occur&lt;br /&gt;
|Other technical measure=&lt;br /&gt;
      &lt;br /&gt;
|Management interventions=&lt;br /&gt;
      &lt;br /&gt;
|Social measures=&lt;br /&gt;
      &lt;br /&gt;
|Wider stakeholder / citizen engagement=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Continuity of sediment transport&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Public use&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image_gallery}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional_links_and_references_header}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Nivedita Mahida</name></author>
	</entry>
</feed>