<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://restorerivers.eu/wiki/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Bozbru</id>
	<title>RESTORE - User contributions [en]</title>
	<link rel="self" type="application/atom+xml" href="https://restorerivers.eu/wiki/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Bozbru"/>
	<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Special:Contributions/Bozbru"/>
	<updated>2026-04-04T14:48:04Z</updated>
	<subtitle>User contributions</subtitle>
	<generator>MediaWiki 1.39.7</generator>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9998</id>
		<title>Case study:Rio Tepice urban restoration</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9998"/>
		<updated>2013-05-06T14:34:17Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case_study_status&lt;br /&gt;
|Approval status=&lt;br /&gt;
    &lt;br /&gt;
  &lt;br /&gt;
  &lt;br /&gt;
    &lt;br /&gt;
      Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.010046513508726, 7.817300319802598&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Habitat and biodiversity, Social benefits, Spatial planning&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Guido&lt;br /&gt;
|Main contact surname=Blanchard&lt;br /&gt;
|Contact organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Contact organisation url=www.coqblanc.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Overview.jpg&lt;br /&gt;
|Picture description=The restored stretch of Rio Tepice in the urban area of  Chieri&lt;br /&gt;
|Project summary=This project concerned the restoration of a stretch of Rio Tepice in the urban area of Chieri (TO) through this kind of actions: &lt;br /&gt;
- restoration (cutting, new plantations with autochthonous species, bioengineering works)of the riparian vegetation and of the river banks; &lt;br /&gt;
- revegetation of an area of 1.08 hectare;&lt;br /&gt;
- creation of new footpaths adjacent to the watercourse&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Tepice&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Rio Tepice in Chieri&lt;br /&gt;
|WFD water body code=0010941pi&lt;br /&gt;
|WFD (national) typology=06SS2T&lt;br /&gt;
|Pre-project morphology=Single channel,High width:depth&lt;br /&gt;
|Reference morphology=Pool-riffle&lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Protected species present=No&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Dominant hydrology=Quick run-off&lt;br /&gt;
|Dominant substrate=Cobble&lt;br /&gt;
|River corridor land use=Urban&lt;br /&gt;
|Average bankfull channel width category=Less than 2 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mn discharge=1.5&lt;br /&gt;
|Avrg channel gradient=0.013&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=250 m&lt;br /&gt;
|Project started=1993/03/01&lt;br /&gt;
|Works started=1996/05/01&lt;br /&gt;
|Works completed=1997/12/01&lt;br /&gt;
|Project completed=1997/12/01&lt;br /&gt;
|Total cost category=100 - 500 k€&lt;br /&gt;
|Total1 cost=123 k€&lt;br /&gt;
|Funding sources=Piermonte region,Chieri municiplaity&lt;br /&gt;
|Investigation and design cost category=1 - 10 k€&lt;br /&gt;
|Invst and design cost=7 k€&lt;br /&gt;
|Investigation and design Lead organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Investigation and design Other contact forename=Guido&lt;br /&gt;
|Investigation and design Other contact surname=Blanchard&lt;br /&gt;
|Works1 and supervision cost category=100 - 500 k€&lt;br /&gt;
|Works and supervision Lead organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Works and supervision Other contact forename=Guido&lt;br /&gt;
|Works and supervision Other contact surname=Blanchard&lt;br /&gt;
|Post-project1 management and maintenance cost category=10 - 50 k€&lt;br /&gt;
|Post-project management and maintenance Lead organisation=Chieri municiplaity&lt;br /&gt;
|Monitoring Lead organisation=“Il tuo Parco” association&lt;br /&gt;
|Monitoring Other contact forename=Luca&lt;br /&gt;
|Monitoring Other contact surname=Bruno&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=Channel pattern/planform&lt;br /&gt;
|Other motivation=Landscape and enjoyment enhancement&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=embankement renaturalization&lt;br /&gt;
|Floodplain / River corridor=Riparian tree planting&lt;br /&gt;
|Management interventions=Management of paths&lt;br /&gt;
|Social measures=Public green area building&lt;br /&gt;
|Wider stakeholder / citizen engagement=Participation in monitoring&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Ex ante status &amp;quot;Il Rio Tepice nel suo Viaggio verso il Po&amp;quot; Ass. Il tuo Parco&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      &lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Bioengineering works.jpg&lt;br /&gt;
|Caption=Bioengineering works&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Pre-post.jpg&lt;br /&gt;
|Caption=During and after works&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Chieri after.jpg&lt;br /&gt;
|Caption=The tepice stream after restoration&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=www.coqblanc.it/public/schedeA3_Chieri_tepice.ppt&lt;br /&gt;
|Description=Presentation of the project actions&lt;br /&gt;
}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9997</id>
		<title>Case study:Rio Tepice urban restoration</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9997"/>
		<updated>2013-05-06T14:33:31Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case_study_status&lt;br /&gt;
|Approval status=&lt;br /&gt;
    &lt;br /&gt;
  &lt;br /&gt;
  &lt;br /&gt;
    &lt;br /&gt;
      Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.010046513508726, 7.817300319802598&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Habitat and biodiversity, Social benefits, Spatial planning&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Guido&lt;br /&gt;
|Main contact surname=Blanchard&lt;br /&gt;
|Contact organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Contact organisation url=www.coqblanc.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Overview.jpg&lt;br /&gt;
|Picture description=The restored stretch of Rio Tepice in the urban area of  Chieri&lt;br /&gt;
|Project summary=This project concerned the restoration of a stretch of Rio Tepice in the urban area of Chieri (TO) through this kind of actions: &lt;br /&gt;
- restoration (cutting, new plantations with autochthonous species, bioengineering works)of the riparian vegetation and of the river banks; &lt;br /&gt;
- revegetation of an area of 1.08 hectare;&lt;br /&gt;
- creation of new footpaths adjacent to the watercourse&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Tepice&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Rio Tepice in Chieri&lt;br /&gt;
|WFD water body code=0010941pi&lt;br /&gt;
|WFD (national) typology=06SS2T&lt;br /&gt;
|Pre-project morphology=Single channel,High width:depth&lt;br /&gt;
|Reference morphology=Pool-riffle&lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Protected species present=No&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Dominant hydrology=Quick run-off&lt;br /&gt;
|Dominant substrate=Cobble&lt;br /&gt;
|River corridor land use=Urban&lt;br /&gt;
|Average bankfull channel width category=Less than 2 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mn discharge=1.5&lt;br /&gt;
|Avrg channel gradient=0.013&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=250 m&lt;br /&gt;
|Project started=1993/03/01&lt;br /&gt;
|Works started=1996/05/01&lt;br /&gt;
|Works completed=1997/12/01&lt;br /&gt;
|Project completed=1997/12/01&lt;br /&gt;
|Total cost category=100 - 500 k€&lt;br /&gt;
|Total1 cost=123 k€&lt;br /&gt;
|Funding sources=Piermonte region,Chieri municiplaity&lt;br /&gt;
|Investigation and design cost category=1 - 10 k€&lt;br /&gt;
|Invst and design cost=7 k€&lt;br /&gt;
|Investigation and design Lead organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Investigation and design Other contact forename=Guido&lt;br /&gt;
|Investigation and design Other contact surname=Blanchard&lt;br /&gt;
|Works1 and supervision cost category=100 - 500 k€&lt;br /&gt;
|Works and supervision Lead organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Works and supervision Other contact forename=Guido&lt;br /&gt;
|Works and supervision Other contact surname=Blanchard&lt;br /&gt;
|Post-project1 management and maintenance cost category=10 - 50 k€&lt;br /&gt;
|Post-project management and maintenance Lead organisation=Chieri municiplaity&lt;br /&gt;
|Monitoring Lead organisation=“Il tuo Parco” association&lt;br /&gt;
|Monitoring Other contact forename=Luca&lt;br /&gt;
|Monitoring Other contact surname=Bruno&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=Channel pattern/planform&lt;br /&gt;
|Other motivation=Landscape and enjoyment enhancement&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=embankement renaturalization&lt;br /&gt;
|Floodplain / River corridor=Riparian tree planting&lt;br /&gt;
|Management interventions=Management of paths&lt;br /&gt;
|Social measures=Public green area building&lt;br /&gt;
|Wider stakeholder / citizen engagement=Participation in monitoring&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Ex ante status &amp;quot;Il Rio Tepice nel suo Viaggio verso il Po&amp;quot; Ass. Il tuo Parco&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      &lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Bioengineering works.jpg&lt;br /&gt;
|Caption=Bioengineering works&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Pre-post.jpg&lt;br /&gt;
|Caption=During and after works&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Chieri before.jpg&lt;br /&gt;
|Caption=The situation before the urban and river restoration&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Chieri after.jpg&lt;br /&gt;
|Caption=The tepice stream after restoration&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=www.coqblanc.it/public/schedeA3_Chieri_tepice.ppt&lt;br /&gt;
|Description=Presentation of the project actions&lt;br /&gt;
}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9996</id>
		<title>Case study:Rio Tepice urban restoration</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9996"/>
		<updated>2013-05-06T14:33:12Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case_study_status&lt;br /&gt;
|Approval status=&lt;br /&gt;
    &lt;br /&gt;
  &lt;br /&gt;
  &lt;br /&gt;
    &lt;br /&gt;
      Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.010046513508726, 7.817300319802598&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Habitat and biodiversity, Social benefits, Spatial planning&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Guido&lt;br /&gt;
|Main contact surname=Blanchard&lt;br /&gt;
|Contact organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Contact organisation url=www.coqblanc.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Overview.jpg&lt;br /&gt;
|Picture description=The restored stretch of Rio Tepice in the urban area of  Chieri&lt;br /&gt;
|Project summary=This project concerned the restoration of a stretch of Rio Tepice in the urban area of Chieri (TO) through this kind of actions: &lt;br /&gt;
- restoration (cutting, new plantations with autochthonous species, bioengineering works)of the riparian vegetation and of the river banks; &lt;br /&gt;
- revegetation of an area of 1.08 hectare;&lt;br /&gt;
- creation of new footpaths adjacent to the watercourse&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Tepice&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Rio Tepice in Chieri&lt;br /&gt;
|WFD water body code=0010941pi&lt;br /&gt;
|WFD (national) typology=06SS2T&lt;br /&gt;
|Pre-project morphology=Single channel,High width:depth&lt;br /&gt;
|Reference morphology=Pool-riffle&lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Protected species present=No&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Dominant hydrology=Quick run-off&lt;br /&gt;
|Dominant substrate=Cobble&lt;br /&gt;
|River corridor land use=Urban&lt;br /&gt;
|Average bankfull channel width category=Less than 2 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mn discharge=1.5&lt;br /&gt;
|Avrg channel gradient=0.013&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=250 m&lt;br /&gt;
|Project started=1993/03/01&lt;br /&gt;
|Works started=1996/05/01&lt;br /&gt;
|Works completed=1997/12/01&lt;br /&gt;
|Project completed=1997/12/01&lt;br /&gt;
|Total cost category=100 - 500 k€&lt;br /&gt;
|Total1 cost=123 k€&lt;br /&gt;
|Funding sources=Piermonte region,Chieri municiplaity&lt;br /&gt;
|Investigation and design cost category=1 - 10 k€&lt;br /&gt;
|Invst and design cost=7 k€&lt;br /&gt;
|Investigation and design Lead organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Investigation and design Other contact forename=Guido&lt;br /&gt;
|Investigation and design Other contact surname=Blanchard&lt;br /&gt;
|Works1 and supervision cost category=100 - 500 k€&lt;br /&gt;
|Works and supervision Lead organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Works and supervision Other contact forename=Guido&lt;br /&gt;
|Works and supervision Other contact surname=Blanchard&lt;br /&gt;
|Post-project1 management and maintenance cost category=10 - 50 k€&lt;br /&gt;
|Post-project management and maintenance Lead organisation=Chieri municiplaity&lt;br /&gt;
|Monitoring Lead organisation=“Il tuo Parco” association&lt;br /&gt;
|Monitoring Other contact forename=Luca&lt;br /&gt;
|Monitoring Other contact surname=Bruno&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=Channel pattern/planform&lt;br /&gt;
|Other motivation=Landscape and enjoyment enhancement&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=embankement renaturalization&lt;br /&gt;
|Floodplain / River corridor=Riparian tree planting&lt;br /&gt;
|Management interventions=Management of paths&lt;br /&gt;
|Social measures=Public green area building&lt;br /&gt;
|Wider stakeholder / citizen engagement=Participation in monitoring&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Ex ante status &amp;quot;Il Rio Tepice nel suo Viaggio verso il Po&amp;quot; Ass. Il tuo Parco&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      &lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Bioengineering works.jpg&lt;br /&gt;
|Caption=Bioengineering works&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Pre-post.jpg&lt;br /&gt;
|Caption=During and after works&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Aerial view pre-post.jpg&lt;br /&gt;
|Caption=Aerial view before and after&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Chieri before.jpg&lt;br /&gt;
|Caption=The situation before the urban and river restoration&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Chieri after.jpg&lt;br /&gt;
|Caption=The tepice stream after restoration&lt;br /&gt;
}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=www.coqblanc.it/public/schedeA3_Chieri_tepice.ppt&lt;br /&gt;
|Description=Presentation of the project actions&lt;br /&gt;
}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9995</id>
		<title>Case study:Rio Tepice urban restoration</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9995"/>
		<updated>2013-05-06T14:32:24Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case_study_status&lt;br /&gt;
|Approval status=&lt;br /&gt;
    &lt;br /&gt;
  &lt;br /&gt;
  &lt;br /&gt;
    &lt;br /&gt;
      Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.010046513508726, 7.817300319802598&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Habitat and biodiversity, Social benefits, Spatial planning&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Guido&lt;br /&gt;
|Main contact surname=Blanchard&lt;br /&gt;
|Contact organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Contact organisation url=www.coqblanc.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Overview.jpg&lt;br /&gt;
|Picture description=The restored stretch of Rio Tepice in the urban area of  Chieri&lt;br /&gt;
|Project summary=This project concerned the restoration of a stretch of Rio Tepice in the urban area of Chieri (TO) through this kind of actions: &lt;br /&gt;
- restoration (cutting, new plantations with autochthonous species, bioengineering works)of the riparian vegetation and of the river banks; &lt;br /&gt;
- revegetation of an area of 1.08 hectare previously occupied by buildings;&lt;br /&gt;
- creation of new footpaths adjacent to the watercourse&lt;br /&gt;
&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Tepice&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Rio Tepice in Chieri&lt;br /&gt;
|WFD water body code=0010941pi&lt;br /&gt;
|WFD (national) typology=06SS2T&lt;br /&gt;
|Pre-project morphology=Single channel,High width:depth&lt;br /&gt;
|Reference morphology=Pool-riffle&lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Protected species present=No&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Dominant hydrology=Quick run-off&lt;br /&gt;
|Dominant substrate=Cobble&lt;br /&gt;
|River corridor land use=Urban&lt;br /&gt;
|Average bankfull channel width category=Less than 2 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mn discharge=1.5&lt;br /&gt;
|Avrg channel gradient=0.013&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=250 m&lt;br /&gt;
|Project started=1993/03/01&lt;br /&gt;
|Works started=1996/05/01&lt;br /&gt;
|Works completed=1997/12/01&lt;br /&gt;
|Project completed=1997/12/01&lt;br /&gt;
|Total cost category=100 - 500 k€&lt;br /&gt;
|Total1 cost=123 k€&lt;br /&gt;
|Funding sources=Piermonte region,Chieri municiplaity&lt;br /&gt;
|Investigation and design cost category=1 - 10 k€&lt;br /&gt;
|Invst and design cost=7 k€&lt;br /&gt;
|Investigation and design Lead organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Investigation and design Other contact forename=Guido&lt;br /&gt;
|Investigation and design Other contact surname=Blanchard&lt;br /&gt;
|Works1 and supervision cost category=100 - 500 k€&lt;br /&gt;
|Works and supervision Lead organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Works and supervision Other contact forename=Guido&lt;br /&gt;
|Works and supervision Other contact surname=Blanchard&lt;br /&gt;
|Post-project1 management and maintenance cost category=10 - 50 k€&lt;br /&gt;
|Post-project management and maintenance Lead organisation=Chieri municiplaity&lt;br /&gt;
|Monitoring Lead organisation=“Il tuo Parco” association&lt;br /&gt;
|Monitoring Other contact forename=Luca&lt;br /&gt;
|Monitoring Other contact surname=Bruno&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=Channel pattern/planform&lt;br /&gt;
|Other motivation=Landscape and enjoyment enhancement&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=embankement renaturalization&lt;br /&gt;
|Floodplain / River corridor=Riparian tree planting&lt;br /&gt;
|Management interventions=Management of paths&lt;br /&gt;
|Social measures=Public green area building&lt;br /&gt;
|Wider stakeholder / citizen engagement=Participation in monitoring&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Ex ante status &amp;quot;Il Rio Tepice nel suo Viaggio verso il Po&amp;quot; Ass. Il tuo Parco&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      &lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Bioengineering works.jpg&lt;br /&gt;
|Caption=Bioengineering works&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Pre-post.jpg&lt;br /&gt;
|Caption=During and after works&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Aerial view pre-post.jpg&lt;br /&gt;
|Caption=Aerial view before and after&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Chieri before.jpg&lt;br /&gt;
|Caption=The situation before the urban and river restoration&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Chieri after.jpg&lt;br /&gt;
|Caption=The tepice stream after restoration&lt;br /&gt;
}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=www.coqblanc.it/public/schedeA3_Chieri_tepice.ppt&lt;br /&gt;
|Description=Presentation of the project actions&lt;br /&gt;
}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9965</id>
		<title>Case study:Rio Tepice urban restoration</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9965"/>
		<updated>2013-04-30T13:12:17Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case_study_status&lt;br /&gt;
|Approval status=&lt;br /&gt;
    &lt;br /&gt;
  &lt;br /&gt;
  &lt;br /&gt;
    &lt;br /&gt;
      Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.01231441444817, 7.816817522179917&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Habitat and biodiversity, Social benefits, Spatial planning&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Guido&lt;br /&gt;
|Main contact surname=Blanchard&lt;br /&gt;
|Contact organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Contact organisation url=www.coqblanc.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Overview.jpg&lt;br /&gt;
|Picture description=The restored stretch of Rio Tepice in the urban area of  Chieri&lt;br /&gt;
|Project summary=This project concerned the restoration of a stretch of Rio Tepice in the urban area of Chieri (TO) through this kind of actions: &lt;br /&gt;
- restoration (cutting, new plantations with autochthonous species, bioengineering works)of the riparian vegetation and of the river banks; &lt;br /&gt;
- revegetation of an area of 1.08 hectare previously occupied by buildings;&lt;br /&gt;
- creation of new footpaths adjacent to the watercourse&lt;br /&gt;
&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Tepice&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Rio Tepice in Chieri&lt;br /&gt;
|WFD water body code=0010941pi&lt;br /&gt;
|WFD (national) typology=06SS2T&lt;br /&gt;
|Pre-project morphology=Single channel,High width:depth&lt;br /&gt;
|Reference morphology=Pool-riffle&lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Protected species present=No&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Dominant hydrology=Quick run-off&lt;br /&gt;
|Dominant substrate=Cobble&lt;br /&gt;
|River corridor land use=Urban&lt;br /&gt;
|Average bankfull channel width category=Less than 2 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mn discharge=1.5&lt;br /&gt;
|Avrg channel gradient=0.013&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=250 m&lt;br /&gt;
|Project started=1993/03/01&lt;br /&gt;
|Works started=1996/05/01&lt;br /&gt;
|Works completed=1997/12/01&lt;br /&gt;
|Project completed=1997/12/01&lt;br /&gt;
|Total cost category=100 - 500 k€&lt;br /&gt;
|Total1 cost=123 k€&lt;br /&gt;
|Funding sources=Piermonte region,Chieri municiplaity&lt;br /&gt;
|Investigation and design cost category=1 - 10 k€&lt;br /&gt;
|Invst and design cost=7 k€&lt;br /&gt;
|Investigation and design Lead organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Investigation and design Other contact forename=Guido&lt;br /&gt;
|Investigation and design Other contact surname=Blanchard&lt;br /&gt;
|Works1 and supervision cost category=100 - 500 k€&lt;br /&gt;
|Works and supervision Lead organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Works and supervision Other contact forename=Guido&lt;br /&gt;
|Works and supervision Other contact surname=Blanchard&lt;br /&gt;
|Post-project1 management and maintenance cost category=10 - 50 k€&lt;br /&gt;
|Post-project management and maintenance Lead organisation=Chieri municiplaity&lt;br /&gt;
|Monitoring Lead organisation=“Il tuo Parco” association&lt;br /&gt;
|Monitoring Other contact forename=Luca&lt;br /&gt;
|Monitoring Other contact surname=Bruno&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=Channel pattern/planform&lt;br /&gt;
|Other motivation=Landscape and enjoyment enhancement&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=embankement renaturalization&lt;br /&gt;
|Floodplain / River corridor=Riparian tree planting&lt;br /&gt;
|Management interventions=Management of paths&lt;br /&gt;
|Social measures=Public green area building&lt;br /&gt;
|Wider stakeholder / citizen engagement=Participation in monitoring&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Ex ante status &amp;quot;Il Rio Tepice nel suo Viaggio verso il Po&amp;quot; Ass. Il tuo Parco&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      &lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Bioengineering works.jpg&lt;br /&gt;
|Caption=Bioengineering works&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Pre-post.jpg&lt;br /&gt;
|Caption=During and after works&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Aerial view pre-post.jpg&lt;br /&gt;
|Caption=Aerial view before and after&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Chieri before.jpg&lt;br /&gt;
|Caption=The situation before the urban and river restoration&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Chieri after.jpg&lt;br /&gt;
|Caption=The tepice stream after restoration&lt;br /&gt;
}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=www.coqblanc.it/public/schedeA3_Chieri_tepice.ppt&lt;br /&gt;
|Description=Presentation of the project actions&lt;br /&gt;
}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:Chieri_after.jpg&amp;diff=9964</id>
		<title>File:Chieri after.jpg</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:Chieri_after.jpg&amp;diff=9964"/>
		<updated>2013-04-30T13:11:50Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:Chieri_before.jpg&amp;diff=9963</id>
		<title>File:Chieri before.jpg</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:Chieri_before.jpg&amp;diff=9963"/>
		<updated>2013-04-30T13:10:06Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_Stream_urban_requalification_-_Chieri&amp;diff=9962</id>
		<title>Case study:Rio Tepice Stream urban requalification - Chieri</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_Stream_urban_requalification_-_Chieri&amp;diff=9962"/>
		<updated>2013-04-30T12:53:47Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: moved Case study:Rio Tepice Stream urban requalification - Chieri to Case study:Rio Tepice stream urban requalification - Chieri&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;#REDIRECT [[Case study:Rio Tepice stream urban requalification - Chieri]]&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9961</id>
		<title>Case study:Rio Tepice urban restoration</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9961"/>
		<updated>2013-04-30T12:53:47Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: moved Case study:Rio Tepice Stream urban requalification - Chieri to Case study:Rio Tepice stream urban requalification - Chieri&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case_study_status&lt;br /&gt;
|Approval status=&lt;br /&gt;
    &lt;br /&gt;
  &lt;br /&gt;
  &lt;br /&gt;
    &lt;br /&gt;
      Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.01231441444817, 7.816817522179917&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Habitat and biodiversity, Social benefits, Spatial planning&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Guido&lt;br /&gt;
|Main contact surname=Blanchard&lt;br /&gt;
|Contact organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Contact organisation url=www.coqblanc.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Overview.jpg&lt;br /&gt;
|Picture description=The restored stretch of Rio Tepice in the urban area of  Chieri&lt;br /&gt;
|Project summary=This project concerned the restoration of a stretch of Rio Tepice in the urban area of Chieri (TO) through this kind of actions: &lt;br /&gt;
- restoration (cutting, new plantations with autochthonous species, bioengineering works)of the riparian vegetation and of the river banks; &lt;br /&gt;
- revegetation of an area of 1.08 hectare previously occupied by buildings;&lt;br /&gt;
- creation of new footpaths adjacent to the watercourse&lt;br /&gt;
&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Tepice&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Rio Tepice in Chieri&lt;br /&gt;
|WFD water body code=0010941pi&lt;br /&gt;
|WFD (national) typology=06SS2T&lt;br /&gt;
|Pre-project morphology=Single channel,High width:depth&lt;br /&gt;
|Reference morphology=Pool-riffle&lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Protected species present=No&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Dominant hydrology=Quick run-off&lt;br /&gt;
|Dominant substrate=Cobble&lt;br /&gt;
|River corridor land use=Urban&lt;br /&gt;
|Average bankfull channel width category=Less than 2 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mn discharge=1.5&lt;br /&gt;
|Avrg channel gradient=0.013&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=250 m&lt;br /&gt;
|Project started=1993/03/01&lt;br /&gt;
|Works started=1996/05/01&lt;br /&gt;
|Works completed=1997/12/01&lt;br /&gt;
|Project completed=1997/12/01&lt;br /&gt;
|Total cost category=100 - 500 k€&lt;br /&gt;
|Total1 cost=123 k€&lt;br /&gt;
|Funding sources=Piermonte region,Chieri municiplaity&lt;br /&gt;
|Investigation and design cost category=1 - 10 k€&lt;br /&gt;
|Invst and design cost=7 k€&lt;br /&gt;
|Investigation and design Lead organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Investigation and design Other contact forename=Guido&lt;br /&gt;
|Investigation and design Other contact surname=Blanchard&lt;br /&gt;
|Works1 and supervision cost category=100 - 500 k€&lt;br /&gt;
|Works and supervision Lead organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Works and supervision Other contact forename=Guido&lt;br /&gt;
|Works and supervision Other contact surname=Blanchard&lt;br /&gt;
|Post-project1 management and maintenance cost category=10 - 50 k€&lt;br /&gt;
|Post-project management and maintenance Lead organisation=Chieri municiplaity&lt;br /&gt;
|Monitoring Lead organisation=“Il tuo Parco” association&lt;br /&gt;
|Monitoring Other contact forename=Luca&lt;br /&gt;
|Monitoring Other contact surname=Bruno&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=Channel pattern/planform&lt;br /&gt;
|Other motivation=Landscape and enjoyment enhancement&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=embankement renaturalization&lt;br /&gt;
|Floodplain / River corridor=Riparian tree planting&lt;br /&gt;
|Management interventions=Management of paths&lt;br /&gt;
|Social measures=Public green area building&lt;br /&gt;
|Wider stakeholder / citizen engagement=Participation in monitoring&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Ex ante status &amp;quot;Il Rio Tepice nel suo Viaggio verso il Po&amp;quot; Ass. Il tuo Parco&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      &lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Bioengineering works.jpg&lt;br /&gt;
|Caption=Bioengineering works&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Pre-post.jpg&lt;br /&gt;
|Caption=During and after works&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Aerial view pre-post.jpg&lt;br /&gt;
|Caption=Aerial view before and after&lt;br /&gt;
}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=www.coqblanc.it/public/schedeA3_Chieri_tepice.ppt&lt;br /&gt;
|Description=Presentation of the project actions&lt;br /&gt;
}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9960</id>
		<title>Case study:Rio Tepice urban restoration</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9960"/>
		<updated>2013-04-30T12:52:02Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case_study_status&lt;br /&gt;
|Approval status=&lt;br /&gt;
    &lt;br /&gt;
  &lt;br /&gt;
  &lt;br /&gt;
    &lt;br /&gt;
      Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.01231441444817, 7.816817522179917&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Habitat and biodiversity, Social benefits, Spatial planning&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Guido&lt;br /&gt;
|Main contact surname=Blanchard&lt;br /&gt;
|Contact organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Contact organisation url=www.coqblanc.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Overview.jpg&lt;br /&gt;
|Picture description=The restored stretch of Rio Tepice in the urban area of  Chieri&lt;br /&gt;
|Project summary=This project concerned the restoration of a stretch of Rio Tepice in the urban area of Chieri (TO) through this kind of actions: &lt;br /&gt;
- restoration (cutting, new plantations with autochthonous species, bioengineering works)of the riparian vegetation and of the river banks; &lt;br /&gt;
- revegetation of an area of 1.08 hectare previously occupied by buildings;&lt;br /&gt;
- creation of new footpaths adjacent to the watercourse&lt;br /&gt;
&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Tepice&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Rio Tepice in Chieri&lt;br /&gt;
|WFD water body code=0010941pi&lt;br /&gt;
|WFD (national) typology=06SS2T&lt;br /&gt;
|Pre-project morphology=Single channel,High width:depth&lt;br /&gt;
|Reference morphology=Pool-riffle&lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Protected species present=No&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Dominant hydrology=Quick run-off&lt;br /&gt;
|Dominant substrate=Cobble&lt;br /&gt;
|River corridor land use=Urban&lt;br /&gt;
|Average bankfull channel width category=Less than 2 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mn discharge=1.5&lt;br /&gt;
|Avrg channel gradient=0.013&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=250 m&lt;br /&gt;
|Project started=1993/03/01&lt;br /&gt;
|Works started=1996/05/01&lt;br /&gt;
|Works completed=1997/12/01&lt;br /&gt;
|Project completed=1997/12/01&lt;br /&gt;
|Total cost category=100 - 500 k€&lt;br /&gt;
|Total1 cost=123 k€&lt;br /&gt;
|Funding sources=Piermonte region,Chieri municiplaity&lt;br /&gt;
|Investigation and design cost category=1 - 10 k€&lt;br /&gt;
|Invst and design cost=7 k€&lt;br /&gt;
|Investigation and design Lead organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Investigation and design Other contact forename=Guido&lt;br /&gt;
|Investigation and design Other contact surname=Blanchard&lt;br /&gt;
|Works1 and supervision cost category=100 - 500 k€&lt;br /&gt;
|Works and supervision Lead organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Works and supervision Other contact forename=Guido&lt;br /&gt;
|Works and supervision Other contact surname=Blanchard&lt;br /&gt;
|Post-project1 management and maintenance cost category=10 - 50 k€&lt;br /&gt;
|Post-project management and maintenance Lead organisation=Chieri municiplaity&lt;br /&gt;
|Monitoring Lead organisation=“Il tuo Parco” association&lt;br /&gt;
|Monitoring Other contact forename=Luca&lt;br /&gt;
|Monitoring Other contact surname=Bruno&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=Channel pattern/planform&lt;br /&gt;
|Other motivation=Landscape and enjoyment enhancement&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=embankement renaturalization&lt;br /&gt;
|Floodplain / River corridor=Riparian tree planting&lt;br /&gt;
|Management interventions=Management of paths&lt;br /&gt;
|Social measures=Public green area building&lt;br /&gt;
|Wider stakeholder / citizen engagement=Participation in monitoring&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Ex ante status &amp;quot;Il Rio Tepice nel suo Viaggio verso il Po&amp;quot; Ass. Il tuo Parco&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      &lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Bioengineering works.jpg&lt;br /&gt;
|Caption=Bioengineering works&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Pre-post.jpg&lt;br /&gt;
|Caption=During and after works&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Aerial view pre-post.jpg&lt;br /&gt;
|Caption=Aerial view before and after&lt;br /&gt;
}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=www.coqblanc.it/public/schedeA3_Chieri_tepice.ppt&lt;br /&gt;
|Description=Presentation of the project actions&lt;br /&gt;
}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9959</id>
		<title>Case study:Rio Tepice urban restoration</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9959"/>
		<updated>2013-04-30T12:50:37Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case_study_status&lt;br /&gt;
|Approval status=&lt;br /&gt;
    &lt;br /&gt;
  &lt;br /&gt;
  &lt;br /&gt;
    &lt;br /&gt;
      Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.01231441444817, 7.816817522179917&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Habitat and biodiversity, Social benefits, Spatial planning&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Guido&lt;br /&gt;
|Main contact surname=Blanchard&lt;br /&gt;
|Contact organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Contact organisation url=www.coqblanc.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Overview.jpg&lt;br /&gt;
|Picture description=The restored stretch of Rio Tepice in the urban area of  Chieri&lt;br /&gt;
|Project summary=This project concerned the restoration of a stretch of Rio Tepice in the urban area of Chieri (TO) through this kind of actions: &lt;br /&gt;
- restoration (cutting, new plantations with autochthonous species, bioengineering works)of the riparian vegetation and of the river banks; &lt;br /&gt;
- revegetation of an area of 1.08 hectare previously occupied by buildings;&lt;br /&gt;
- creation of new footpaths adjacent to the watercourse&lt;br /&gt;
&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Tepice&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Rio Tepice in Chieri&lt;br /&gt;
|WFD water body code=0010941pi&lt;br /&gt;
|WFD (national) typology=06SS2T&lt;br /&gt;
|Pre-project morphology=Single channel,High width:depth&lt;br /&gt;
|Reference morphology=Pool-riffle&lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Protected species present=No&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Dominant hydrology=Quick run-off&lt;br /&gt;
|Dominant substrate=Cobble&lt;br /&gt;
|River corridor land use=Urban&lt;br /&gt;
|Average bankfull channel width category=Less than 2 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mn discharge=1.5&lt;br /&gt;
|Avrg channel gradient=0.013&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=250 m&lt;br /&gt;
|Project started=1993/03/01&lt;br /&gt;
|Works started=1996/05/01&lt;br /&gt;
|Works completed=1997/12/01&lt;br /&gt;
|Project completed=1997/12/01&lt;br /&gt;
|Total cost category=100 - 500 k€&lt;br /&gt;
|Total1 cost=123 k€&lt;br /&gt;
|Funding sources=Piermonte region,Chieri municiplaity&lt;br /&gt;
|Investigation and design cost category=1 - 10 k€&lt;br /&gt;
|Invst and design cost=7 k€&lt;br /&gt;
|Investigation and design Lead organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Investigation and design Other contact forename=Guido&lt;br /&gt;
|Investigation and design Other contact surname=Blanchard&lt;br /&gt;
|Works1 and supervision cost category=100 - 500 k€&lt;br /&gt;
|Works and supervision Lead organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Works and supervision Other contact forename=Guido&lt;br /&gt;
|Works and supervision Other contact surname=Blanchard&lt;br /&gt;
|Post-project1 management and maintenance cost category=10 - 50 k€&lt;br /&gt;
|Post-project management and maintenance Lead organisation=Chieri municiplaity&lt;br /&gt;
|Monitoring Lead organisation=“Il tuo Parco” association&lt;br /&gt;
|Monitoring Other contact forename=Luca&lt;br /&gt;
|Monitoring Other contact surname=Bruno&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Channel pattern/planform&lt;br /&gt;
|Biological quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Physico-chemical quality elements=&lt;br /&gt;
      Nutrient concentrations&lt;br /&gt;
|Specific mitigation=&lt;br /&gt;
      &lt;br /&gt;
|Other motivation=&lt;br /&gt;
      Landscape enhancement&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=embankement renaturalization&lt;br /&gt;
|Floodplain / River corridor=Riparian tree planting&lt;br /&gt;
|Management interventions=Management of paths&lt;br /&gt;
|Social measures=Public green area building&lt;br /&gt;
|Wider stakeholder / citizen engagement=Participation in monitoring&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Ex ante status &amp;quot;Il Rio Tepice nel suo Viaggio verso il Po&amp;quot; Ass. Il tuo Parco&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      &lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Bioengineering works.jpg&lt;br /&gt;
|Caption=Bioengineering works&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Pre-post.jpg&lt;br /&gt;
|Caption=During and after works&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Aerial view pre-post.jpg&lt;br /&gt;
|Caption=Aerial view before and after&lt;br /&gt;
}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=www.coqblanc.it/public/schedeA3_Chieri_tepice.ppt&lt;br /&gt;
|Description=Presentation of the project actions&lt;br /&gt;
}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9958</id>
		<title>Case study:Rio Tepice urban restoration</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9958"/>
		<updated>2013-04-30T11:30:49Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case_study_status&lt;br /&gt;
|Approval status=&lt;br /&gt;
    &lt;br /&gt;
  &lt;br /&gt;
  &lt;br /&gt;
    &lt;br /&gt;
      Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.01231441444817, 7.816817522179917&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Habitat and biodiversity, Social benefits, Spatial planning&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Guido&lt;br /&gt;
|Main contact surname=Blanchard&lt;br /&gt;
|Contact organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Contact organisation url=www.coqblanc.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Overview.jpg&lt;br /&gt;
|Picture description=The restored stretch of Rio Tepice in the urban area of  Chieri&lt;br /&gt;
|Project summary=This project concerned the restoration of a stretch of Rio Tepice in the urban area of Chieri (TO)throught these kind of actions:&lt;br /&gt;
- restoration (cutting, new plantations with autoctonous species, bioengeneering works)of the riparian vegetation and of the river banks;&lt;br /&gt;
- revegetation of an area of ​​1.08 hectare previously occupied by a manufacturing;&lt;br /&gt;
- creation of new footpaths adjacent to the watercourse&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Tepice&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Rio Tepice in Chieri&lt;br /&gt;
|WFD water body code=0010941pi&lt;br /&gt;
|WFD (national) typology=06SS2T&lt;br /&gt;
|Pre-project morphology=Single channel,High width:depth&lt;br /&gt;
|Reference morphology=Pool-riffle&lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Protected species present=No&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Dominant hydrology=Quick run-off&lt;br /&gt;
|Dominant substrate=Cobble&lt;br /&gt;
|River corridor land use=Urban&lt;br /&gt;
|Average bankfull channel width category=Less than 2 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mn discharge=1.5&lt;br /&gt;
|Avrg channel gradient=0.013&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=250 m&lt;br /&gt;
|Project started=1993/03/01&lt;br /&gt;
|Works started=1996/05/01&lt;br /&gt;
|Works completed=1997/12/01&lt;br /&gt;
|Project completed=1997/12/01&lt;br /&gt;
|Total cost category=100 - 500 k€&lt;br /&gt;
|Total1 cost=123 k€&lt;br /&gt;
|Funding sources=Piermonte region,Chieri municiplaity&lt;br /&gt;
|Investigation and design cost category=1 - 10 k€&lt;br /&gt;
|Invst and design cost=7 k€&lt;br /&gt;
|Investigation and design Lead organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Investigation and design Other contact forename=Guido&lt;br /&gt;
|Investigation and design Other contact surname=Blanchard&lt;br /&gt;
|Works1 and supervision cost category=100 - 500 k€&lt;br /&gt;
|Works and supervision Lead organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Works and supervision Other contact forename=Guido&lt;br /&gt;
|Works and supervision Other contact surname=Blanchard&lt;br /&gt;
|Post-project1 management and maintenance cost category=10 - 50 k€&lt;br /&gt;
|Post-project management and maintenance Lead organisation=Chieri municiplaity&lt;br /&gt;
|Monitoring Lead organisation=“Il tuo Parco” association&lt;br /&gt;
|Monitoring Other contact forename=Luca&lt;br /&gt;
|Monitoring Other contact surname=Bruno&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Channel pattern/planform&lt;br /&gt;
|Biological quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Physico-chemical quality elements=&lt;br /&gt;
      Nutrient concentrations&lt;br /&gt;
|Specific mitigation=&lt;br /&gt;
      &lt;br /&gt;
|Other motivation=&lt;br /&gt;
      Landscape enhancement&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=embankement renaturalization&lt;br /&gt;
|Floodplain / River corridor=Riparian tree planting&lt;br /&gt;
|Management interventions=Management of paths&lt;br /&gt;
|Social measures=Public green area building&lt;br /&gt;
|Wider stakeholder / citizen engagement=Participation in monitoring&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Ex ante status &amp;quot;Il Rio Tepice nel suo Viaggio verso il Po&amp;quot; Ass. Il tuo Parco&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      &lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Bioengineering works.jpg&lt;br /&gt;
|Caption=Bioengineering works&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Pre-post.jpg&lt;br /&gt;
|Caption=During and after works&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Aerial view pre-post.jpg&lt;br /&gt;
|Caption=Aerial view before and after&lt;br /&gt;
}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=www.coqblanc.it/public/schedeA3_Chieri_tepice.ppt&lt;br /&gt;
|Description=Presentation of the project actions&lt;br /&gt;
}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:Aerial_view_pre-post.jpg&amp;diff=9957</id>
		<title>File:Aerial view pre-post.jpg</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:Aerial_view_pre-post.jpg&amp;diff=9957"/>
		<updated>2013-04-30T11:30:34Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9956</id>
		<title>Case study:Rio Tepice urban restoration</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9956"/>
		<updated>2013-04-30T11:28:54Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case_study_status&lt;br /&gt;
|Approval status=&lt;br /&gt;
    &lt;br /&gt;
  &lt;br /&gt;
  &lt;br /&gt;
    &lt;br /&gt;
      Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.01231441444817, 7.816817522179917&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Habitat and biodiversity, Social benefits, Spatial planning&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Guido&lt;br /&gt;
|Main contact surname=Blanchard&lt;br /&gt;
|Contact organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Contact organisation url=www.coqblanc.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Overview.jpg&lt;br /&gt;
|Picture description=The restored stretch of Rio Tepice in the urban area of  Chieri&lt;br /&gt;
|Project summary=This project concerned the restoration of a stretch of Rio Tepice in the urban area of Chieri (TO)throught these kind of actions:&lt;br /&gt;
- restoration (cutting, new plantations with autoctonous species, bioengeneering works)of the riparian vegetation and of the river banks;&lt;br /&gt;
- revegetation of an area of ​​1.08 hectare previously occupied by a manufacturing;&lt;br /&gt;
- creation of new footpaths adjacent to the watercourse&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Tepice&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Rio Tepice in Chieri&lt;br /&gt;
|WFD water body code=0010941pi&lt;br /&gt;
|WFD (national) typology=06SS2T&lt;br /&gt;
|Pre-project morphology=Single channel,High width:depth&lt;br /&gt;
|Reference morphology=Pool-riffle&lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Protected species present=No&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Dominant hydrology=Quick run-off&lt;br /&gt;
|Dominant substrate=Cobble&lt;br /&gt;
|River corridor land use=Urban&lt;br /&gt;
|Average bankfull channel width category=Less than 2 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mn discharge=1.5&lt;br /&gt;
|Avrg channel gradient=0.013&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=250 m&lt;br /&gt;
|Project started=1993/03/01&lt;br /&gt;
|Works started=1996/05/01&lt;br /&gt;
|Works completed=1997/12/01&lt;br /&gt;
|Project completed=1997/12/01&lt;br /&gt;
|Total cost category=100 - 500 k€&lt;br /&gt;
|Total1 cost=123 k€&lt;br /&gt;
|Funding sources=Piermonte region,Chieri municiplaity&lt;br /&gt;
|Investigation and design cost category=1 - 10 k€&lt;br /&gt;
|Invst and design cost=7 k€&lt;br /&gt;
|Investigation and design Lead organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Investigation and design Other contact forename=Guido&lt;br /&gt;
|Investigation and design Other contact surname=Blanchard&lt;br /&gt;
|Works1 and supervision cost category=100 - 500 k€&lt;br /&gt;
|Works and supervision Lead organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Works and supervision Other contact forename=Guido&lt;br /&gt;
|Works and supervision Other contact surname=Blanchard&lt;br /&gt;
|Post-project1 management and maintenance cost category=10 - 50 k€&lt;br /&gt;
|Post-project management and maintenance Lead organisation=Chieri municiplaity&lt;br /&gt;
|Monitoring Lead organisation=“Il tuo Parco” association&lt;br /&gt;
|Monitoring Other contact forename=Luca&lt;br /&gt;
|Monitoring Other contact surname=Bruno&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Channel pattern/planform&lt;br /&gt;
|Biological quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Physico-chemical quality elements=&lt;br /&gt;
      Nutrient concentrations&lt;br /&gt;
|Specific mitigation=&lt;br /&gt;
      &lt;br /&gt;
|Other motivation=&lt;br /&gt;
      Landscape enhancement&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=embankement renaturalization&lt;br /&gt;
|Floodplain / River corridor=Riparian tree planting&lt;br /&gt;
|Management interventions=Management of paths&lt;br /&gt;
|Social measures=Public green area building&lt;br /&gt;
|Wider stakeholder / citizen engagement=Participation in monitoring&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Ex ante status &amp;quot;Il Rio Tepice nel suo Viaggio verso il Po&amp;quot; Ass. Il tuo Parco&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      &lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Bioengineering works.jpg&lt;br /&gt;
|Caption=Bioengineering works&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Pre-post.jpg&lt;br /&gt;
|Caption=During and after works&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Aerial view pre-post.pdf&lt;br /&gt;
|Caption=Aerial view before and after&lt;br /&gt;
}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=www.coqblanc.it/public/schedeA3_Chieri_tepice.ppt&lt;br /&gt;
|Description=Presentation of the project actions&lt;br /&gt;
}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:Aerial_view_pre-post.pdf&amp;diff=9955</id>
		<title>File:Aerial view pre-post.pdf</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:Aerial_view_pre-post.pdf&amp;diff=9955"/>
		<updated>2013-04-30T11:28:40Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:Pre-post.jpg&amp;diff=9954</id>
		<title>File:Pre-post.jpg</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:Pre-post.jpg&amp;diff=9954"/>
		<updated>2013-04-30T11:24:39Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:Bioengineering_works.jpg&amp;diff=9953</id>
		<title>File:Bioengineering works.jpg</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:Bioengineering_works.jpg&amp;diff=9953"/>
		<updated>2013-04-30T11:23:52Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9952</id>
		<title>Case study:Rio Tepice urban restoration</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9952"/>
		<updated>2013-04-30T11:12:43Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case_study_status&lt;br /&gt;
|Approval status=&lt;br /&gt;
    &lt;br /&gt;
  &lt;br /&gt;
  &lt;br /&gt;
    &lt;br /&gt;
      Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.01231441444817, 7.816817522179917&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Habitat and biodiversity, Social benefits, Spatial planning&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Guido&lt;br /&gt;
|Main contact surname=Blanchard&lt;br /&gt;
|Contact organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Contact organisation url=www.coqblanc.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Overview.jpg&lt;br /&gt;
|Picture description=The restored stretch of Rio Tepice in the urban area of  Chieri&lt;br /&gt;
|Project summary=This project concerned the restoration of a stretch of Rio Tepice in the urban area of Chieri (TO)throught these kind of actions:&lt;br /&gt;
- restoration (cutting, new plantations with autoctonous species, bioengeneering works)of the riparian vegetation and of the river banks;&lt;br /&gt;
- revegetation of an area of ​​1.08 hectare previously occupied by a manufacturing;&lt;br /&gt;
- creation of new footpaths adjacent to the watercourse&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Tepice&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Rio Tepice in Chieri&lt;br /&gt;
|WFD water body code=0010941pi&lt;br /&gt;
|WFD (national) typology=06SS2T&lt;br /&gt;
|Pre-project morphology=Single channel,High width:depth&lt;br /&gt;
|Reference morphology=Pool-riffle&lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Protected species present=No&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Dominant hydrology=Quick run-off&lt;br /&gt;
|Dominant substrate=Cobble&lt;br /&gt;
|River corridor land use=Urban&lt;br /&gt;
|Average bankfull channel width category=Less than 2 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mn discharge=1.5&lt;br /&gt;
|Avrg channel gradient=0.013&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=250 m&lt;br /&gt;
|Project started=1993/03/01&lt;br /&gt;
|Works started=1996/05/01&lt;br /&gt;
|Works completed=1997/12/01&lt;br /&gt;
|Project completed=1997/12/01&lt;br /&gt;
|Total cost category=100 - 500 k€&lt;br /&gt;
|Total1 cost=123 k€&lt;br /&gt;
|Funding sources=Piermonte region,Chieri municiplaity&lt;br /&gt;
|Investigation and design cost category=1 - 10 k€&lt;br /&gt;
|Invst and design cost=7 k€&lt;br /&gt;
|Investigation and design Lead organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Investigation and design Other contact forename=Guido&lt;br /&gt;
|Investigation and design Other contact surname=Blanchard&lt;br /&gt;
|Works1 and supervision cost category=100 - 500 k€&lt;br /&gt;
|Works and supervision Lead organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Works and supervision Other contact forename=Guido&lt;br /&gt;
|Works and supervision Other contact surname=Blanchard&lt;br /&gt;
|Post-project1 management and maintenance cost category=10 - 50 k€&lt;br /&gt;
|Post-project management and maintenance Lead organisation=Chieri municiplaity&lt;br /&gt;
|Monitoring Lead organisation=“Il tuo Parco” association&lt;br /&gt;
|Monitoring Other contact forename=Luca&lt;br /&gt;
|Monitoring Other contact surname=Bruno&lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Channel pattern/planform&lt;br /&gt;
|Biological quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Physico-chemical quality elements=&lt;br /&gt;
      Nutrient concentrations&lt;br /&gt;
|Specific mitigation=&lt;br /&gt;
      &lt;br /&gt;
|Other motivation=&lt;br /&gt;
      Landscape enhancement&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=embankement renaturalization&lt;br /&gt;
|Floodplain / River corridor=Riparian tree planting&lt;br /&gt;
|Management interventions=Management of paths&lt;br /&gt;
|Social measures=Public green area building&lt;br /&gt;
|Wider stakeholder / citizen engagement=Participation in monitoring&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Ex ante status &amp;quot;Il Rio Tepice nel suo Viaggio verso il Po&amp;quot; Ass. Il tuo Parco&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      &lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image_gallery}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=www.coqblanc.it/public/schedeA3_Chieri_tepice.ppt&lt;br /&gt;
|Description=Presentation of the project actions&lt;br /&gt;
}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9951</id>
		<title>Case study:Rio Tepice urban restoration</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9951"/>
		<updated>2013-04-30T11:10:05Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case_study_status&lt;br /&gt;
|Approval status=&lt;br /&gt;
    &lt;br /&gt;
  &lt;br /&gt;
  &lt;br /&gt;
    &lt;br /&gt;
      Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.01231441444817, 7.816817522179917&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Habitat and biodiversity, Social benefits, Spatial planning&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Guido&lt;br /&gt;
|Main contact surname=Blanchard&lt;br /&gt;
|Contact organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Contact organisation url=www.coqblanc.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Overview.jpg&lt;br /&gt;
|Picture description=The restored stretch of Rio Tepice in the urban area of  Chieri&lt;br /&gt;
|Project summary=This project concerned the restoration of a stretch of Rio Tepice in the urban area of Chieri (TO)throught these kind of actions:&lt;br /&gt;
- restoration (cutting, new plantations with autoctonous species, bioengeneering works)of the riparian vegetation and of the river banks;&lt;br /&gt;
- revegetation of an area of ​​1.08 hectare previously occupied by a manufacturing;&lt;br /&gt;
- creation of new footpaths adjacent to the watercourse&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Tepice&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Rio Tepice in Chieri&lt;br /&gt;
|WFD water body code=0010941pi&lt;br /&gt;
|WFD (national) typology=06SS2T&lt;br /&gt;
|Pre-project morphology=Single channel,High width:depth&lt;br /&gt;
|Reference morphology=Pool-riffle&lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Protected species present=No&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Dominant hydrology=Quick run-off&lt;br /&gt;
|Dominant substrate=Cobble&lt;br /&gt;
|River corridor land use=Urban&lt;br /&gt;
|Average bankfull channel width category=Less than 2 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mn discharge=1.5&lt;br /&gt;
|Avrg channel gradient=0.013&lt;br /&gt;
}}&lt;br /&gt;
{{Project_background&lt;br /&gt;
|Reach length directly affected=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      250 m&lt;br /&gt;
|Project started=&lt;br /&gt;
      1993/03/01&lt;br /&gt;
|Works started=&lt;br /&gt;
      1996/05/01&lt;br /&gt;
|Works completed=&lt;br /&gt;
      1997/12/01&lt;br /&gt;
|Project completed=&lt;br /&gt;
      &lt;br /&gt;
|Total cost category=&lt;br /&gt;
      100 - 500 k€&lt;br /&gt;
|Total1 cost=&lt;br /&gt;
      123 k€&lt;br /&gt;
|Funding sources=&lt;br /&gt;
      Piermonte region,Chieri municiplaity&lt;br /&gt;
|Investigation and design cost category=&lt;br /&gt;
      1 - 10 k€&lt;br /&gt;
|Invst and design cost=&lt;br /&gt;
      7 k€&lt;br /&gt;
|Investigation and design Lead organisation=&lt;br /&gt;
      Studio Blanchard-Gallo&lt;br /&gt;
|Investigation and design Other contact forename=&lt;br /&gt;
      Guido&lt;br /&gt;
|Investigation and design Other contact surname=&lt;br /&gt;
      Blanchard&lt;br /&gt;
|Stakeholder1 engagement cost category=&lt;br /&gt;
      &lt;br /&gt;
|stk engagement cost=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Lead organisation=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Works1 and supervision cost category=&lt;br /&gt;
      100 - 500 k€&lt;br /&gt;
|Wrk and supervision cost=&lt;br /&gt;
      &lt;br /&gt;
|Works and supervision Lead organisation=&lt;br /&gt;
      Studio Blanchard-Gallo&lt;br /&gt;
|Works and supervision Other contact forename=&lt;br /&gt;
      Guido&lt;br /&gt;
|Works and supervision Other contact surname=&lt;br /&gt;
      Blanchard&lt;br /&gt;
|Post-project1 management and maintenance cost category=&lt;br /&gt;
      10 - 50 k€&lt;br /&gt;
|Post-project2 management and maintenance cost=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Lead organisation=&lt;br /&gt;
      Chieri municiplaity&lt;br /&gt;
|Post-project management and maintenance Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring1 cost category=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring2 cost=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring Lead organisation=&lt;br /&gt;
      “Il tuo Parco” association&lt;br /&gt;
|Monitoring Other contact forename=&lt;br /&gt;
      Luca&lt;br /&gt;
|Monitoring Other contact surname=&lt;br /&gt;
      Bruno&lt;br /&gt;
|Supplementary funding information=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Channel pattern/planform&lt;br /&gt;
|Biological quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Physico-chemical quality elements=&lt;br /&gt;
      Nutrient concentrations&lt;br /&gt;
|Specific mitigation=&lt;br /&gt;
      &lt;br /&gt;
|Other motivation=&lt;br /&gt;
      Landscape enhancement&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=embankement renaturalization&lt;br /&gt;
|Floodplain / River corridor=Riparian tree planting&lt;br /&gt;
|Management interventions=Management of paths&lt;br /&gt;
|Social measures=Public green area building&lt;br /&gt;
|Wider stakeholder / citizen engagement=Participation in monitoring&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Ex ante status &amp;quot;Il Rio Tepice nel suo Viaggio verso il Po&amp;quot; Ass. Il tuo Parco&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      &lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image_gallery}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=www.coqblanc.it/public/schedeA3_Chieri_tepice.ppt&lt;br /&gt;
|Description=Presentation of the project actions&lt;br /&gt;
}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9950</id>
		<title>Case study:Rio Tepice urban restoration</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9950"/>
		<updated>2013-04-30T11:06:59Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case_study_status&lt;br /&gt;
|Approval status=&lt;br /&gt;
    &lt;br /&gt;
  &lt;br /&gt;
  &lt;br /&gt;
    &lt;br /&gt;
      Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.01231441444817, 7.816817522179917&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Habitat and biodiversity, Social benefits, Spatial planning&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Guido&lt;br /&gt;
|Main contact surname=Blanchard&lt;br /&gt;
|Contact organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Contact organisation url=www.coqblanc.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Overview.jpg&lt;br /&gt;
|Picture description=The restored stretch of Rio Tepice in the urban area of  Chieri&lt;br /&gt;
|Project summary=This project concerned the restoration of a stretch of Rio Tepice in the urban area of Chieri (TO)throught these kind of actions:&lt;br /&gt;
- restoration (cutting, new plantations with autoctonous species, bioengeneering works)of the riparian vegetation and of the river banks;&lt;br /&gt;
- revegetation of an area of ​​1.08 hectare previously occupied by a manufacturing;&lt;br /&gt;
- creation of new footpaths adjacent to the watercourse&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Tepice&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Rio Tepice in Chieri&lt;br /&gt;
|WFD water body code=0010941pi&lt;br /&gt;
|WFD (national) typology=06SS2T&lt;br /&gt;
|Pre-project morphology=Single channel,High width:depth&lt;br /&gt;
|Reference morphology=Pool-riffle&lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Protected species present=No&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Dominant hydrology=Quick run-off&lt;br /&gt;
|Dominant substrate=Cobble&lt;br /&gt;
|River corridor land use=Urban&lt;br /&gt;
|Average bankfull channel width category=Less than 2 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mn discharge=1.5&lt;br /&gt;
|Avrg channel gradient=0.013&lt;br /&gt;
}}&lt;br /&gt;
{{Project_background&lt;br /&gt;
|Reach length directly affected=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      250 m&lt;br /&gt;
|Project started=&lt;br /&gt;
      1993/03/01&lt;br /&gt;
|Works started=&lt;br /&gt;
      1996/05/01&lt;br /&gt;
|Works completed=&lt;br /&gt;
      1997/12/01&lt;br /&gt;
|Project completed=&lt;br /&gt;
      &lt;br /&gt;
|Total cost category=&lt;br /&gt;
      100 - 500 k€&lt;br /&gt;
|Total1 cost=&lt;br /&gt;
      123 k€&lt;br /&gt;
|Funding sources=&lt;br /&gt;
      Piermonte region,Chieri municiplaity&lt;br /&gt;
|Investigation and design cost category=&lt;br /&gt;
      1 - 10 k€&lt;br /&gt;
|Invst and design cost=&lt;br /&gt;
      7 k€&lt;br /&gt;
|Investigation and design Lead organisation=&lt;br /&gt;
      Studio Blanchard-Gallo&lt;br /&gt;
|Investigation and design Other contact forename=&lt;br /&gt;
      Guido&lt;br /&gt;
|Investigation and design Other contact surname=&lt;br /&gt;
      Blanchard&lt;br /&gt;
|Stakeholder1 engagement cost category=&lt;br /&gt;
      &lt;br /&gt;
|stk engagement cost=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Lead organisation=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Works1 and supervision cost category=&lt;br /&gt;
      100 - 500 k€&lt;br /&gt;
|Wrk and supervision cost=&lt;br /&gt;
      &lt;br /&gt;
|Works and supervision Lead organisation=&lt;br /&gt;
      Studio Blanchard-Gallo&lt;br /&gt;
|Works and supervision Other contact forename=&lt;br /&gt;
      Guido&lt;br /&gt;
|Works and supervision Other contact surname=&lt;br /&gt;
      Blanchard&lt;br /&gt;
|Post-project1 management and maintenance cost category=&lt;br /&gt;
      10 - 50 k€&lt;br /&gt;
|Post-project2 management and maintenance cost=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Lead organisation=&lt;br /&gt;
      Chieri municiplaity&lt;br /&gt;
|Post-project management and maintenance Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring1 cost category=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring2 cost=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring Lead organisation=&lt;br /&gt;
      “Il tuo Parco” association&lt;br /&gt;
|Monitoring Other contact forename=&lt;br /&gt;
      Luca&lt;br /&gt;
|Monitoring Other contact surname=&lt;br /&gt;
      Bruno&lt;br /&gt;
|Supplementary funding information=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Channel pattern/planform&lt;br /&gt;
|Biological quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Physico-chemical quality elements=&lt;br /&gt;
      Nutrient concentrations&lt;br /&gt;
|Specific mitigation=&lt;br /&gt;
      &lt;br /&gt;
|Other motivation=&lt;br /&gt;
      Landscape enhancement&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=embankement renaturalization&lt;br /&gt;
|Floodplain / River corridor=Riparian tree planting&lt;br /&gt;
|Management interventions=Management of paths&lt;br /&gt;
|Social measures=Public green area building&lt;br /&gt;
|Wider stakeholder / citizen engagement=Participation in monitoring&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Ex ante status &amp;quot;Il Rio Tepice nel suo Viaggio verso il Po&amp;quot; Ass. Il tuo Parco&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      &lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image_gallery}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional_links_and_references_header}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9949</id>
		<title>Case study:Rio Tepice urban restoration</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9949"/>
		<updated>2013-04-30T11:06:05Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case_study_status&lt;br /&gt;
|Approval status=&lt;br /&gt;
    &lt;br /&gt;
  &lt;br /&gt;
  &lt;br /&gt;
    &lt;br /&gt;
      Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.01231441444817, 7.816817522179917&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Habitat and biodiversity, Social benefits, Spatial planning&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Guido&lt;br /&gt;
|Main contact surname=Blanchard&lt;br /&gt;
|Contact organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Contact organisation url=www.coqblanc.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Overview.jpg&lt;br /&gt;
|Picture description=The restored stretch of Rio Tepice in the urban area of  Chieri&lt;br /&gt;
|Project summary=This project concerned the restoration of a stretch of Rio Tepice in the urban area of Chieri (TO)throught these kind of actions:&lt;br /&gt;
- restoration (cutting, new plantations with autoctonous species, bioengeneering works)of the riparian vegetation and of the river banks;&lt;br /&gt;
- revegetation of an area of ​​1.08 hectare previously occupied by a manufacturing;&lt;br /&gt;
- creation of new footpaths adjacent to the watercourse&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Tepice&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Rio Tepice in Chieri&lt;br /&gt;
|WFD water body code=&lt;br /&gt;
      0010941pi&lt;br /&gt;
|WFD (national) typology=&lt;br /&gt;
      06SS2T&lt;br /&gt;
|WFD water body name=&lt;br /&gt;
      &lt;br /&gt;
|Pre-project morphology=&lt;br /&gt;
      Single channel,High width:depth&lt;br /&gt;
|Reference morphology=&lt;br /&gt;
      Pool-riffle&lt;br /&gt;
|Heavily modified water body=&lt;br /&gt;
      true&lt;br /&gt;
|Local site designation=&lt;br /&gt;
      &lt;br /&gt;
|Site designation=&lt;br /&gt;
      &lt;br /&gt;
|Protected species present=&lt;br /&gt;
      &lt;br /&gt;
|Invasive species present=&lt;br /&gt;
      &lt;br /&gt;
|Species=&lt;br /&gt;
      &lt;br /&gt;
|Dominant hydrology=&lt;br /&gt;
      Quick run-off&lt;br /&gt;
|Dominant substrate=&lt;br /&gt;
      Cobble&lt;br /&gt;
|River corridor land use=&lt;br /&gt;
      Urban&lt;br /&gt;
|Average bankfull channel width category=&lt;br /&gt;
      Less than 2 m&lt;br /&gt;
|Avrg bankfull channel width=&lt;br /&gt;
      &lt;br /&gt;
|Average bankfull channel depth category=&lt;br /&gt;
      0.5 - 2 m&lt;br /&gt;
|Avrg1 bankfull channel depth=&lt;br /&gt;
      &lt;br /&gt;
|Mean discharge category=&lt;br /&gt;
      &lt;br /&gt;
|Mn discharge=&lt;br /&gt;
      1.5&lt;br /&gt;
|Average channel gradient category=&lt;br /&gt;
      &lt;br /&gt;
|Avrg channel gradient=&lt;br /&gt;
      0.013&lt;br /&gt;
}}&lt;br /&gt;
{{Project_background&lt;br /&gt;
|Reach length directly affected=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      250 m&lt;br /&gt;
|Project started=&lt;br /&gt;
      1993/03/01&lt;br /&gt;
|Works started=&lt;br /&gt;
      1996/05/01&lt;br /&gt;
|Works completed=&lt;br /&gt;
      1997/12/01&lt;br /&gt;
|Project completed=&lt;br /&gt;
      &lt;br /&gt;
|Total cost category=&lt;br /&gt;
      100 - 500 k€&lt;br /&gt;
|Total1 cost=&lt;br /&gt;
      123 k€&lt;br /&gt;
|Funding sources=&lt;br /&gt;
      Piermonte region,Chieri municiplaity&lt;br /&gt;
|Investigation and design cost category=&lt;br /&gt;
      1 - 10 k€&lt;br /&gt;
|Invst and design cost=&lt;br /&gt;
      7 k€&lt;br /&gt;
|Investigation and design Lead organisation=&lt;br /&gt;
      Studio Blanchard-Gallo&lt;br /&gt;
|Investigation and design Other contact forename=&lt;br /&gt;
      Guido&lt;br /&gt;
|Investigation and design Other contact surname=&lt;br /&gt;
      Blanchard&lt;br /&gt;
|Stakeholder1 engagement cost category=&lt;br /&gt;
      &lt;br /&gt;
|stk engagement cost=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Lead organisation=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Works1 and supervision cost category=&lt;br /&gt;
      100 - 500 k€&lt;br /&gt;
|Wrk and supervision cost=&lt;br /&gt;
      &lt;br /&gt;
|Works and supervision Lead organisation=&lt;br /&gt;
      Studio Blanchard-Gallo&lt;br /&gt;
|Works and supervision Other contact forename=&lt;br /&gt;
      Guido&lt;br /&gt;
|Works and supervision Other contact surname=&lt;br /&gt;
      Blanchard&lt;br /&gt;
|Post-project1 management and maintenance cost category=&lt;br /&gt;
      10 - 50 k€&lt;br /&gt;
|Post-project2 management and maintenance cost=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Lead organisation=&lt;br /&gt;
      Chieri municiplaity&lt;br /&gt;
|Post-project management and maintenance Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring1 cost category=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring2 cost=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring Lead organisation=&lt;br /&gt;
      “Il tuo Parco” association&lt;br /&gt;
|Monitoring Other contact forename=&lt;br /&gt;
      Luca&lt;br /&gt;
|Monitoring Other contact surname=&lt;br /&gt;
      Bruno&lt;br /&gt;
|Supplementary funding information=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Channel pattern/planform&lt;br /&gt;
|Biological quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Physico-chemical quality elements=&lt;br /&gt;
      Nutrient concentrations&lt;br /&gt;
|Specific mitigation=&lt;br /&gt;
      &lt;br /&gt;
|Other motivation=&lt;br /&gt;
      Landscape enhancement&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=embankement renaturalization&lt;br /&gt;
|Floodplain / River corridor=Riparian tree planting&lt;br /&gt;
|Management interventions=Management of paths&lt;br /&gt;
|Social measures=Public green area building&lt;br /&gt;
|Wider stakeholder / citizen engagement=Participation in monitoring&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Ex ante status &amp;quot;Il Rio Tepice nel suo Viaggio verso il Po&amp;quot; Ass. Il tuo Parco&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      &lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image_gallery}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional_links_and_references_header}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9948</id>
		<title>Case study:Rio Tepice urban restoration</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9948"/>
		<updated>2013-04-30T11:05:13Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case_study_status&lt;br /&gt;
|Approval status=&lt;br /&gt;
    &lt;br /&gt;
  &lt;br /&gt;
  &lt;br /&gt;
    &lt;br /&gt;
      Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.01231441444817, 7.816817522179917&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Guido&lt;br /&gt;
|Main contact surname=Blanchard&lt;br /&gt;
|Contact organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Contact organisation url=www.coqblanc.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Overview.jpg&lt;br /&gt;
|Picture description=The restored stretch of Rio Tepice in the urban area of  Chieri&lt;br /&gt;
|Project summary=This project concerned the restoration of a stretch of Rio Tepice in the urban area of Chieri (TO)throught these kind of actions:&lt;br /&gt;
- restoration (cutting, new plantations with autoctonous species, bioengeneering works)of the riparian vegetation and of the river banks;&lt;br /&gt;
- revegetation of an area of ​​1.08 hectare previously occupied by a manufacturing;&lt;br /&gt;
- creation of new footpaths adjacent to the watercourse&lt;br /&gt;
&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Tepice&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Rio Tepice in Chieri&lt;br /&gt;
|WFD water body code=&lt;br /&gt;
      0010941pi&lt;br /&gt;
|WFD (national) typology=&lt;br /&gt;
      06SS2T&lt;br /&gt;
|WFD water body name=&lt;br /&gt;
      &lt;br /&gt;
|Pre-project morphology=&lt;br /&gt;
      Single channel,High width:depth&lt;br /&gt;
|Reference morphology=&lt;br /&gt;
      Pool-riffle&lt;br /&gt;
|Heavily modified water body=&lt;br /&gt;
      true&lt;br /&gt;
|Local site designation=&lt;br /&gt;
      &lt;br /&gt;
|Site designation=&lt;br /&gt;
      &lt;br /&gt;
|Protected species present=&lt;br /&gt;
      &lt;br /&gt;
|Invasive species present=&lt;br /&gt;
      &lt;br /&gt;
|Species=&lt;br /&gt;
      &lt;br /&gt;
|Dominant hydrology=&lt;br /&gt;
      Quick run-off&lt;br /&gt;
|Dominant substrate=&lt;br /&gt;
      Cobble&lt;br /&gt;
|River corridor land use=&lt;br /&gt;
      Urban&lt;br /&gt;
|Average bankfull channel width category=&lt;br /&gt;
      Less than 2 m&lt;br /&gt;
|Avrg bankfull channel width=&lt;br /&gt;
      &lt;br /&gt;
|Average bankfull channel depth category=&lt;br /&gt;
      0.5 - 2 m&lt;br /&gt;
|Avrg1 bankfull channel depth=&lt;br /&gt;
      &lt;br /&gt;
|Mean discharge category=&lt;br /&gt;
      &lt;br /&gt;
|Mn discharge=&lt;br /&gt;
      1.5&lt;br /&gt;
|Average channel gradient category=&lt;br /&gt;
      &lt;br /&gt;
|Avrg channel gradient=&lt;br /&gt;
      0.013&lt;br /&gt;
}}&lt;br /&gt;
{{Project_background&lt;br /&gt;
|Reach length directly affected=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      250 m&lt;br /&gt;
|Project started=&lt;br /&gt;
      1993/03/01&lt;br /&gt;
|Works started=&lt;br /&gt;
      1996/05/01&lt;br /&gt;
|Works completed=&lt;br /&gt;
      1997/12/01&lt;br /&gt;
|Project completed=&lt;br /&gt;
      &lt;br /&gt;
|Total cost category=&lt;br /&gt;
      100 - 500 k€&lt;br /&gt;
|Total1 cost=&lt;br /&gt;
      123 k€&lt;br /&gt;
|Funding sources=&lt;br /&gt;
      Piermonte region,Chieri municiplaity&lt;br /&gt;
|Investigation and design cost category=&lt;br /&gt;
      1 - 10 k€&lt;br /&gt;
|Invst and design cost=&lt;br /&gt;
      7 k€&lt;br /&gt;
|Investigation and design Lead organisation=&lt;br /&gt;
      Studio Blanchard-Gallo&lt;br /&gt;
|Investigation and design Other contact forename=&lt;br /&gt;
      Guido&lt;br /&gt;
|Investigation and design Other contact surname=&lt;br /&gt;
      Blanchard&lt;br /&gt;
|Stakeholder1 engagement cost category=&lt;br /&gt;
      &lt;br /&gt;
|stk engagement cost=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Lead organisation=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Works1 and supervision cost category=&lt;br /&gt;
      100 - 500 k€&lt;br /&gt;
|Wrk and supervision cost=&lt;br /&gt;
      &lt;br /&gt;
|Works and supervision Lead organisation=&lt;br /&gt;
      Studio Blanchard-Gallo&lt;br /&gt;
|Works and supervision Other contact forename=&lt;br /&gt;
      Guido&lt;br /&gt;
|Works and supervision Other contact surname=&lt;br /&gt;
      Blanchard&lt;br /&gt;
|Post-project1 management and maintenance cost category=&lt;br /&gt;
      10 - 50 k€&lt;br /&gt;
|Post-project2 management and maintenance cost=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Lead organisation=&lt;br /&gt;
      Chieri municiplaity&lt;br /&gt;
|Post-project management and maintenance Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring1 cost category=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring2 cost=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring Lead organisation=&lt;br /&gt;
      “Il tuo Parco” association&lt;br /&gt;
|Monitoring Other contact forename=&lt;br /&gt;
      Luca&lt;br /&gt;
|Monitoring Other contact surname=&lt;br /&gt;
      Bruno&lt;br /&gt;
|Supplementary funding information=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Channel pattern/planform&lt;br /&gt;
|Biological quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Physico-chemical quality elements=&lt;br /&gt;
      Nutrient concentrations&lt;br /&gt;
|Specific mitigation=&lt;br /&gt;
      &lt;br /&gt;
|Other motivation=&lt;br /&gt;
      Landscape enhancement&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=embankement renaturalization&lt;br /&gt;
|Floodplain / River corridor=Riparian tree planting&lt;br /&gt;
|Management interventions=Management of paths&lt;br /&gt;
|Social measures=Public green area building&lt;br /&gt;
|Wider stakeholder / citizen engagement=Participation in monitoring&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Ex ante status &amp;quot;Il Rio Tepice nel suo Viaggio verso il Po&amp;quot; Ass. Il tuo Parco&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      &lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image_gallery}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional_links_and_references_header}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9947</id>
		<title>Case study:Rio Tepice urban restoration</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9947"/>
		<updated>2013-04-30T10:40:13Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case_study_status&lt;br /&gt;
|Approval status=&lt;br /&gt;
    &lt;br /&gt;
  &lt;br /&gt;
  &lt;br /&gt;
    &lt;br /&gt;
      Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.01231441444817, 7.816817522179917&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Guido&lt;br /&gt;
|Main contact surname=Blanchard&lt;br /&gt;
|Contact organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Contact organisation url=www.coqblanc.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Overview.jpg&lt;br /&gt;
|Picture description=The restored stretch of Rio Tepice in the urban area of  Chieri&lt;br /&gt;
|Project summary=This project concerned the restoration of a stretch of Rio Tepice in the urban area of Chieri (TO)throught these kind of actions:&lt;br /&gt;
- restoration (cutting, new plantations with autoctonous species, bioengeneering works)of the riparian vegetation and of the river banks;&lt;br /&gt;
- revegetation of an area of ​​1.08 hectare previously occupied by a manufacturing;&lt;br /&gt;
- creation of new footpaths adjacent to the watercourse&lt;br /&gt;
&lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_subcatchment&lt;br /&gt;
|Subcatchment=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Tepice&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Rio Tepice in Chieri&lt;br /&gt;
|WFD water body code=&lt;br /&gt;
      0010941pi&lt;br /&gt;
|WFD (national) typology=&lt;br /&gt;
      06SS2T&lt;br /&gt;
|WFD water body name=&lt;br /&gt;
      &lt;br /&gt;
|Pre-project morphology=&lt;br /&gt;
      Single channel,High width:depth&lt;br /&gt;
|Reference morphology=&lt;br /&gt;
      Pool-riffle&lt;br /&gt;
|Heavily modified water body=&lt;br /&gt;
      true&lt;br /&gt;
|Local site designation=&lt;br /&gt;
      &lt;br /&gt;
|Site designation=&lt;br /&gt;
      &lt;br /&gt;
|Protected species present=&lt;br /&gt;
      &lt;br /&gt;
|Invasive species present=&lt;br /&gt;
      &lt;br /&gt;
|Species=&lt;br /&gt;
      &lt;br /&gt;
|Dominant hydrology=&lt;br /&gt;
      Quick run-off&lt;br /&gt;
|Dominant substrate=&lt;br /&gt;
      Cobble&lt;br /&gt;
|River corridor land use=&lt;br /&gt;
      Urban&lt;br /&gt;
|Average bankfull channel width category=&lt;br /&gt;
      Less than 2 m&lt;br /&gt;
|Avrg bankfull channel width=&lt;br /&gt;
      &lt;br /&gt;
|Average bankfull channel depth category=&lt;br /&gt;
      0.5 - 2 m&lt;br /&gt;
|Avrg1 bankfull channel depth=&lt;br /&gt;
      &lt;br /&gt;
|Mean discharge category=&lt;br /&gt;
      &lt;br /&gt;
|Mn discharge=&lt;br /&gt;
      1.5&lt;br /&gt;
|Average channel gradient category=&lt;br /&gt;
      &lt;br /&gt;
|Avrg channel gradient=&lt;br /&gt;
      0.013&lt;br /&gt;
}}&lt;br /&gt;
{{Project_background&lt;br /&gt;
|Reach length directly affected=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      250 m&lt;br /&gt;
|Project started=&lt;br /&gt;
      1993/03/01&lt;br /&gt;
|Works started=&lt;br /&gt;
      1996/05/01&lt;br /&gt;
|Works completed=&lt;br /&gt;
      1997/12/01&lt;br /&gt;
|Project completed=&lt;br /&gt;
      &lt;br /&gt;
|Total cost category=&lt;br /&gt;
      100 - 500 k€&lt;br /&gt;
|Total1 cost=&lt;br /&gt;
      123 k€&lt;br /&gt;
|Funding sources=&lt;br /&gt;
      Piermonte region,Chieri municiplaity&lt;br /&gt;
|Investigation and design cost category=&lt;br /&gt;
      1 - 10 k€&lt;br /&gt;
|Invst and design cost=&lt;br /&gt;
      7 k€&lt;br /&gt;
|Investigation and design Lead organisation=&lt;br /&gt;
      Studio Blanchard-Gallo&lt;br /&gt;
|Investigation and design Other contact forename=&lt;br /&gt;
      Guido&lt;br /&gt;
|Investigation and design Other contact surname=&lt;br /&gt;
      Blanchard&lt;br /&gt;
|Stakeholder1 engagement cost category=&lt;br /&gt;
      &lt;br /&gt;
|stk engagement cost=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Lead organisation=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Works1 and supervision cost category=&lt;br /&gt;
      100 - 500 k€&lt;br /&gt;
|Wrk and supervision cost=&lt;br /&gt;
      &lt;br /&gt;
|Works and supervision Lead organisation=&lt;br /&gt;
      Studio Blanchard-Gallo&lt;br /&gt;
|Works and supervision Other contact forename=&lt;br /&gt;
      Guido&lt;br /&gt;
|Works and supervision Other contact surname=&lt;br /&gt;
      Blanchard&lt;br /&gt;
|Post-project1 management and maintenance cost category=&lt;br /&gt;
      10 - 50 k€&lt;br /&gt;
|Post-project2 management and maintenance cost=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Lead organisation=&lt;br /&gt;
      Chieri municiplaity&lt;br /&gt;
|Post-project management and maintenance Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring1 cost category=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring2 cost=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring Lead organisation=&lt;br /&gt;
      “Il tuo Parco” association&lt;br /&gt;
|Monitoring Other contact forename=&lt;br /&gt;
      Luca&lt;br /&gt;
|Monitoring Other contact surname=&lt;br /&gt;
      Bruno&lt;br /&gt;
|Supplementary funding information=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Channel pattern/planform&lt;br /&gt;
|Biological quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Physico-chemical quality elements=&lt;br /&gt;
      Nutrient concentrations&lt;br /&gt;
|Specific mitigation=&lt;br /&gt;
      &lt;br /&gt;
|Other motivation=&lt;br /&gt;
      Landscape enhancement&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=embankement renaturalization&lt;br /&gt;
|Floodplain / River corridor=Riparian tree planting&lt;br /&gt;
|Management interventions=Management of paths&lt;br /&gt;
|Social measures=Public green area building&lt;br /&gt;
|Wider stakeholder / citizen engagement=Participation in monitoring&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Ex ante status &amp;quot;Il Rio Tepice nel suo Viaggio verso il Po&amp;quot; Ass. Il tuo Parco&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      &lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image_gallery}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional_links_and_references_header}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9946</id>
		<title>Case study:Rio Tepice urban restoration</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Rio_Tepice_urban_restoration&amp;diff=9946"/>
		<updated>2013-04-30T10:37:07Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case_study_status&lt;br /&gt;
|Approval status=&lt;br /&gt;
    &lt;br /&gt;
  &lt;br /&gt;
  &lt;br /&gt;
    &lt;br /&gt;
      Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      45.0044,7.49&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Guido&lt;br /&gt;
|Main contact surname=Blanchard&lt;br /&gt;
|Contact organisation=Studio Blanchard-Gallo&lt;br /&gt;
|Contact organisation url=www.coqblanc.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Overview.jpg&lt;br /&gt;
|Picture description=The restored stretch of Rio Tepice in the urban area of  Chieri&lt;br /&gt;
|Project summary=This project concerned the restoration of a stretch of Rio Tepice in the urban area of Chieri (TO)throught these kind of actions:&lt;br /&gt;
- restoration (cutting, new plantations with autoctonous species, bioengeneering works)of the riparian vegetation and of the river banks;&lt;br /&gt;
- revegetation of an area of ​​1.08 hectare previously occupied by a manufacturing;&lt;br /&gt;
- creation of new footpaths adjacent to the watercourse&lt;br /&gt;
&lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_subcatchment&lt;br /&gt;
|Subcatchment=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Tepice&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Rio Tepice in Chieri&lt;br /&gt;
|WFD water body code=&lt;br /&gt;
      0010941pi&lt;br /&gt;
|WFD (national) typology=&lt;br /&gt;
      06SS2T&lt;br /&gt;
|WFD water body name=&lt;br /&gt;
      &lt;br /&gt;
|Pre-project morphology=&lt;br /&gt;
      Single channel,High width:depth&lt;br /&gt;
|Reference morphology=&lt;br /&gt;
      Pool-riffle&lt;br /&gt;
|Heavily modified water body=&lt;br /&gt;
      true&lt;br /&gt;
|Local site designation=&lt;br /&gt;
      &lt;br /&gt;
|Site designation=&lt;br /&gt;
      &lt;br /&gt;
|Protected species present=&lt;br /&gt;
      &lt;br /&gt;
|Invasive species present=&lt;br /&gt;
      &lt;br /&gt;
|Species=&lt;br /&gt;
      &lt;br /&gt;
|Dominant hydrology=&lt;br /&gt;
      Quick run-off&lt;br /&gt;
|Dominant substrate=&lt;br /&gt;
      Cobble&lt;br /&gt;
|River corridor land use=&lt;br /&gt;
      Urban&lt;br /&gt;
|Average bankfull channel width category=&lt;br /&gt;
      Less than 2 m&lt;br /&gt;
|Avrg bankfull channel width=&lt;br /&gt;
      &lt;br /&gt;
|Average bankfull channel depth category=&lt;br /&gt;
      0.5 - 2 m&lt;br /&gt;
|Avrg1 bankfull channel depth=&lt;br /&gt;
      &lt;br /&gt;
|Mean discharge category=&lt;br /&gt;
      &lt;br /&gt;
|Mn discharge=&lt;br /&gt;
      1.5&lt;br /&gt;
|Average channel gradient category=&lt;br /&gt;
      &lt;br /&gt;
|Avrg channel gradient=&lt;br /&gt;
      0.013&lt;br /&gt;
}}&lt;br /&gt;
{{Project_background&lt;br /&gt;
|Reach length directly affected=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      250 m&lt;br /&gt;
|Project started=&lt;br /&gt;
      1993/03/01&lt;br /&gt;
|Works started=&lt;br /&gt;
      1996/05/01&lt;br /&gt;
|Works completed=&lt;br /&gt;
      1997/12/01&lt;br /&gt;
|Project completed=&lt;br /&gt;
      &lt;br /&gt;
|Total cost category=&lt;br /&gt;
      100 - 500 k€&lt;br /&gt;
|Total1 cost=&lt;br /&gt;
      123 k€&lt;br /&gt;
|Funding sources=&lt;br /&gt;
      Piermonte region,Chieri municiplaity&lt;br /&gt;
|Investigation and design cost category=&lt;br /&gt;
      1 - 10 k€&lt;br /&gt;
|Invst and design cost=&lt;br /&gt;
      7 k€&lt;br /&gt;
|Investigation and design Lead organisation=&lt;br /&gt;
      Studio Blanchard-Gallo&lt;br /&gt;
|Investigation and design Other contact forename=&lt;br /&gt;
      Guido&lt;br /&gt;
|Investigation and design Other contact surname=&lt;br /&gt;
      Blanchard&lt;br /&gt;
|Stakeholder1 engagement cost category=&lt;br /&gt;
      &lt;br /&gt;
|stk engagement cost=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Lead organisation=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Stakeholder engagement Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Works1 and supervision cost category=&lt;br /&gt;
      100 - 500 k€&lt;br /&gt;
|Wrk and supervision cost=&lt;br /&gt;
      &lt;br /&gt;
|Works and supervision Lead organisation=&lt;br /&gt;
      Studio Blanchard-Gallo&lt;br /&gt;
|Works and supervision Other contact forename=&lt;br /&gt;
      Guido&lt;br /&gt;
|Works and supervision Other contact surname=&lt;br /&gt;
      Blanchard&lt;br /&gt;
|Post-project1 management and maintenance cost category=&lt;br /&gt;
      10 - 50 k€&lt;br /&gt;
|Post-project2 management and maintenance cost=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Lead organisation=&lt;br /&gt;
      Chieri municiplaity&lt;br /&gt;
|Post-project management and maintenance Other contact forename=&lt;br /&gt;
      &lt;br /&gt;
|Post-project management and maintenance Other contact surname=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring1 cost category=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring2 cost=&lt;br /&gt;
      &lt;br /&gt;
|Monitoring Lead organisation=&lt;br /&gt;
      “Il tuo Parco” association&lt;br /&gt;
|Monitoring Other contact forename=&lt;br /&gt;
      Luca&lt;br /&gt;
|Monitoring Other contact surname=&lt;br /&gt;
      Bruno&lt;br /&gt;
|Supplementary funding information=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Hydromorphological quality elements=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Channel pattern/planform&lt;br /&gt;
|Biological quality elements=&lt;br /&gt;
      &lt;br /&gt;
|Physico-chemical quality elements=&lt;br /&gt;
      Nutrient concentrations&lt;br /&gt;
|Specific mitigation=&lt;br /&gt;
      &lt;br /&gt;
|Other motivation=&lt;br /&gt;
      Landscape enhancement&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=embankement renaturalization&lt;br /&gt;
|Floodplain / River corridor=Riparian tree planting&lt;br /&gt;
|Management interventions=Management of paths&lt;br /&gt;
|Social measures=Public green area building&lt;br /&gt;
|Wider stakeholder / citizen engagement=Participation in monitoring&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological_quality_elements_header}}&lt;br /&gt;
{{Hydromorphological_quality_element_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Structure &amp;amp; condition of riparian zones&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      Yes&lt;br /&gt;
|Monitored after=&lt;br /&gt;
      Yes&lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      Yes&lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Biological_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Physico-chemical_quality_elements_header}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Other_responses_header}}&lt;br /&gt;
{{Other_response_table_row&lt;br /&gt;
|Element=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      Ex ante status &amp;quot;Il Rio Tepice nel suo Viaggio verso il Po&amp;quot; Ass. Il tuo Parco&lt;br /&gt;
|Monitored before=&lt;br /&gt;
      &lt;br /&gt;
|Monitored after=&lt;br /&gt;
      &lt;br /&gt;
|Qualitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Quantitative monitoring=&lt;br /&gt;
      &lt;br /&gt;
|Control site used=&lt;br /&gt;
      &lt;br /&gt;
|Result=&lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{End_table}}&lt;br /&gt;
{{Monitoring_documents}}&lt;br /&gt;
{{Monitoring_documents_end}}&lt;br /&gt;
{{Image_gallery}}&lt;br /&gt;
{{Image_gallery_end}}&lt;br /&gt;
{{Additional_Documents}}&lt;br /&gt;
{{Additional_Documents_end}}&lt;br /&gt;
{{Additional_links_and_references_header}}&lt;br /&gt;
{{Additional_links_and_references_footer}}&lt;br /&gt;
{{Supplementary_Information&lt;br /&gt;
|Information=&lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
    &lt;br /&gt;
      &lt;br /&gt;
}}&lt;br /&gt;
{{Case_study_upload}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:Overview.jpg&amp;diff=9945</id>
		<title>File:Overview.jpg</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:Overview.jpg&amp;diff=9945"/>
		<updated>2013-04-30T10:19:15Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9522</id>
		<title>Case study:Salzano wetland and Marzenego river restoration project</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9522"/>
		<updated>2013-04-03T15:00:26Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.53392318370854, 12.131361008214299&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Land use management - forestry, Monitoring, Social benefits, Water quality&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Paolo&lt;br /&gt;
|Main contact surname=Cornelio&lt;br /&gt;
|Contact organisation=Consorzio di Bonifica Acque Risorgive&lt;br /&gt;
|Contact organisation url=www.acquerisorgive.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=IMG 8228web.jpg&lt;br /&gt;
|Picture description=Salzano wetland after restoration&lt;br /&gt;
|Project summary=In order to reduce eutrophication problems that severely impair the quality of the Venice lagoon waters, the local government&lt;br /&gt;
(the Veneto Region Authority), more than a decade ago,established a series of targets for the the reduction of nutrients that&lt;br /&gt;
flow into the lagoon. As a detailed example, The “Salzano wetland” restoration was completed by the consortium which was, until the mid-1980s, subject to mining of clay. Since this period this 60 ha site has gradually been restored. Today this site is characterized by a mosaic of habitats of different spatial extent. The main actions of the project were:&lt;br /&gt;
a)to create a system of new banks around a dry and with low ecological value portion (20 ha wide) of the extent wetland, and later to connect this area with the adjacent watercourse using gates to manage flows; b)reshaping the net of canals, ponds and pools inside this area to find the optimal residual time of the water to assure an efficient nutrient reduction; c)re-establish rare and endangered aquatic vegetation types (Carex elata, Cladium mariscus, Allium angulosum, Cirsium canum, Senecio paludosus, Typha laxmannii, Iris pseudacorus and Nuphar luteum) and monitor their development; d)create a new net of small channels to connect this restored wetland to the other portions; e)create a net of path and observation structures accessible to the public for recreation, educational and technical-scientific purposes.&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Bacino scolante della laguna di Venezia&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Salzano wetland and Marzenego river&lt;br /&gt;
|WFD water body code=666_10&lt;br /&gt;
|WFD water body name=MARZENEGO - OSELLINO (DIRAM.)&lt;br /&gt;
|Pre-project morphology=Artificial channel,&lt;br /&gt;
|Reference morphology=Low gradient passively meandering,&lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Site designation=Italy - Siti di Importanza Comunitaria&lt;br /&gt;
|Local site designation=SIC IT3250008&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Species=Carex elata, Cladium mariscus, Allium angulosum, Cirsium canum, Senecio paludosus, Typha laxmannii, Iris pseudacorus and Nuphar luteum&lt;br /&gt;
|Dominant hydrology=Artificially regulated,&lt;br /&gt;
|River corridor land use=Intensive agriculture (arable),&lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mean discharge category=1 - 10 m³/s&lt;br /&gt;
|Average channel gradient category=0.001 - 0.01&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Project started=2007&lt;br /&gt;
|Project completed=2009/10/01&lt;br /&gt;
|Total cost category=1000 - 5000 k€&lt;br /&gt;
|Total1 cost=2,714&lt;br /&gt;
|Funding sources= 	Veneto Region - “Piano per la prevenzione dell’inquinamento ed il risanamento delle acque del bacino idrografico immediatamente sversante in Laguna – Piano Direttore 2000” &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Nutrient removal to reduce eutrophication, reduce flood risk, increase lost biodiversity&lt;br /&gt;
|Hydromorphological quality elements=Reconnect river to an out-flow wetland and create a more natural morphology inseide the wetland&lt;br /&gt;
|Biological quality elements=Increase ecological status of Macrophytes&lt;br /&gt;
|Physico-chemical quality elements=Reduce Nitrogen, Phosphorous and Organic pollution&lt;br /&gt;
|Other motivation=Increase fruition and biodiversity in general&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=Reshaping the net of canals, ponds and pools inside the wetland&lt;br /&gt;
|Floodplain / River corridor=Hydraulic connection between the river and an outflow wetland&lt;br /&gt;
|Other technical measure=re-establish rare and endangered aquatic vegetation types&lt;br /&gt;
|Social measures=create a net of path and observation structures accessible to the public for recreation, educational and technical-scientific purposes&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{Physico-chemical quality element table row&lt;br /&gt;
|Element=Nutrient concentrations&lt;br /&gt;
|Monitored before=No&lt;br /&gt;
|Monitored after=Yes&lt;br /&gt;
|Qualitative monitoring=No&lt;br /&gt;
|Quantitative monitoring=Yes&lt;br /&gt;
|Control site used=No&lt;br /&gt;
}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Case study monitoring documents&lt;br /&gt;
|Monitoring document=RELAZIONE SALZANO 03-2-2011 Sintesi risultati.pdf&lt;br /&gt;
|Description=Monitoring of nutrient removal in Salzano wetland_Shyntesis of results (in Italian)&lt;br /&gt;
}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Map of Salzano OK.jpg&lt;br /&gt;
|Caption=Map of Salzano wetland&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Panoramic view of Salzano.JPG&lt;br /&gt;
|Caption=View of Salzano wetland after restoration&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Inlet point.jpg&lt;br /&gt;
|Caption=Inlet point&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Salzano.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=http://http://www.acquerisorgive.it/page.asp?m=18&lt;br /&gt;
|Description= 	A website section dedicated to river restoration projects, studies and monitoring results by Consorzio Acque Risorgive &lt;br /&gt;
}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9521</id>
		<title>Case study:Salzano wetland and Marzenego river restoration project</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9521"/>
		<updated>2013-04-03T14:59:34Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.53392318370854, 12.131361008214299&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Land use management - forestry, Monitoring, Social benefits, Water quality&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Paolo&lt;br /&gt;
|Main contact surname=Cornelio&lt;br /&gt;
|Contact organisation=Consorzio di Bonifica Acque Risorgive&lt;br /&gt;
|Contact organisation url=www.acquerisorgive.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=IMG 8228web.jpg&lt;br /&gt;
|Picture description=Salzano wetland after restoration&lt;br /&gt;
|Project summary=In order to reduce eutrophication problems that severely impair the quality of the Venice lagoon waters, the local government&lt;br /&gt;
(the Veneto Region Authority), more than a decade ago,established a series of targets for the the reduction of nutrients that&lt;br /&gt;
flow into the lagoon. As a detailed example, The “Salzano wetland” restoration was completed by the consortium which was, until the mid-1980s, subject to mining of clay. Since this period this 60 ha site has gradually been restored. Today this site is characterized by a mosaic of habitats of different spatial extent. The main actions of the project were:&lt;br /&gt;
a)to create a system of new banks around a dry and with low ecological value portion (20 ha wide) of the extent wetland, and later to connect this area with the adjacent watercourse using gates to manage flows; b)reshaping the net of canals, ponds and pools inside this area to find the optimal residual time of the water to assure an efficient nutrient reduction; c)re-establish rare and endangered aquatic vegetation types (Carex elata, Cladium mariscus, Allium angulosum, Cirsium canum, Senecio paludosus, Typha laxmannii, Iris pseudacorus and Nuphar luteum) and monitor their development; d)create a new net of small channels to connect this restored wetland to the other portions; e)create a net of path and observation structures accessible to the public for recreation, educational and technical-scientific purposes.&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Bacino scolante della laguna di Venezia&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Salzano wetland and Marzenego river&lt;br /&gt;
|WFD water body code=666_10&lt;br /&gt;
|WFD water body name=MARZENEGO - OSELLINO (DIRAM.)&lt;br /&gt;
|Pre-project morphology=Artificial channel, &lt;br /&gt;
|Reference morphology=Low gradient passively meandering, &lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Site designation=Italy - Siti di Importanza Comunitaria&lt;br /&gt;
|Local site designation=SIC IT3250008&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Dominant hydrology=Artificially regulated, &lt;br /&gt;
|River corridor land use=Intensive agriculture (arable), &lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mean discharge category=1 - 10 m³/s&lt;br /&gt;
|Average channel gradient category=0.001 - 0.01&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Project started=2007&lt;br /&gt;
|Project completed=2009/10/01&lt;br /&gt;
|Total cost category=1000 - 5000 k€&lt;br /&gt;
|Total1 cost=2,714&lt;br /&gt;
|Funding sources= 	Veneto Region - “Piano per la prevenzione dell’inquinamento ed il risanamento delle acque del bacino idrografico immediatamente sversante in Laguna – Piano Direttore 2000” &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Nutrient removal to reduce eutrophication, reduce flood risk, increase lost biodiversity&lt;br /&gt;
|Hydromorphological quality elements=Reconnect river to an out-flow wetland and create a more natural morphology inseide the wetland&lt;br /&gt;
|Biological quality elements=Increase ecological status of Macrophytes&lt;br /&gt;
|Physico-chemical quality elements=Reduce Nitrogen, Phosphorous and Organic pollution&lt;br /&gt;
|Other motivation=Increase fruition and biodiversity in general&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=Reshaping the net of canals, ponds and pools inside the wetland&lt;br /&gt;
|Floodplain / River corridor=Hydraulic connection between the river and an outflow wetland&lt;br /&gt;
|Other technical measure=re-establish rare and endangered aquatic vegetation types&lt;br /&gt;
|Social measures=create a net of path and observation structures accessible to the public for recreation, educational and technical-scientific purposes&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{Physico-chemical quality element table row&lt;br /&gt;
|Element=Nutrient concentrations&lt;br /&gt;
|Monitored before=No&lt;br /&gt;
|Monitored after=Yes&lt;br /&gt;
|Qualitative monitoring=No&lt;br /&gt;
|Quantitative monitoring=Yes&lt;br /&gt;
|Control site used=No&lt;br /&gt;
}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Case study monitoring documents&lt;br /&gt;
|Monitoring document=RELAZIONE SALZANO 03-2-2011 Sintesi risultati.pdf&lt;br /&gt;
|Description=Monitoring of nutrient removal in Salzano wetland_Shyntesis of results (in Italian)&lt;br /&gt;
}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Map of Salzano OK.jpg&lt;br /&gt;
|Caption=Map of Salzano wetland&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Panoramic view of Salzano.JPG&lt;br /&gt;
|Caption=View of Salzano wetland after restoration&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Inlet point.jpg&lt;br /&gt;
|Caption=Inlet point&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Salzano.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=http://http://www.acquerisorgive.it/page.asp?m=18&lt;br /&gt;
|Description= 	A website section dedicated to river restoration projects, studies and monitoring results by Consorzio Acque Risorgive &lt;br /&gt;
}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:Salzano.jpg&amp;diff=9520</id>
		<title>File:Salzano.jpg</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:Salzano.jpg&amp;diff=9520"/>
		<updated>2013-04-03T14:59:28Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:Inlet_point.jpg&amp;diff=9519</id>
		<title>File:Inlet point.jpg</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:Inlet_point.jpg&amp;diff=9519"/>
		<updated>2013-04-03T14:58:54Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:Panoramic_view_of_Salzano.JPG&amp;diff=9518</id>
		<title>File:Panoramic view of Salzano.JPG</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:Panoramic_view_of_Salzano.JPG&amp;diff=9518"/>
		<updated>2013-04-03T14:58:25Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:Map_of_Salzano_OK.jpg&amp;diff=9517</id>
		<title>File:Map of Salzano OK.jpg</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:Map_of_Salzano_OK.jpg&amp;diff=9517"/>
		<updated>2013-04-03T14:57:29Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9516</id>
		<title>Case study:Salzano wetland and Marzenego river restoration project</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9516"/>
		<updated>2013-04-03T14:41:58Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.53392318370854, 12.131361008214299&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Land use management - forestry, Monitoring, Social benefits, Water quality&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Paolo&lt;br /&gt;
|Main contact surname=Cornelio&lt;br /&gt;
|Contact organisation=Consorzio di Bonifica Acque Risorgive&lt;br /&gt;
|Contact organisation url=www.acquerisorgive.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=IMG 8228web.jpg&lt;br /&gt;
|Picture description=Salzano wetland after restoration&lt;br /&gt;
|Project summary=In order to reduce eutrophication problems that severely impair the quality of the Venice lagoon waters, the local government&lt;br /&gt;
(the Veneto Region Authority), more than a decade ago,established a series of targets for the the reduction of nutrients that&lt;br /&gt;
flow into the lagoon. As a detailed example, The “Salzano wetland” restoration was completed by the consortium which was, until the mid-1980s, subject to mining of clay. Since this period this 60 ha site has gradually been restored. Today this site is characterized by a mosaic of habitats of different spatial extent. The main actions of the project were:&lt;br /&gt;
a)to create a system of new banks around a dry and with low ecological value portion (20 ha wide) of the extent wetland, and later to connect this area with the adjacent watercourse using gates to manage flows; b)reshaping the net of canals, ponds and pools inside this area to find the optimal residual time of the water to assure an efficient nutrient reduction; c)re-establish rare and endangered aquatic vegetation types (Carex elata, Cladium mariscus, Allium angulosum, Cirsium canum, Senecio paludosus, Typha laxmannii, Iris pseudacorus and Nuphar luteum) and monitor their development; d)create a new net of small channels to connect this restored wetland to the other portions; e)create a net of path and observation structures accessible to the public for recreation, educational and technical-scientific purposes.&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Bacino scolante della laguna di Venezia&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Salzano wetland and Marzenego river&lt;br /&gt;
|WFD water body code=666_10&lt;br /&gt;
|WFD water body name=MARZENEGO - OSELLINO (DIRAM.)&lt;br /&gt;
|Pre-project morphology=Artificial channel, &lt;br /&gt;
|Reference morphology=Low gradient passively meandering, &lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Site designation=Italy - Siti di Importanza Comunitaria&lt;br /&gt;
|Local site designation=SIC IT3250008&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Dominant hydrology=Artificially regulated, &lt;br /&gt;
|River corridor land use=Intensive agriculture (arable), &lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mean discharge category=1 - 10 m³/s&lt;br /&gt;
|Average channel gradient category=0.001 - 0.01&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Project started=2007&lt;br /&gt;
|Project completed=2009/10/01&lt;br /&gt;
|Total cost category=1000 - 5000 k€&lt;br /&gt;
|Total1 cost=2,714&lt;br /&gt;
|Funding sources= 	Veneto Region - “Piano per la prevenzione dell’inquinamento ed il risanamento delle acque del bacino idrografico immediatamente sversante in Laguna – Piano Direttore 2000” &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Nutrient removal to reduce eutrophication, reduce flood risk, increase lost biodiversity&lt;br /&gt;
|Hydromorphological quality elements=Reconnect river to an out-flow wetland and create a more natural morphology inseide the wetland&lt;br /&gt;
|Biological quality elements=Increase ecological status of Macrophytes&lt;br /&gt;
|Physico-chemical quality elements=Reduce Nitrogen, Phosphorous and Organic pollution&lt;br /&gt;
|Other motivation=Increase fruition and biodiversity in general&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=Reshaping the net of canals, ponds and pools inside the wetland&lt;br /&gt;
|Floodplain / River corridor=Hydraulic connection between the river and an outflow wetland&lt;br /&gt;
|Other technical measure=re-establish rare and endangered aquatic vegetation types&lt;br /&gt;
|Social measures=create a net of path and observation structures accessible to the public for recreation, educational and technical-scientific purposes&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{Physico-chemical quality element table row&lt;br /&gt;
|Element=Nutrient concentrations&lt;br /&gt;
|Monitored before=No&lt;br /&gt;
|Monitored after=Yes&lt;br /&gt;
|Qualitative monitoring=No&lt;br /&gt;
|Quantitative monitoring=Yes&lt;br /&gt;
|Control site used=No&lt;br /&gt;
}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Case study monitoring documents&lt;br /&gt;
|Monitoring document=RELAZIONE SALZANO 03-2-2011 Sintesi risultati.pdf&lt;br /&gt;
|Description=Monitoring of nutrient removal in Salzano wetland_Shyntesis of results (in Italian)&lt;br /&gt;
}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=http://http://www.acquerisorgive.it/page.asp?m=18&lt;br /&gt;
|Description= 	A website section dedicated to river restoration projects, studies and monitoring results by Consorzio Acque Risorgive &lt;br /&gt;
}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9515</id>
		<title>Case study:Salzano wetland and Marzenego river restoration project</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9515"/>
		<updated>2013-04-03T14:41:11Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.53392318370854, 12.131361008214299&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Land use management - forestry, Monitoring, Social benefits, Water quality&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Paolo&lt;br /&gt;
|Main contact surname=Cornelio&lt;br /&gt;
|Contact organisation=Consorzio di Bonifica Acque Risorgive&lt;br /&gt;
|Contact organisation url=www.acquerisorgive.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=IMG 8228web.jpg&lt;br /&gt;
|Picture description=Salzano wetland after restoration&lt;br /&gt;
|Project summary=In order to reduce eutrophication problems that severely impair the quality of the Venice lagoon waters, the local government&lt;br /&gt;
(the Veneto Region Authority), more than a decade ago,established a series of targets for the the reduction of nutrients that&lt;br /&gt;
flow into the lagoon. As a detailed example, The “Salzano wetland” restoration was completed by the consortium which was, until the mid-1980s, subject to mining of clay. Since this period this 60 ha site has gradually been restored. Today this site is characterized by a mosaic of habitats of different spatial extent. The main actions of the project were:&lt;br /&gt;
a)to create a system of new banks around a dry and with low ecological value portion (20 ha wide) of the extent wetland, and later to connect this area with the adjacent watercourse using gates to manage flows; b)reshaping the net of canals, ponds and pools inside this area to find the optimal residual time of the water to assure an efficient nutrient reduction; c)re-establish rare and endangered aquatic vegetation types (Carex elata, Cladium mariscus, Allium angulosum, Cirsium canum, Senecio paludosus, Typha laxmannii, Iris pseudacorus and Nuphar luteum) and monitor their development; d)create a new net of small channels to connect this restored wetland to the other portions; e)create a net of path and observation structures accessible to the public for recreation, educational and technical-scientific purposes.&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Bacino scolante della laguna di Venezia&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Salzano wetland and Marzenego river&lt;br /&gt;
|WFD water body code=666_10&lt;br /&gt;
|WFD water body name=MARZENEGO - OSELLINO (DIRAM.)&lt;br /&gt;
|Pre-project morphology=Artificial channel, &lt;br /&gt;
|Reference morphology=Low gradient passively meandering, &lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Site designation=Italy - Siti di Importanza Comunitaria&lt;br /&gt;
|Local site designation=SIC IT3250008&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Dominant hydrology=Artificially regulated, &lt;br /&gt;
|River corridor land use=Intensive agriculture (arable), &lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mean discharge category=1 - 10 m³/s&lt;br /&gt;
|Average channel gradient category=0.001 - 0.01&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Project started=2007&lt;br /&gt;
|Project completed=2009/10/01&lt;br /&gt;
|Total cost category=1000 - 5000 k€&lt;br /&gt;
|Total1 cost=2,714&lt;br /&gt;
|Funding sources= 	Veneto Region - “Piano per la prevenzione dell’inquinamento ed il risanamento delle acque del bacino idrografico immediatamente sversante in Laguna – Piano Direttore 2000” &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Nutrient removal to reduce eutrophication, reduce flood risk, increase lost biodiversity&lt;br /&gt;
|Hydromorphological quality elements=Reconnect river to an out-flow wetland and create a more natural morphology inseide the wetland&lt;br /&gt;
|Biological quality elements=Increase ecological status of Macrophytes&lt;br /&gt;
|Physico-chemical quality elements=Reduce Nitrogen, Phosphorous and Organic pollution&lt;br /&gt;
|Other motivation=Increase fruition and biodiversity in general&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=Reshaping the net of canals, ponds and pools inside the wetland&lt;br /&gt;
|Floodplain / River corridor=Hydraulic connection between the river and an outflow wetland&lt;br /&gt;
|Other technical measure=re-establish rare and endangered aquatic vegetation types&lt;br /&gt;
|Social measures=create a net of path and observation structures accessible to the public for recreation, educational and technical-scientific purposes&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{Physico-chemical quality element table row&lt;br /&gt;
|Element=Nutrient concentrations&lt;br /&gt;
|Monitored before=No&lt;br /&gt;
|Monitored after=Yes&lt;br /&gt;
|Qualitative monitoring=No&lt;br /&gt;
|Quantitative monitoring=Yes&lt;br /&gt;
|Control site used=No&lt;br /&gt;
}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Case study monitoring documents&lt;br /&gt;
|Monitoring document=RELAZIONE SALZANO 03-2-2011 Sintesi risultati.pdf&lt;br /&gt;
|Description=Monitoring of nutrient removal in Salzano wetland_Shyntesis of results (in Italian)&lt;br /&gt;
}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:RELAZIONE_SALZANO_03-2-2011_Sintesi_risultati.pdf&amp;diff=9514</id>
		<title>File:RELAZIONE SALZANO 03-2-2011 Sintesi risultati.pdf</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:RELAZIONE_SALZANO_03-2-2011_Sintesi_risultati.pdf&amp;diff=9514"/>
		<updated>2013-04-03T14:40:11Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9513</id>
		<title>Case study:Salzano wetland and Marzenego river restoration project</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9513"/>
		<updated>2013-04-03T14:05:11Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.53392318370854, 12.131361008214299&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Land use management - forestry, Monitoring, Social benefits, Water quality&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Paolo&lt;br /&gt;
|Main contact surname=Cornelio&lt;br /&gt;
|Contact organisation=Consorzio di Bonifica Acque Risorgive&lt;br /&gt;
|Contact organisation url=www.acquerisorgive.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=IMG 8228web.jpg&lt;br /&gt;
|Picture description=Salzano wetland after restoration&lt;br /&gt;
|Project summary=In order to reduce eutrophication problems that severely impair the quality of the Venice lagoon waters, the local government&lt;br /&gt;
(the Veneto Region Authority), more than a decade ago,established a series of targets for the the reduction of nutrients that&lt;br /&gt;
flow into the lagoon. As a detailed example, The “Salzano wetland” restoration was completed by the consortium which was, until the mid-1980s, subject to mining of clay. Since this period this 60 ha site has gradually been restored. Today this site is characterized by a mosaic of habitats of different spatial extent. The main actions of the project were:&lt;br /&gt;
a)to create a system of new banks around a dry and with low ecological value portion (20 ha wide) of the extent wetland, and later to connect this area with the adjacent watercourse using gates to manage flows; b)reshaping the net of canals, ponds and pools inside this area to find the optimal residual time of the water to assure an efficient nutrient reduction; c)re-establish rare and endangered aquatic vegetation types (Carex elata, Cladium mariscus, Allium angulosum, Cirsium canum, Senecio paludosus, Typha laxmannii, Iris pseudacorus and Nuphar luteum) and monitor their development; d)create a new net of small channels to connect this restored wetland to the other portions; e)create a net of path and observation structures accessible to the public for recreation, educational and technical-scientific purposes.&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Bacino scolante della laguna di Venezia&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Salzano wetland and Marzenego river&lt;br /&gt;
|WFD water body code=666_10&lt;br /&gt;
|WFD water body name=MARZENEGO - OSELLINO (DIRAM.)&lt;br /&gt;
|Pre-project morphology=Artificial channel, &lt;br /&gt;
|Reference morphology=Low gradient passively meandering, &lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Site designation=Italy - Siti di Importanza Comunitaria&lt;br /&gt;
|Local site designation=SIC IT3250008&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Dominant hydrology=Artificially regulated, &lt;br /&gt;
|River corridor land use=Intensive agriculture (arable), &lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mean discharge category=1 - 10 m³/s&lt;br /&gt;
|Average channel gradient category=0.001 - 0.01&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Project started=2007&lt;br /&gt;
|Project completed=2009/10/01&lt;br /&gt;
|Total cost category=1000 - 5000 k€&lt;br /&gt;
|Total1 cost=2,714&lt;br /&gt;
|Funding sources= 	Veneto Region - “Piano per la prevenzione dell’inquinamento ed il risanamento delle acque del bacino idrografico immediatamente sversante in Laguna – Piano Direttore 2000” &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Nutrient removal to reduce eutrophication, reduce flood risk, increase lost biodiversity&lt;br /&gt;
|Hydromorphological quality elements=Reconnect river to an out-flow wetland and create a more natural morphology inseide the wetland&lt;br /&gt;
|Biological quality elements=Increase ecological status of Macrophytes&lt;br /&gt;
|Physico-chemical quality elements=Reduce Nitrogen, Phosphorous and Organic pollution&lt;br /&gt;
|Other motivation=Increase fruition and biodiversity in general&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=Reshaping the net of canals, ponds and pools inside the wetland&lt;br /&gt;
|Floodplain / River corridor=Hydraulic connection between the river and an outflow wetland&lt;br /&gt;
|Other technical measure=re-establish rare and endangered aquatic vegetation types&lt;br /&gt;
|Social measures=create a net of path and observation structures accessible to the public for recreation, educational and technical-scientific purposes&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{Physico-chemical quality element table row&lt;br /&gt;
|Element=Nutrient concentrations&lt;br /&gt;
|Monitored before=No&lt;br /&gt;
|Monitored after=Yes&lt;br /&gt;
|Qualitative monitoring=No&lt;br /&gt;
|Quantitative monitoring=Yes&lt;br /&gt;
|Control site used=No&lt;br /&gt;
}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9512</id>
		<title>Case study:Salzano wetland and Marzenego river restoration project</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9512"/>
		<updated>2013-04-03T14:04:03Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.53392318370854, 12.131361008214299&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Land use management - forestry, Monitoring, Social benefits, Water quality&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Paolo&lt;br /&gt;
|Main contact surname=Cornelio&lt;br /&gt;
|Contact organisation=Consorzio di Bonifica Acque Risorgive&lt;br /&gt;
|Contact organisation url=www.acquerisorgive.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=IMG 8228web.jpg&lt;br /&gt;
|Picture description=Salzano wetland after restoration&lt;br /&gt;
|Project summary=In order to reduce eutrophication problems that severely impair the quality of the Venice lagoon waters, the local government&lt;br /&gt;
(the Veneto Region Authority), more than a decade ago,established a series of targets for the the reduction of nutrients that&lt;br /&gt;
flow into the lagoon. As a detailed example, The “Salzano wetland” restoration was completed by the consortium which was, until the mid-1980s, subject to mining of clay. Since this period this 60 ha site has gradually been restored. Today this site is characterized by a mosaic of habitats of different spatial extent. The main actions of the project were:&lt;br /&gt;
a)to create a system of new banks around a dry and with low ecological value portion (20 ha wide) of the extent wetland, and later to connect this area with the adjacent watercourse using gates to manage flows; b)reshaping the net of canals, ponds and pools inside this area to find the optimal residual time of the water to assure an efficient nutrient reduction; c)re-establish rare and endangered aquatic vegetation types (Carex elata, Cladium mariscus, Allium angulosum, Cirsium canum, Senecio paludosus, Typha laxmannii, Iris pseudacorus and Nuphar luteum) and monitor their development; d)create a new net of small channels to connect this restored wetland to the other portions; e)create a net of path and observation structures accessible to the public for recreation, educational and technical-scientific purposes.&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Bacino scolante della laguna di Venezia&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Salzano wetland and Marzenego river&lt;br /&gt;
|WFD water body code=666_10&lt;br /&gt;
|WFD water body name=MARZENEGO - OSELLINO (DIRAM.)&lt;br /&gt;
|Pre-project morphology=Artificial channel, &lt;br /&gt;
|Reference morphology=Low gradient passively meandering, &lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Site designation=Italy - Siti di Importanza Comunitaria&lt;br /&gt;
|Local site designation=SIC IT3250008&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Dominant hydrology=Artificially regulated, &lt;br /&gt;
|River corridor land use=Intensive agriculture (arable), &lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mean discharge category=1 - 10 m³/s&lt;br /&gt;
|Average channel gradient category=0.001 - 0.01&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Project started=2007&lt;br /&gt;
|Project completed=2009/10/01&lt;br /&gt;
|Total cost category=1000 - 5000 k€&lt;br /&gt;
|Total1 cost=2,714&lt;br /&gt;
|Funding sources= 	Veneto Region - “Piano per la prevenzione dell’inquinamento ed il risanamento delle acque del bacino idrografico immediatamente sversante in Laguna – Piano Direttore 2000” &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Nutrient removal to reduce eutrophication, reduce flood risk, increase lost biodiversity&lt;br /&gt;
|Hydromorphological quality elements=Reconnect river to an out-flow wetland and create a more natural morphology inseide the wetland&lt;br /&gt;
|Biological quality elements=Increase ecological status of Macrophytes&lt;br /&gt;
|Physico-chemical quality elements=Reduce Nitrogen, Phosphorous and Organic pollution&lt;br /&gt;
|Other motivation=Increase fruition and biodiversity in general&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=Reshaping the net of canals, ponds and pools inside the wetland&lt;br /&gt;
|Floodplain / River corridor=Hydraulic connection between the river and an outflow wetland&lt;br /&gt;
|Other technical measure=re-establish rare and endangered aquatic vegetation types&lt;br /&gt;
|Social measures=create a net of path and observation structures accessible to the public for recreation, educational and technical-scientific purposes&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9511</id>
		<title>Case study:Salzano wetland and Marzenego river restoration project</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9511"/>
		<updated>2013-04-03T14:00:32Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.53392318370854, 12.131361008214299&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Land use management - forestry, Monitoring, Social benefits, Water quality&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Paolo&lt;br /&gt;
|Main contact surname=Cornelio&lt;br /&gt;
|Contact organisation=Consorzio di Bonifica Acque Risorgive&lt;br /&gt;
|Contact organisation url=www.acquerisorgive.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=IMG 8228web.jpg&lt;br /&gt;
|Picture description=Salzano wetland after restoration&lt;br /&gt;
|Project summary=In order to reduce eutrophication problems that severely impair the quality of the Venice lagoon waters, the local government&lt;br /&gt;
(the Veneto Region Authority), more than a decade ago,established a series of targets for the the reduction of nutrients that&lt;br /&gt;
flow into the lagoon. As a detailed example, The “Salzano wetland” restoration was completed by the consortium which was, until the mid-1980s, subject to mining of clay. Since this period this 60 ha site has gradually been restored. Today this site is characterized by a mosaic of habitats of different spatial extent. The main actions of the project were:&lt;br /&gt;
a)to create a system of new banks around a dry and with low ecological value portion (20 ha wide) of the extent wetland, and later to connect this area with the adjacent watercourse using gates to manage flows; b)reshaping the net of canals, ponds and pools inside this area to find the optimal residual time of the water to assure an efficient nutrient reduction; c)re-establish rare and endangered aquatic vegetation types (Carex elata, Cladium mariscus, Allium angulosum, Cirsium canum, Senecio paludosus, Typha laxmannii, Iris pseudacorus and Nuphar luteum) and monitor their development; d)create a new net of small channels to connect this restored wetland to the other portions; e)create a net of path and observation structures accessible to the public for recreation, educational and technical-scientific purposes.&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Bacino scolante della laguna di Venezia&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Salzano wetland and Marzenego river&lt;br /&gt;
|WFD water body code=666_10&lt;br /&gt;
|WFD water body name=MARZENEGO - OSELLINO (DIRAM.)&lt;br /&gt;
|Pre-project morphology=Artificial channel, &lt;br /&gt;
|Reference morphology=Low gradient passively meandering, &lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Site designation=Italy - Siti di Importanza Comunitaria&lt;br /&gt;
|Local site designation=SIC IT3250008&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Dominant hydrology=Artificially regulated, &lt;br /&gt;
|River corridor land use=Intensive agriculture (arable), &lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mean discharge category=1 - 10 m³/s&lt;br /&gt;
|Average channel gradient category=0.001 - 0.01&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Project started=2007&lt;br /&gt;
|Project completed=2009/10/01&lt;br /&gt;
|Total cost category=1000 - 5000 k€&lt;br /&gt;
|Total1 cost=2,714&lt;br /&gt;
|Funding sources= 	Veneto Region - “Piano per la prevenzione dell’inquinamento ed il risanamento delle acque del bacino idrografico immediatamente sversante in Laguna – Piano Direttore 2000” &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Nutrient removal to reduce eutrophication, reduce flood risk, increase lost biodiversity&lt;br /&gt;
|Hydromorphological quality elements=Reconnect river to an out-flow wetland and create a more natural morphology inseide the wetland&lt;br /&gt;
|Biological quality elements=Increase ecological status of Macrophytes&lt;br /&gt;
|Physico-chemical quality elements=Reduce Nitrogen, Phosphorous and Organic pollution&lt;br /&gt;
|Other motivation=Increase fruition and biodiversity in general&lt;br /&gt;
}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9510</id>
		<title>Case study:Salzano wetland and Marzenego river restoration project</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9510"/>
		<updated>2013-04-03T13:57:50Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.53392318370854, 12.131361008214299&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Land use management - forestry, Monitoring, Social benefits, Water quality&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Paolo&lt;br /&gt;
|Main contact surname=Cornelio&lt;br /&gt;
|Contact organisation=Consorzio di Bonifica Acque Risorgive&lt;br /&gt;
|Contact organisation url=www.acquerisorgive.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=IMG 8228web.jpg&lt;br /&gt;
|Picture description=Salzano wetland after restoration&lt;br /&gt;
|Project summary=In order to reduce eutrophication problems that severely impair the quality of the Venice lagoon waters, the local government&lt;br /&gt;
(the Veneto Region Authority), more than a decade ago,established a series of targets for the the reduction of nutrients that&lt;br /&gt;
flow into the lagoon. As a detailed example, The “Salzano wetland” restoration was completed by the consortium which was, until the mid-1980s, subject to mining of clay. Since this period this 60 ha site has gradually been restored. Today this site is characterized by a mosaic of habitats of different spatial extent. The main actions of the project were:&lt;br /&gt;
a)to create a system of new banks around a dry and with low ecological value portion (20 ha wide) of the extent wetland, and later to connect this area with the adjacent watercourse using gates to manage flows; b)reshaping the net of canals, ponds and pools inside this area to find the optimal residual time of the water to assure an efficient nutrient reduction; c)re-establish rare and endangered aquatic vegetation types (Carex elata, Cladium mariscus, Allium angulosum, Cirsium canum, Senecio paludosus, Typha laxmannii, Iris pseudacorus and Nuphar luteum) and monitor their development; d)create a new net of small channels to connect this restored wetland to the other portions; e)create a net of path and observation structures accessible to the public for recreation, educational and technical-scientific purposes.&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Bacino scolante della laguna di Venezia&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Salzano wetland and Marzenego river&lt;br /&gt;
|WFD water body code=666_10&lt;br /&gt;
|WFD water body name=MARZENEGO - OSELLINO (DIRAM.)&lt;br /&gt;
|Pre-project morphology=Artificial channel, &lt;br /&gt;
|Reference morphology=Low gradient passively meandering, &lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Site designation=Italy - Siti di Importanza Comunitaria&lt;br /&gt;
|Local site designation=SIC IT3250008&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Dominant hydrology=Artificially regulated, &lt;br /&gt;
|River corridor land use=Intensive agriculture (arable), &lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mean discharge category=1 - 10 m³/s&lt;br /&gt;
|Average channel gradient category=0.001 - 0.01&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Project started=2007&lt;br /&gt;
|Project completed=2009/10/01&lt;br /&gt;
|Total cost category=1000 - 5000 k€&lt;br /&gt;
|Total1 cost=2,714&lt;br /&gt;
|Funding sources= 	Veneto Region - “Piano per la prevenzione dell’inquinamento ed il risanamento delle acque del bacino idrografico immediatamente sversante in Laguna – Piano Direttore 2000” &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9509</id>
		<title>Case study:Salzano wetland and Marzenego river restoration project</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9509"/>
		<updated>2013-04-03T13:51:33Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.53392318370854, 12.131361008214299&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Land use management - forestry, Monitoring, Social benefits, Water quality&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Paolo&lt;br /&gt;
|Main contact surname=Cornelio&lt;br /&gt;
|Contact organisation=Consorzio di Bonifica Acque Risorgive&lt;br /&gt;
|Contact organisation url=www.acquerisorgive.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=IMG 8228web.jpg&lt;br /&gt;
|Picture description=Salzano wetland after restoration&lt;br /&gt;
|Project summary=In order to reduce eutrophication problems that severely impair the quality of the Venice lagoon waters, the local government&lt;br /&gt;
(the Veneto Region Authority), more than a decade ago,established a series of targets for the the reduction of nutrients that&lt;br /&gt;
flow into the lagoon. As a detailed example, The “Salzano wetland” restoration was completed by the consortium which was, until the mid-1980s, subject to mining of clay. Since this period this 60 ha site has gradually been restored. Today this site is characterized by a mosaic of habitats of different spatial extent. The main actions of the project were:&lt;br /&gt;
a)to create a system of new banks around a dry and with low ecological value portion (20 ha wide) of the extent wetland, and later to connect this area with the adjacent watercourse using gates to manage flows; b)reshaping the net of canals, ponds and pools inside this area to find the optimal residual time of the water to assure an efficient nutrient reduction; c)re-establish rare and endangered aquatic vegetation types (Carex elata, Cladium mariscus, Allium angulosum, Cirsium canum, Senecio paludosus, Typha laxmannii, Iris pseudacorus and Nuphar luteum) and monitor their development; d)create a new net of small channels to connect this restored wetland to the other portions; e)create a net of path and observation structures accessible to the public for recreation, educational and technical-scientific purposes.&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Bacino scolante della laguna di Venezia&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Salzano wetland and Marzenego river&lt;br /&gt;
|WFD water body code=666_10&lt;br /&gt;
|WFD water body name=MARZENEGO - OSELLINO (DIRAM.)&lt;br /&gt;
|Pre-project morphology=Artificial channel, &lt;br /&gt;
|Reference morphology=Low gradient passively meandering, &lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Site designation=Italy - Siti di Importanza Comunitaria&lt;br /&gt;
|Local site designation=SIC IT3250008&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Dominant hydrology=Artificially regulated, &lt;br /&gt;
|River corridor land use=Intensive agriculture (arable), &lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mean discharge category=1 - 10 m³/s&lt;br /&gt;
|Average channel gradient category=0.001 - 0.01&lt;br /&gt;
}}&lt;br /&gt;
{{Project background}}&lt;br /&gt;
{{Motivations}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9508</id>
		<title>Case study:Salzano wetland and Marzenego river restoration project</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9508"/>
		<updated>2013-04-03T13:50:18Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.53392318370854, 12.131361008214299&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Land use management - forestry, Monitoring, Social benefits, Water quality&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Paolo&lt;br /&gt;
|Main contact surname=Cornelio&lt;br /&gt;
|Contact organisation=Consorzio di Bonifica Acque Risorgive&lt;br /&gt;
|Contact organisation url=www.acquerisorgive.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=IMG 8228web.jpg&lt;br /&gt;
|Picture description=Salzano wetland after restoration&lt;br /&gt;
|Project summary=In order to reduce eutrophication problems that severely impair the quality of the Venice lagoon waters, the local government&lt;br /&gt;
(the Veneto Region Authority), more than a decade ago,established a series of targets for the the reduction of nutrients that&lt;br /&gt;
flow into the lagoon. As a detailed example, The “Salzano wetland” restoration was completed by the consortium which was, until the mid-1980s, subject to mining of clay. Since this period this 60 ha site has gradually been restored. Today this site is characterized by a mosaic of habitats of different spatial extent. The main actions of the project were:&lt;br /&gt;
. to create a system of new banks around a dry and with low ecological value portion (20 ha wide) of the extent wetland, and later to connect this area with the adjacent watercourse using gates to manage flows;&lt;br /&gt;
• reshaping the net of canals, ponds and pools inside this area to find the optimal residual time of the water to assure an efficient nutrient reduction;&lt;br /&gt;
• re-establish rare and endangered aquatic vegetation types (Carex elata, Cladium mariscus, Allium angulosum, Cirsium canum, Senecio paludosus, Typha laxmannii, Iris pseudacorus and Nuphar luteum) and monitor their development;&lt;br /&gt;
• create a new net of small channels to connect this restored wetland to the other portions;&lt;br /&gt;
• create a net of path and observation structures accessible to the public for recreation, educational and technical-scientific purposes.&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Bacino scolante della laguna di Venezia&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Salzano wetland and Marzenego river&lt;br /&gt;
|WFD water body code=666_10&lt;br /&gt;
|WFD water body name=MARZENEGO - OSELLINO (DIRAM.)&lt;br /&gt;
|Pre-project morphology=Artificial channel, &lt;br /&gt;
|Reference morphology=Low gradient passively meandering, &lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Site designation=Italy - Siti di Importanza Comunitaria&lt;br /&gt;
|Local site designation=SIC IT3250008&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Dominant hydrology=Artificially regulated, &lt;br /&gt;
|River corridor land use=Intensive agriculture (arable), &lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mean discharge category=1 - 10 m³/s&lt;br /&gt;
|Average channel gradient category=0.001 - 0.01&lt;br /&gt;
}}&lt;br /&gt;
{{Project background}}&lt;br /&gt;
{{Motivations}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=File:IMG_8228web.jpg&amp;diff=9507</id>
		<title>File:IMG 8228web.jpg</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=File:IMG_8228web.jpg&amp;diff=9507"/>
		<updated>2013-04-03T13:46:44Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9506</id>
		<title>Case study:Salzano wetland and Marzenego river restoration project</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9506"/>
		<updated>2013-04-03T13:37:28Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.53392318370854, 12.131361008214299&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Project title=Salzano wetland and Marzenego river restoration project&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Land use management - forestry, Monitoring, Social benefits, Water quality&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Paolo&lt;br /&gt;
|Main contact surname=Cornelio&lt;br /&gt;
|Contact organisation=Consorzio di Bonifica Acque Risorgive&lt;br /&gt;
|Contact organisation url=www.acquerisorgive.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Bacino scolante della laguna di Venezia&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Salzano wetland and Marzenego river&lt;br /&gt;
|WFD water body code=666_10&lt;br /&gt;
|WFD water body name=MARZENEGO - OSELLINO (DIRAM.)&lt;br /&gt;
|Pre-project morphology=Artificial channel, &lt;br /&gt;
|Reference morphology=Low gradient passively meandering, &lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Site designation=Italy - Siti di Importanza Comunitaria&lt;br /&gt;
|Local site designation=SIC IT3250008&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Dominant hydrology=Artificially regulated, &lt;br /&gt;
|River corridor land use=Intensive agriculture (arable), &lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mean discharge category=1 - 10 m³/s&lt;br /&gt;
|Average channel gradient category=0.001 - 0.01&lt;br /&gt;
}}&lt;br /&gt;
{{Project background}}&lt;br /&gt;
{{Motivations}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9505</id>
		<title>Case study:Salzano wetland and Marzenego river restoration project</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9505"/>
		<updated>2013-04-03T13:25:47Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.53392318370854, 12.131361008214299&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Project title=Salzano wetland and Marzenego river restoration project&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Land use management - forestry, Monitoring, Social benefits, Water quality&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Paolo&lt;br /&gt;
|Main contact surname=Cornelio&lt;br /&gt;
|Contact organisation=Consorzio di Bonifica Acque Risorgive&lt;br /&gt;
|Contact organisation url=www.acquerisorgive.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Bacino scolante della laguna di Venezia&lt;br /&gt;
}}&lt;br /&gt;
{{Site}}&lt;br /&gt;
{{Project background}}&lt;br /&gt;
{{Motivations}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9504</id>
		<title>Case study:Salzano wetland and Marzenego river restoration project</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Salzano_wetland_and_Marzenego_river_restoration_project&amp;diff=9504"/>
		<updated>2013-04-03T13:25:23Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: Created page with &amp;quot;{{Case study status |Approval status=Draft }} {{Location |Location=45.53392318370854, 12.131361008214299 }} {{Project overview |Project title=Salzano wetland and Marzenego riv...&amp;quot;&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.53392318370854, 12.131361008214299&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Project title=Salzano wetland and Marzenego river restoration project&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Land use management - forestry, Monitoring, Social benefits, Water quality&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Paolo&lt;br /&gt;
|Main contact surname=Cornelio&lt;br /&gt;
|Contact organisation=Consorzio di Bonifica Acque Risorgive&lt;br /&gt;
|Contact organisation url=www.acquerisorgive.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment}}&lt;br /&gt;
{{Site}}&lt;br /&gt;
{{Project background}}&lt;br /&gt;
{{Motivations}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Pagana_canal_restoration_project&amp;diff=9503</id>
		<title>Case study:Pagana canal restoration project</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Pagana_canal_restoration_project&amp;diff=9503"/>
		<updated>2013-04-03T10:52:21Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.500820848573014, 12.289969682824449&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Land use management - agriculture, Spatial planning, Water quality&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Paolo&lt;br /&gt;
|Main contact surname=Cornelio&lt;br /&gt;
|Contact organisation=Consorzio di Bonifica Acque Risorgive&lt;br /&gt;
|Contact organisation url=http://www.acquerisorgive.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Pagana canal overview.jpg&lt;br /&gt;
|Picture description=The restored portion of Pagana canal&lt;br /&gt;
|Project summary=The Consorzio di Bonifica Acque Risorgive (drainage authority) is located within the pumped drainage landscape of the Venice Lagoon. The Consorzio was involved in some restoration projects aimed at developing a catchment strategy to reduce nutrient loads entering the Venice Lagoon from its rivers. The bed of Pagana Canal (3.5 km)  was covered  with cement, and thus its contribution to the biodiversity of agricultural-forest habitats and to the reduction of N and P loads to Venice Lagoon was almost non-existent. The restoration project carried out these actions:&lt;br /&gt;
&lt;br /&gt;
a) Total removal of cement covers: the cement cover (240 cm wide on the bottom and 320 cm wide at the top, with 150 cm high side&lt;br /&gt;
banks) was completely removed in a 1.5 km long reach.&lt;br /&gt;
b) Partial removal of cement covers: near buildings the cement cover was left in place or only partially removed, creating a flooding area and banks with reduced slope.&lt;br /&gt;
c)Widening and diversification of the reaches: the new section of the Pagana Canal is variable in size, with long reaches 12 m large and larger size in the central section (15-70 m). The presence of wide banks with reduced slope allowed reducing erosion and increasing the number of vegetation species in the riparian area and, more in general, a larger water-vegetation contact zone. Morphological changes in the riverbed enhanced biological complexity thus increasing the buffering actions on nutrients, which enter the food-web of the wet biotopes.&lt;br /&gt;
d)Creation of ponds and wetlands: ponds and wetlands of different depths were constructed at the joining with the main tributaries. The presence of wetlands along the watercourse allowed to further enhancing biodiversity with increases in water quality and the landscape and natural value of the area.&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Bacino scolante della laguna di Venezia&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Fossa Pagana near Favaro&lt;br /&gt;
|WFD water body code=668_10&lt;br /&gt;
|WFD water body name=FOSSA PAGANA - COLLETTORE DI LEVANTE&lt;br /&gt;
|Pre-project morphology=Artificial bed, &lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Protected species present=No&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Dominant hydrology=Artificially regulated, &lt;br /&gt;
|Dominant substrate=Clay, &lt;br /&gt;
|River corridor land use=Urban, &lt;br /&gt;
|Average bankfull channel width category=5 - 10 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mean discharge category=0.1 - 1.0 m³/s&lt;br /&gt;
|Average channel gradient category=0.001 - 0.01&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=3,500&lt;br /&gt;
|Project started=2002&lt;br /&gt;
|Project completed=2004/10/01&lt;br /&gt;
|Total cost category=5000 - 10000 k€&lt;br /&gt;
|Total1 cost=4,648&lt;br /&gt;
|Funding sources= 	Veneto Region - “Piano per la prevenzione dell’inquinamento ed il risanamento delle acque del bacino idrografico immediatamente sversante in Laguna – Piano Direttore 2000” &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Nutrient removal to reduce eutrophication, reduce flood risk&lt;br /&gt;
|Hydromorphological quality elements=Create a more natural and wide channel morphology&lt;br /&gt;
|Biological quality elements=Increase ecological status of Fish, Macrophytes, Macrozoobenthos&lt;br /&gt;
|Physico-chemical quality elements=Reduce Nitrogen, Phosphorous and Organic pollution&lt;br /&gt;
|Other motivation=Increase fruition and biodiversity in general in a agricultural and urban contest&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=removal of cement covers and bed enalrgemnent and diversification&lt;br /&gt;
|Planform / Channel pattern=Channel widening&lt;br /&gt;
|Other technical measure=Creation of in-stream wetland and ponds&lt;br /&gt;
|Management interventions= 	Adoption of new practices for acquatic vegetation management ; punping water to an adjacent newly afforested riparian buffer for nitrogen and phosphorous removal &lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Fossa pagana 1.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Fossa pagana 2.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Case study documents&lt;br /&gt;
|File name=Venice lagoon RR ecrr conference english version.pdf&lt;br /&gt;
}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=www.acquerisorgive.it/page.asp?m=18&lt;br /&gt;
|Description=A website section dedicated to river restoration projects, studies and monitoring results by Consorzio Acque Risorgive &lt;br /&gt;
}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Pagana_canal_restoration_project&amp;diff=9502</id>
		<title>Case study:Pagana canal restoration project</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Pagana_canal_restoration_project&amp;diff=9502"/>
		<updated>2013-04-03T10:52:00Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.500820848573014, 12.289969682824449&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Land use management - agriculture, Spatial planning, Water quality&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Paolo&lt;br /&gt;
|Main contact surname=Cornelio&lt;br /&gt;
|Contact organisation=Consorzio di Bonifica Acque Risorgive&lt;br /&gt;
|Contact organisation url=http://www.acquerisorgive.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Pagana canal overview.jpg&lt;br /&gt;
|Picture description=The restored portion of Pagana canal&lt;br /&gt;
|Project summary=The Consorzio di Bonifica Acque Risorgive (drainage authority) is located within the pumped drainage landscape of the Venice Lagoon. The Consorzio was involved in some restoration projects aimed at developing a catchment strategy to reduce nutrient loads entering the Venice Lagoon from its rivers. The bed of Pagana Canal (3.5 km)  was covered  with cement, and thus its contribution to the biodiversity of agricultural-forest habitats and to the reduction of N and P loads to Venice Lagoon was almost non-existent. The restoration project carried out these actions:&lt;br /&gt;
&lt;br /&gt;
a) Total removal of cement covers: the cement cover (240 cm wide on the bottom and 320 cm wide at the top, with 150 cm high side&lt;br /&gt;
banks) was completely removed in a 1.5 km long reach.&lt;br /&gt;
b) Partial removal of cement covers: near buildings the cement cover was left in place or only partially removed, creating a flooding area and banks with reduced slope.&lt;br /&gt;
c)Widening and diversification of the reaches: the new section of the Pagana Canal is variable in size, with long reaches 12 m large and larger size in the central section (15-70 m). The presence of wide banks with reduced slope allowed reducing erosion and increasing the number of vegetation species in the riparian area and, more in general, a larger water-vegetation contact zone. Morphological changes in the riverbed enhanced biological complexity thus increasing the buffering actions on nutrients, which enter the food-web of the wet biotopes.&lt;br /&gt;
d)Creation of ponds and wetlands: ponds and wetlands of different depths were constructed at the joining with the main tributaries. The presence of wetlands along the watercourse allowed to further enhancing biodiversity with increases in water quality and the landscape and natural value of the area.&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Bacino scolante della laguna di Venezia&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Fossa Pagana near Favaro&lt;br /&gt;
|WFD water body code=668_10&lt;br /&gt;
|WFD water body name=FOSSA PAGANA - COLLETTORE DI LEVANTE&lt;br /&gt;
|Pre-project morphology=Artificial bed, &lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Protected species present=No&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Dominant hydrology=Artificially regulated, &lt;br /&gt;
|Dominant substrate=Clay, &lt;br /&gt;
|River corridor land use=Urban, &lt;br /&gt;
|Average bankfull channel width category=5 - 10 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mean discharge category=0.1 - 1.0 m³/s&lt;br /&gt;
|Average channel gradient category=0.001 - 0.01&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=3,500&lt;br /&gt;
|Project started=2002&lt;br /&gt;
|Project completed=2004/10/01&lt;br /&gt;
|Total cost category=5000 - 10000 k€&lt;br /&gt;
|Total1 cost=4,648&lt;br /&gt;
|Funding sources= 	Veneto Region - “Piano per la prevenzione dell’inquinamento ed il risanamento delle acque del bacino idrografico immediatamente sversante in Laguna – Piano Direttore 2000” &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Nutrient removal to reduce eutrophication, reduce flood risk&lt;br /&gt;
|Hydromorphological quality elements=Create a more natural and wide channel morphology&lt;br /&gt;
|Biological quality elements=Increase ecological status of Fish, Macrophytes, Macrozoobenthos&lt;br /&gt;
|Physico-chemical quality elements=Reduce Nitrogen, Phosphorous and Organic pollution&lt;br /&gt;
|Other motivation=Increase fruition and biodiversity in general in a agricultural and urban contest&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=removal of cement covers and bed enalrgemnent and diversification&lt;br /&gt;
|Planform / Channel pattern=Channel widening &lt;br /&gt;
|Other technical measure=Creation of in-stream wetland and ponds&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Fossa pagana 1.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Fossa pagana 2.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Case study documents&lt;br /&gt;
|File name=Venice lagoon RR ecrr conference english version.pdf&lt;br /&gt;
}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=www.acquerisorgive.it/page.asp?m=18&lt;br /&gt;
|Description=A website section dedicated to river restoration projects, studies and monitoring results by Consorzio Acque Risorgive &lt;br /&gt;
}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Pagana_canal_restoration_project&amp;diff=9501</id>
		<title>Case study:Pagana canal restoration project</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Pagana_canal_restoration_project&amp;diff=9501"/>
		<updated>2013-04-03T10:50:11Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.500820848573014, 12.289969682824449&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Land use management - agriculture, Spatial planning, Water quality&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Paolo&lt;br /&gt;
|Main contact surname=Cornelio&lt;br /&gt;
|Contact organisation=Consorzio di Bonifica Acque Risorgive&lt;br /&gt;
|Contact organisation url=http://www.acquerisorgive.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Pagana canal overview.jpg&lt;br /&gt;
|Picture description=The restored portion of Pagana canal&lt;br /&gt;
|Project summary=The Consorzio di Bonifica Acque Risorgive (drainage authority) is located within the pumped drainage landscape of the Venice Lagoon. The Consorzio was involved in some restoration projects aimed at developing a catchment strategy to reduce nutrient loads entering the Venice Lagoon from its rivers. The bed of Pagana Canal (3.5 km)  was covered  with cement, and thus its contribution to the biodiversity of agricultural-forest habitats and to the reduction of N and P loads to Venice Lagoon was almost non-existent. The restoration project carried out these actions:&lt;br /&gt;
&lt;br /&gt;
a) Total removal of cement covers: the cement cover (240 cm wide on the bottom and 320 cm wide at the top, with 150 cm high side&lt;br /&gt;
banks) was completely removed in a 1.5 km long reach.&lt;br /&gt;
b) Partial removal of cement covers: near buildings the cement cover was left in place or only partially removed, creating a flooding area and banks with reduced slope.&lt;br /&gt;
c)Widening and diversification of the reaches: the new section of the Pagana Canal is variable in size, with long reaches 12 m large and larger size in the central section (15-70 m). The presence of wide banks with reduced slope allowed reducing erosion and increasing the number of vegetation species in the riparian area and, more in general, a larger water-vegetation contact zone. Morphological changes in the riverbed enhanced biological complexity thus increasing the buffering actions on nutrients, which enter the food-web of the wet biotopes.&lt;br /&gt;
d)Creation of ponds and wetlands: ponds and wetlands of different depths were constructed at the joining with the main tributaries. The presence of wetlands along the watercourse allowed to further enhancing biodiversity with increases in water quality and the landscape and natural value of the area.&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Bacino scolante della laguna di Venezia&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Fossa Pagana near Favaro&lt;br /&gt;
|WFD water body code=668_10&lt;br /&gt;
|WFD water body name=FOSSA PAGANA - COLLETTORE DI LEVANTE&lt;br /&gt;
|Pre-project morphology=Artificial bed, &lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Protected species present=No&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Dominant hydrology=Artificially regulated, &lt;br /&gt;
|Dominant substrate=Clay, &lt;br /&gt;
|River corridor land use=Urban, &lt;br /&gt;
|Average bankfull channel width category=5 - 10 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mean discharge category=0.1 - 1.0 m³/s&lt;br /&gt;
|Average channel gradient category=0.001 - 0.01&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=3,500&lt;br /&gt;
|Project started=2002&lt;br /&gt;
|Project completed=2004/10/01&lt;br /&gt;
|Total cost category=5000 - 10000 k€&lt;br /&gt;
|Total1 cost=4,648&lt;br /&gt;
|Funding sources= 	Veneto Region - “Piano per la prevenzione dell’inquinamento ed il risanamento delle acque del bacino idrografico immediatamente sversante in Laguna – Piano Direttore 2000” &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Nutrient removal to reduce eutrophication, reduce flood risk&lt;br /&gt;
|Hydromorphological quality elements=Create a more natural and wide channel morphology&lt;br /&gt;
|Biological quality elements=Increase ecological status of Fish, Macrophytes, Macrozoobenthos&lt;br /&gt;
|Physico-chemical quality elements=Reduce Nitrogen, Phosphorous and Organic pollution&lt;br /&gt;
|Other motivation=Increase fruition and biodiversity in general in a agricultural and urban contest&lt;br /&gt;
}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Fossa pagana 1.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Fossa pagana 2.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Case study documents&lt;br /&gt;
|File name=Venice lagoon RR ecrr conference english version.pdf&lt;br /&gt;
}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=www.acquerisorgive.it/page.asp?m=18&lt;br /&gt;
|Description=A website section dedicated to river restoration projects, studies and monitoring results by Consorzio Acque Risorgive &lt;br /&gt;
}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Zero_river_restoration_project&amp;diff=9500</id>
		<title>Case study:Zero river restoration project</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Zero_river_restoration_project&amp;diff=9500"/>
		<updated>2013-04-03T10:48:18Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.561601631043686, 12.33535480525461&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Land use management - agriculture, Land use management - forestry, Monitoring, Social benefits, Water quality&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Paolo&lt;br /&gt;
|Main contact surname=Cornelio&lt;br /&gt;
|Contact organisation=p.cornelio@acquerisorgive.it&lt;br /&gt;
|Contact organisation url=http://www.acquerisorgive.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Zero river.jpg&lt;br /&gt;
|Picture description=The Zero river at the beginning of the restored portion&lt;br /&gt;
|Project summary=The Consorzio di Bonifica Acque Risorgive (drainage authority) is located within the pumped drainage landscape of the Venice Lagoon. The Consorzio was involved in a big project aimed at developing a catchment strategy to reduce nutrient loads entering the Venice Lagoon from its rivers. To achieve this goal, the Consorzio planned a major river restoration project for the Zero River, which drains into the lagoon. &lt;br /&gt;
The main restoration actions carried out regarded: banks widening, increase of aquatic vegetation on river terraces, creation of lateral and inflow wetland (ponds and lakes) and creation of wooded riparian area irrigated by river water.&lt;br /&gt;
Within this project a pilot experimental system was built along the Zero River, to evaluate in particular the buffering efficiency of the wooded areas on non-point pollution sources of nitrogen.&lt;br /&gt;
On the experimental site, represented by a newly-established riparian woodland, the hydrology of the woodland is totally regulated through a series of pumps which irrigate the woodland with water coming from Zero River, through a series of parallel ditches (irrigation and drainage ditches).&lt;br /&gt;
The results of this study provided interesting suggestions for improving the management of riparian buffer zones.&lt;br /&gt;
&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Bacino scolante della laguna di Venezia&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Zero river&lt;br /&gt;
|WFD water body code=673_32&lt;br /&gt;
|WFD water body name=Zero river&lt;br /&gt;
|Pre-project morphology=Artificial channel, &lt;br /&gt;
|Reference morphology=Low gradient passively meandering, &lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Dominant hydrology=Groundwater, &lt;br /&gt;
|Dominant substrate=Clay, &lt;br /&gt;
|River corridor land use=Intensive agriculture (arable), &lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=2 - 5 m&lt;br /&gt;
|Mean discharge category=1 - 10 m³/s&lt;br /&gt;
|Average channel gradient category=0.001 - 0.01&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=7,000&lt;br /&gt;
|Project started=1999&lt;br /&gt;
|Project completed=2004/01/01&lt;br /&gt;
|Total cost category=5000 - 10000 k€&lt;br /&gt;
|Total1 cost=7,230&lt;br /&gt;
|Funding sources= 	Veneto Region - “Piano per la prevenzione dell’inquinamento ed il risanamento delle acque del bacino idrografico immediatamente sversante in Laguna – Piano Direttore 2000” &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Nutrient removal to reduce eutrophication, reduce flood risk&lt;br /&gt;
|Hydromorphological quality elements=Create a more natural and wide channel morphology&lt;br /&gt;
|Biological quality elements=Increase ecological status of Fish, Macrophytes, Macrozoobenthos&lt;br /&gt;
|Physico-chemical quality elements=Reduce Nitrogen, Phosphorous and Organic pollution&lt;br /&gt;
|Other motivation=Increase fruition and biodiversity in general in a agricultural and urban contest&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=Bed enlargement &lt;br /&gt;
|Floodplain / River corridor=Creation and riconnection of floodplain and new buffer strips &lt;br /&gt;
|Planform / Channel pattern=Channel widening, &lt;br /&gt;
|Other technical measure=Creation of in-stream wetland and connection with an out-stream wetland &lt;br /&gt;
|Management interventions=Adoption of new practices for acquatic vegetation management ; punping water to an adjacent newly afforested riparian buffer for nitrogen and phosphorous removal&lt;br /&gt;
|Social measures=Involvement of farmers in buffer strips plantation ;  education of students&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{Biological quality element table row&lt;br /&gt;
|Element=Fish&lt;br /&gt;
|Monitored before=No&lt;br /&gt;
|Monitored after=Yes&lt;br /&gt;
|Qualitative monitoring=No&lt;br /&gt;
|Quantitative monitoring=Yes&lt;br /&gt;
|Control site used=No&lt;br /&gt;
}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{Physico-chemical quality element table row&lt;br /&gt;
|Element=Nutrient concentrations&lt;br /&gt;
|Monitored before=No&lt;br /&gt;
|Monitored after=Yes&lt;br /&gt;
|Qualitative monitoring=No&lt;br /&gt;
|Quantitative monitoring=No&lt;br /&gt;
|Control site used=Yes&lt;br /&gt;
|Result=Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Case study monitoring documents&lt;br /&gt;
|Monitoring document=Summary Journal of applied ecology Nitrogen removal riparian buffer.pdf&lt;br /&gt;
|Description=Monitoring of nitrogen removal in the riparian buffer - summary&lt;br /&gt;
}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Zero river after restoration.jpg&lt;br /&gt;
|Caption=Zero river after restoration&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=In stream wetland.jpg&lt;br /&gt;
|Caption=In stream wetland&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Newly afforested riparian buffer.jpg&lt;br /&gt;
|Caption=Newly afforested riparian buffer&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Zero river widening.jpg&lt;br /&gt;
|Caption=Zero river widening&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Case study documents&lt;br /&gt;
|File name=Venice lagoon RR ecrr conference english version.pdf&lt;br /&gt;
}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=http://onlinelibrary.wiley.com/doi/10.1111/j.1365-2664.2011.02025.x/abstract&lt;br /&gt;
|Description=Scientific paper on monitoring of the riparian buffer&lt;br /&gt;
}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=http://www.acquerisorgive.it/page.asp?m=18&lt;br /&gt;
|Description=A website section dedicated to river restoration projects, studies and monitoring results by Consorzio Acque Risorgive&lt;br /&gt;
}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Pagana_canal_restoration_project&amp;diff=9499</id>
		<title>Case study:Pagana canal restoration project</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Pagana_canal_restoration_project&amp;diff=9499"/>
		<updated>2013-04-03T10:47:51Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.500820848573014, 12.289969682824449&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Land use management - agriculture, Spatial planning, Water quality&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Paolo&lt;br /&gt;
|Main contact surname=Cornelio&lt;br /&gt;
|Contact organisation=Consorzio di Bonifica Acque Risorgive&lt;br /&gt;
|Contact organisation url=http://www.acquerisorgive.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Pagana canal overview.jpg&lt;br /&gt;
|Picture description=The restored portion of Pagana canal&lt;br /&gt;
|Project summary=The Consorzio di Bonifica Acque Risorgive (drainage authority) is located within the pumped drainage landscape of the Venice Lagoon. The Consorzio was involved in some restoration projects aimed at developing a catchment strategy to reduce nutrient loads entering the Venice Lagoon from its rivers. The bed of Pagana Canal (3.5 km)  was covered  with cement, and thus its contribution to the biodiversity of agricultural-forest habitats and to the reduction of N and P loads to Venice Lagoon was almost non-existent. The restoration project carried out these actions:&lt;br /&gt;
&lt;br /&gt;
a) Total removal of cement covers: the cement cover (240 cm wide on the bottom and 320 cm wide at the top, with 150 cm high side&lt;br /&gt;
banks) was completely removed in a 1.5 km long reach.&lt;br /&gt;
b) Partial removal of cement covers: near buildings the cement cover was left in place or only partially removed, creating a flooding area and banks with reduced slope.&lt;br /&gt;
c)Widening and diversification of the reaches: the new section of the Pagana Canal is variable in size, with long reaches 12 m large and larger size in the central section (15-70 m). The presence of wide banks with reduced slope allowed reducing erosion and increasing the number of vegetation species in the riparian area and, more in general, a larger water-vegetation contact zone. Morphological changes in the riverbed enhanced biological complexity thus increasing the buffering actions on nutrients, which enter the food-web of the wet biotopes.&lt;br /&gt;
d)Creation of ponds and wetlands: ponds and wetlands of different depths were constructed at the joining with the main tributaries. The presence of wetlands along the watercourse allowed to further enhancing biodiversity with increases in water quality and the landscape and natural value of the area.&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Bacino scolante della laguna di Venezia&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Fossa Pagana near Favaro&lt;br /&gt;
|WFD water body code=668_10&lt;br /&gt;
|WFD water body name=FOSSA PAGANA - COLLETTORE DI LEVANTE&lt;br /&gt;
|Pre-project morphology=Artificial bed, &lt;br /&gt;
|Heavily modified water body=No&lt;br /&gt;
|Protected species present=No&lt;br /&gt;
|Invasive species present=No&lt;br /&gt;
|Dominant hydrology=Artificially regulated, &lt;br /&gt;
|Dominant substrate=Clay, &lt;br /&gt;
|River corridor land use=Urban, &lt;br /&gt;
|Average bankfull channel width category=5 - 10 m&lt;br /&gt;
|Average bankfull channel depth category=0.5 - 2 m&lt;br /&gt;
|Mean discharge category=0.1 - 1.0 m³/s&lt;br /&gt;
|Average channel gradient category=0.001 - 0.01&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=3,500&lt;br /&gt;
|Project started=2002&lt;br /&gt;
|Project completed=2004/10/01&lt;br /&gt;
|Total cost category=5000 - 10000 k€&lt;br /&gt;
|Total1 cost=4,648&lt;br /&gt;
|Funding sources= 	Veneto Region - “Piano per la prevenzione dell’inquinamento ed il risanamento delle acque del bacino idrografico immediatamente sversante in Laguna – Piano Direttore 2000” &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations}}&lt;br /&gt;
{{Measures}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Fossa pagana 1.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Fossa pagana 2.jpg&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Case study documents&lt;br /&gt;
|File name=Venice lagoon RR ecrr conference english version.pdf&lt;br /&gt;
}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=www.acquerisorgive.it/page.asp?m=18&lt;br /&gt;
|Description=A website section dedicated to river restoration projects, studies and monitoring results by Consorzio Acque Risorgive &lt;br /&gt;
}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
	<entry>
		<id>https://restorerivers.eu/wiki/index.php?title=Case_study:Zero_river_restoration_project&amp;diff=9498</id>
		<title>Case study:Zero river restoration project</title>
		<link rel="alternate" type="text/html" href="https://restorerivers.eu/wiki/index.php?title=Case_study:Zero_river_restoration_project&amp;diff=9498"/>
		<updated>2013-04-03T10:47:08Z</updated>

		<summary type="html">&lt;p&gt;Bozbru: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Case study status&lt;br /&gt;
|Approval status=Draft&lt;br /&gt;
}}&lt;br /&gt;
{{Location&lt;br /&gt;
|Location=45.561601631043686, 12.33535480525461&lt;br /&gt;
}}&lt;br /&gt;
{{Project overview&lt;br /&gt;
|Status=Complete&lt;br /&gt;
|Themes=Flood risk management, Habitat and biodiversity, Land use management - agriculture, Land use management - forestry, Monitoring, Social benefits, Water quality&lt;br /&gt;
|Country=Italy&lt;br /&gt;
|Main contact forename=Paolo&lt;br /&gt;
|Main contact surname=Cornelio&lt;br /&gt;
|Contact organisation=p.cornelio@acquerisorgive.it&lt;br /&gt;
|Contact organisation url=http://www.acquerisorgive.it/&lt;br /&gt;
|Multi-site=No&lt;br /&gt;
|Project picture=Zero river.jpg&lt;br /&gt;
|Picture description=The Zero river at the beginning of the restored portion&lt;br /&gt;
|Project summary=The Consorzio di Bonifica Acque Risorgive (drainage authority) is located within the pumped drainage landscape of the Venice Lagoon. The Consorzio was involved in a big project aimed at developing a catchment strategy to reduce nutrient loads entering the Venice Lagoon from its rivers. To achieve this goal, the Consorzio planned a major river restoration project for the Zero River, which drains into the lagoon. &lt;br /&gt;
The main restoration actions carried out regarded: banks widening, increase of aquatic vegetation on river terraces, creation of lateral and inflow wetland (ponds and lakes) and creation of wooded riparian area irrigated by river water.&lt;br /&gt;
Within this project a pilot experimental system was built along the Zero River, to evaluate in particular the buffering efficiency of the wooded areas on non-point pollution sources of nitrogen.&lt;br /&gt;
On the experimental site, represented by a newly-established riparian woodland, the hydrology of the woodland is totally regulated through a series of pumps which irrigate the woodland with water coming from Zero River, through a series of parallel ditches (irrigation and drainage ditches).&lt;br /&gt;
The results of this study provided interesting suggestions for improving the management of riparian buffer zones.&lt;br /&gt;
&lt;br /&gt;
}}&lt;br /&gt;
{{Case study subcatchment&lt;br /&gt;
|Subcatchment=Bacino scolante della laguna di Venezia&lt;br /&gt;
}}&lt;br /&gt;
{{Site&lt;br /&gt;
|Name=Zero river&lt;br /&gt;
|WFD water body code=673_32&lt;br /&gt;
|WFD water body name=Zero river&lt;br /&gt;
|Pre-project morphology=Artificial channel, &lt;br /&gt;
|Reference morphology=Low gradient passively meandering, &lt;br /&gt;
|Heavily modified water body=Yes&lt;br /&gt;
|Protected species present=Yes&lt;br /&gt;
|Invasive species present=Yes&lt;br /&gt;
|Dominant hydrology=Groundwater, &lt;br /&gt;
|Dominant substrate=Clay, &lt;br /&gt;
|River corridor land use=Intensive agriculture (arable), &lt;br /&gt;
|Average bankfull channel width category=10 - 50 m&lt;br /&gt;
|Average bankfull channel depth category=2 - 5 m&lt;br /&gt;
|Mean discharge category=1 - 10 m³/s&lt;br /&gt;
|Average channel gradient category=0.001 - 0.01&lt;br /&gt;
}}&lt;br /&gt;
{{Project background&lt;br /&gt;
|Reach length directly affected=7,000&lt;br /&gt;
|Project started=1999&lt;br /&gt;
|Project completed=2004/01/01&lt;br /&gt;
|Total cost category=5000 - 10000 k€&lt;br /&gt;
|Total1 cost=7,230&lt;br /&gt;
|Funding sources= 	Veneto Region - “Piano per la prevenzione dell’inquinamento ed il risanamento delle acque del bacino idrografico immediatamente sversante in Laguna – Piano Direttore 2000” &lt;br /&gt;
}}&lt;br /&gt;
{{Motivations&lt;br /&gt;
|Specific mitigation=Nutrient removal to reduce eutrophication, reduce flood risk&lt;br /&gt;
|Hydromorphological quality elements=Create a more natural and wide channel morphology&lt;br /&gt;
|Biological quality elements=Increase ecological status of Fish, Macrophytes, Macrozoobenthos&lt;br /&gt;
|Physico-chemical quality elements=Reduce Nitrogen, Phosphorous and Organic pollution&lt;br /&gt;
|Other motivation=Increase fruition and biodiversity in general in a agricultural and urban contest&lt;br /&gt;
}}&lt;br /&gt;
{{Measures&lt;br /&gt;
|Bank and bed modifications measure=Bed enlargement &lt;br /&gt;
|Floodplain / River corridor=Creation and riconnection of floodplain and new buffer strips &lt;br /&gt;
|Planform / Channel pattern=Channel widening, &lt;br /&gt;
|Other technical measure=Creation of in-stream wetland and connection with an out-stream wetland &lt;br /&gt;
|Management interventions=Adoption of new practices for acquatic vegetation management ; punping water to an adjacent newly afforested riparian buffer for nitrogen and phosphorous removal&lt;br /&gt;
|Social measures=Involvement of farmers in buffer strips plantation ;  education of students&lt;br /&gt;
}}&lt;br /&gt;
{{Hydromorphological quality elements header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Biological quality elements header}}&lt;br /&gt;
{{Biological quality element table row&lt;br /&gt;
|Element=Fish&lt;br /&gt;
|Monitored before=No&lt;br /&gt;
|Monitored after=Yes&lt;br /&gt;
|Qualitative monitoring=No&lt;br /&gt;
|Quantitative monitoring=Yes&lt;br /&gt;
|Control site used=No&lt;br /&gt;
}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Physico-chemical quality elements header}}&lt;br /&gt;
{{Physico-chemical quality element table row&lt;br /&gt;
|Element=Nutrient concentrations&lt;br /&gt;
|Monitored before=No&lt;br /&gt;
|Monitored after=Yes&lt;br /&gt;
|Qualitative monitoring=No&lt;br /&gt;
|Quantitative monitoring=No&lt;br /&gt;
|Control site used=Yes&lt;br /&gt;
|Result=Improvement&lt;br /&gt;
}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Other responses header}}&lt;br /&gt;
{{End table}}&lt;br /&gt;
{{Monitoring documents}}&lt;br /&gt;
{{Case study monitoring documents&lt;br /&gt;
|Monitoring document=Summary Journal of applied ecology Nitrogen removal riparian buffer.pdf&lt;br /&gt;
|Description=Monitoring of nitrogen removal in the riparian buffer - summary&lt;br /&gt;
}}&lt;br /&gt;
{{Monitoring documents end}}&lt;br /&gt;
{{Image gallery}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Zero river after restoration.jpg&lt;br /&gt;
|Caption=Zero river after restoration&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=In stream wetland.jpg&lt;br /&gt;
|Caption=In stream wetland&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Newly afforested riparian buffer.jpg&lt;br /&gt;
|Caption=Newly afforested riparian buffer&lt;br /&gt;
}}&lt;br /&gt;
{{Case study image&lt;br /&gt;
|File name=Zero river widening.jpg&lt;br /&gt;
|Caption=Zero river widening&lt;br /&gt;
}}&lt;br /&gt;
{{Image gallery end}}&lt;br /&gt;
{{Additional Documents}}&lt;br /&gt;
{{Case study documents&lt;br /&gt;
|File name=Venice lagoon RR ecrr conference english version.pdf&lt;br /&gt;
}}&lt;br /&gt;
{{Additional Documents end}}&lt;br /&gt;
{{Additional links and references header}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=http://onlinelibrary.wiley.com/doi/10.1111/j.1365-2664.2011.02025.x/abstract&lt;br /&gt;
|Description=Scientific paper on monitoring of the riparian buffer&lt;br /&gt;
}}&lt;br /&gt;
{{Additional links and references&lt;br /&gt;
|Link=http://http://http://www.acquerisorgive.it/page.asp?m=18&lt;br /&gt;
|Description=A website section dedicated to river restoration projects, studies and monitoring results by Consorzio Acque Risorgive &lt;br /&gt;
}}&lt;br /&gt;
{{Additional links and references footer}}&lt;br /&gt;
{{Supplementary Information}}&lt;/div&gt;</summary>
		<author><name>Bozbru</name></author>
	</entry>
</feed>